Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Correspondence
Ms. Angelina Conn City of Carmel Department of Community Services One Civic Square, 3rd Fir. Carmel, IN 46032 Re: Ms. Conn: P/Z Department Review Comments St. Mary and St. Mark Coptic Orthodox Church Docket No. 11100013 SU Docket No. 11100014 V Afr, Nyor November 21, 2011 Please find enclosed a set of plans that addresses the P/Z Department Comments. We realize the more comments will need to be addressed when we submit construction documents, but we have addressed the comments with as much information as we know at this time. Please submit a filled out development standards variance application for the 2 variances; see attached. (They can be withdrawn at a later date, if determined that they are not needed) The height variance request has been submitted and it was determined that a lot coverage variance was not needed. Make sure the public notice meeting time to the newspaper and neighbors reads 6:00 PM. It is suggested to send the notice to the Indianapolis Star newspaper by Noon, two days prior to the printing deadline (317 -444 -7163 or email: publicnotices @indystar.com). This public notice ran in newspaper as required. Please see attached (hardcopy submittal). Please make checks payable to the City of Carmel. The check was submitted with the nine BZA packets. Please provide copies of your correspondence with the TAC members and their correspondence with you. ConnectingSp c s LLC 56 Milford Drive, Suite 2 Hudson, Ohio 44236 (888) 511 -0147 V (330) 653 -3520 F www.connectingspaces.com a 1> s Please see attached (hardcopy submittal). Feel free to bring color and material samples to the BZA meeting. We plan to present a building rendering. i Provide a copy of the Official List of Adjacent Property Owners from Hamilton County Auditor's Office from Indianapolis /Marion County. See confirmation attached. J" Please provide filled out and notarized Placement of Public Notice Sign affidavit. See confirmation attached (hardcopy submittal) Provide the filled out Petitioner's Affidavit of Notice of Public Hearing form. See confirmation attached (hardcopy submittal) Provide the filled out Notice of the Public Hearing before the BZA form. See attached (hardcopy submittal) Please provide proof of notice from the Indy Star. Please see attached (hardcopy submittal). 11!' Please provide green signed return receipts from the certified mailings. Please see attached (hardcopy submittal). Please submit a full set of to -scale plans on 24 x 36 paper or similar size. Please include the landscape plan, photometric plan, drainage plan, utilities plan, etc. Please see attached. ye Please provide a more detailed landscape plan showing plantings on the plan, and with planting details and a planting legend. Also, please provide a tree preservation plan. Please see sheet L101 (24x36) Please provide a photo metric plan with food candle measurements and Tight fixture details. Please see sheet C104 What is the width of the parking spaces? Please label this on the site plan. The parking spaces are to be 9'x20'. We will add that to the next set of drawings. 16. Please show /label any easements on the site plan. ConnectingSpaces LLC 56 Milford Drive, Suite 2 Hudson, Ohio 44236 (888) 511 -0147 V (330) 653 -3520 F www.connectingspaces.com The 50' setback, which, is also the west property line, contains what were old easements, but now not required as the space is dedicated. The church will have to extend the sewer line and provide a 25' easement which is show on C103. T i. Please submit a set of to -scale exterior architecture building elevations. Also, please provide details on the building materials and colors. Please see sheets A201 and A202. X Please provide a floor plan of the building, if available. Floor plans have been included. Please see attached drawings, Sheets A101 and A102. Please label the building dimensions on the site plan, the longest length and widest width. More dimensions have been added to C101 '11Q, Road right of way (if any) will need to be dedicated to the City, per the Thoroughfare Plan. Please work with Gary Duncan in the Engineering Dept. on how much r/w is required. (317 271 2441.) The right of way has already been purchased by the city and the Thoroughfare Plan has been constructed along the frontage of the property. `1. Please label the 50 -ft half road right of way. Prepare an estimated construction cost to comply with the Thoroughfare Plan Alternative 'K Please show a direct path connection from the path along Shelborne Rd. to the building. We have extend the sidewalk on the south side of the building to the street path. ,7„5. Please show bike parking location and bike rack details, per section 27.06 of the ordinance. AL D NW We have add a R/W at the 50 ft mark from the centerline. We have added a CL at the centerline of Shelborne. Transportation Plan; contact the Engineering Dept. for more details. The Thoroughfare Plan improvements have been made and Gary Ducan has informed the church of thea amount that they will need to pay. Per the C3 Plan Pedestrian and Bike Plan map, please also show /label a 6 -ft wide bicycle lane and a 10 -ft wide path along Shelborne Rd. on the site plan. (Please work with David Littlejohn, Alternative Transportation Systems Coordinator, on the details of this; 317 571 2417.) The bike path already has been installed along the frontage of the site when the road was widened and median installed. Con nectingSp &es LLC 56 Milford Drive, Suite 2 Hudson, Ohio 44236 (888) 511 -0147 V (330) 653 -3520 F www.connectingspaces.com Do you propose any fencing? If so please provide details on the fence design location. We will take this into consideration. See C104 and cutsheets. We are now showing a bike parking area near the northwest corner of the proposed building and have a bike parking detail on C101 as well. '2.6 Please show /label the trash dumpster location on the site plan. We are currently showing a dumpster location on the northwest corner of the parking lot, see sheet C101. 2•Z Will the ground sign be up -lit or internally lit? Up -lit Please provide the hours of operation and the schedule /programming for the use of the building. Hours of operation are now shown on C101. 9 Please provide the lot cover percentage. Please include the pavement and building footprints in this calculation. Lot coverage is now shown on C101 Side yard building setbacks for a church are 25 -ft, per zoning ordinance chapter 26.02.08. Please add this to the site layout plan. This has been modified on sheet C101. Please submit the cut sheets and design details of the parking lot pole lighting and the wall mounted light fixtures. The fixtures are more completely specified on C104. See cut sheets attached. No fence is planned. We may add some around the mechanical areas in a future submittal. 3. Please consider using additional LEED or 'green' building practices, such as a white membrane roof, solar panels, skylights, pervious pavers in all or part of the parking area, etc. List is attached. 3 Please label the mechanical equipment locations on the site plan and provide details on how they are screened from view. This includes electric and gas meters. We are not yet complete enough with the design to know where this equipment will be placed. We will address this in future submittals. Please make sure that all exterior light fixtures have flat lenses and 90- degree cut offs, and have shields on the sides that face residential areas. ConnectingSPaCeSLLC 56 Milford Drive, Suite 2 Hudson, Ohio 44236 (888) 511 -0147 V (330) 653 -3520 F www.connectingspaces.com Thank you for your help. £8ThzU AA.. V ConnectingSpaces LLC; ORA/ Donald A. Highlander, AIA President ConnectingSpaces LLC 56 Milford Drive, Suite 2 Hudson, Ohio 44236 (888) 511 -0147 V (330) 653 -3520 F www.connectingspaces.com Conn, Angelina V From: Donald Highlander [donhighlander @gmail corn] Sent: Wednesday, November 23, 2011 6 38 PM To: Duncan, Gary R; Redden, Nick Cc: Conn, Angelina V Subject: RE. St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road Attachments: PreliminaryHydrologyReport.pdf; IndianapolisStMary111123 pdf Nick and Gary, Please find attached a revised PDF. We have addressed the comments from November 21st below and included a written response below following each comment. Thanks for your help! Don Highlander ConnectingSpaces LLC 888 511 -0147 V 440 897 -4332 C From: Duncan, Gary R mailto:gduncan(acarmel.in.govl Sent: Monday, November 21, 2011 3:52 PM To: donOconnectingspaces.com Cc: Barnes, David R; Greg R. Noyes; Greg Ilko; Redden, Nick; Thomas, John G Subject: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road Good afternoon Mr. Highlander. Please find the following comments that are in addition to any comments that have been issued by our office. 1. Please label the existing and proposed rights -of -way The current R/W is at the east property line which is 50' from the center line. The R/W has been purchased by and dedicated to the city. 2. Please confirm that you will comply with the requirements of Section 2.09 of the Zoning Ordinance Compliance with the Thoroughfare Plan is understood. The plan has already been implemented at this property and it will be the plan to maintain it. 3. Please provide a basic drainage summary that includes amount of detention required and amount of detention provided. We have attached a preliminary hydrology report 4. A summary of the storm water quality measures shall be provided and indicated on the drawing sheets. We are showing a bioswale at the pond discharge. We will work with an engineer to determine if this will be sufficient or if other measures will be required. 5. As the design moves forward, we will further evaluate the location of the curb cuts. It is desirable to locate the main entrance as far to the north as possible since preference will be given to the public road approach to the south. The entrance needs to be farther north than indicated. This will affect the median modifications associated with this project. Also, please confirm if the southernmost access will be right -in /right -out or right out only The north driveway is located just south of a major power pole. During the TAC meeting Duke Energy requested the pole not be relocated. 1 Conn, Angelina V From: Sent: To: Cc: Subject: Attachments: Ms. Hunter, You mentioned that may not have received a copy of the Special Use /Variance request for St. Mary and St. Mark Coptic Orthodox Church at the TAC meeting, so I have attached a copy of the current plans. Thank you for your help. Have a great Thanksgiving. Don Highlander Con nectingSpaces 888- 511 -0147 V 440 897 -4332 C Don Highlander [don @connectingspaces.com] Wednesday, November 23, 2011 1108 AM shirley hunter @duke energy.com Conn, Angelina V St. Mary and St. Mark Coptic Orthodox Church 12174 Shelborne Road, Carmel IndianapolisStMary111118 pdf 1 Conn, Angelina V From: Sent: To: Cc: Subject: Attachments: Ms. Hunter, You mentioned that may not have received a copy of the Special Use /Variance request for St. Mary and St. Mark Coptic Orthodox Church at the TAC meeting, so I have attached a copy of the current plans. Thank you for your help. Have a great Thanksgiving. Don Highlander ConnectingSpaces «C 888 511 -0147 V 440 897 -4332 C Don Highlander [don @connectingspaces.com] Wednesday, November 23, 2011 11.06 AM 'Shirley Hunter' Conn, Angelina V St. Mary and St. Mark Coptic Orthodox Church 12174 Shelborne Road, Carmel IndianapolisStMary111118.pdf 1 Conn, Angelina V From: Sent: To: Cc: Subject: Attachments: Nick and Gary, Don Highlander [don @connectingspaces.comj Wednesday, November 23, 2011 11 AM Redden, Nick; Duncan, Gary R Conn, Angelina V FW• St. Mary and St. Mark Coptic Orthodox Church Project Review #1 STMARYANDSTMARKCOPTICORTHODOXCHURCHREV #1 pdf Thank you for the comments we received in your letter of November 15. We will incorporate and address those comments as the project moves forward. The comments that we will try to address immediately are the ones from Gary's e-mail of Monday November 21 (which is below). We should be able to respond Don Highlander ConnectingSpaces 888 511 -0147 V 440 897 -4332 C Good afternoon Mr. Highlander. Please find the following comments that are in addition to any comments that have been issued by our office. 1. Please label the existing and proposed rights -of -way 2. Please confirm that you will comply with the requirements of Section 2.09 of the Zoning Ordinance 3. Please provide a basic drainage summary that includes amount of detention required and amount of detention provided. 4. A summary of the storm water quality measures shall be provided and indicated on the drawing sheets. 5. As the design moves forward, we will further evaluate the location of the curb cuts. It is desirable to locate the main entrance as far to the north as possible since preference will be given to the public road approach to the south. The entrance needs to be farther north than indicated. This will affect the median modifications associated with this project. Also, please confirm if the southernmost access will be right -in /right -out or right out only. 6. The detention pond shall be sized to accommodate flow from the fully developed right -of -way across the frontage. 7. Please indicate bicycle parking on the site plan. 8. Please add the Shelborne Road project pavement section to the plan sheets for use in the median modifications. 9 Please label the aisle width and return radii at each entrance. 10. Please confirm the INDOT warrants for SB auxiliary lanes at each entrance. 11. Please choose a water main connection point that does not require an open pavement cut of Shelborne Road. 12. Does the on -site fire hydrant need to be near one of the entrance drives? 13. Please confirm if the proposed ground sign is in the existing or proposed right -of -way. 14. The front part of the property cannot direct discharge without being treated and detained. The Department assumes this would be the case with the proposed yard inlet on the northeast corner of the site. 15. Is the proposed detention facility outlet at the location proposed in the development plan for the property to the south? Please let me know if you have any questions. Thanks so much, Gary 1 Gary R. Duncan, Jr., PE Assistant City Engineer City of Carmel Department of Engineering One Civic Square Carmel, IN 46032 (317) 571 -2441 (317) 571 -2439 (fax) gduncan @carmel.in.gov From: Redden, Nick [mailto:nredden @carmel.in.govl Sent: Tuesday, November 15, 2011 4:04 PM To: Don Highlander Cc: Conn, Angelina V; Duffy, John M; Pace, Paul V; Arnone, Paul S; Greg .Hoyes@hamiltoncounty.in.gov; Greg Ilko Subject: St. Mary and St. Mark Coptic Orthodox Church Project Review #1 2 Conn, Angelina V From: Sent: To: Cc: Subject: Attachments: Ms. Bailey, Donald Highlander [donhighlander @gmail.com] Wednesday, November 23, 2011 9 AM Bailey, Vicki L Conn, Angelina V St. Mary and St. Mark Coptic Orthodox Church SKMBT_C45111102709170 pdf Thank you for forwarding the letter from Chief Green that he has no issues with the Special Use request for St. Mary and St. Mark Coptic Orthodox Church. Have a great Thanksgiving. Don Highlander ConnectingSpaces 888 -511 -0147 V 440 897 -4332 C From: Bailey, Vicki L [mailto:VBaileyOcarmel.in.gov] Sent: Thursday, October 27, 2011 2:42 PM To: done connectingspaces.com Cc: Conn, Angelina V Subject: Please see the attached letter from Chief Green. Thank you. Vicki L. Bailey Office Administrator Carmel Police Department 3 Civic Square Carmel, Indiana 46032 (317) 571 -2523 (317) 571 -2512 FAX 1 Conn, Angelina V From: Sent: To: Cc: Subject: Mr. Ilko, Thanks for your help and have a great Thanksgiving. Don Highlander ConnectingSpaces L« 888 511 -0147 V 440 897 -4332 C Thanks, Gregory J. Ilko, P.E. CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 Office: 317 780 -1555 ext. 112 Mobile: 317 408 -3609 Fax: 317 780 -6525 Carmel Technical Advisory Committee, Don Highlander [don @connectingspaces corn] Wednesday, November 23, 2011 9:28 AM 'Greg Ilko' Conn, Angelina V RE: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road We will be glad to coordinate with your office after the Special Use process is complete and we have more detailed construction plans. From: Greg Ilko f mailto :gilkocrossroadengineers.comj Sent: Tuesday, October 18, 2011 4:03 PM To: 'Don Highlander' Cc: aconnOcarmel.in.gov; Gary Duncan; Greg Hoyes Subject: RE: St. Mary St. Mark Coptic Orthodox Church I have no comment with regards to the application for the desired to move forward with final construction plans and mailed to my attention for review. 12174 Shelborne Road Special Use permit request. However, at such time as it is drainage calculations, I will require one set of each, full size, From: Don Highlander mailto :don Sent: Tuesday, October 18, 2011 3:56 PM To: Alexia Donahue -Wold; Angie Conn; Bill Akers; Bill Hohlt; Brooke Gajownik; Chris Ellison; Dan Davenport; Daren Mindham; Dave Huffman; David Littlejohn; David Lucas; Doland Wise; Duane Whiting; Gary Duncan; Gary McNamee; Greg Hoyes; Gregory Ilko; Jason Kirkman; Jason Lemaster; Jim Blanchard; Joanie Clark; John Duffy; John Thomas; Mark Westermeier; Nick Redden; Ron Farrand; Ryan Hartman; Shirely Hunter; Steven Krebs; Terry Krueskamp; Tim Green; Troy Yackle Subject: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road 1 Conn, Angelina V From: Don Highlander [don @connectingspaces.comi Sent: Wednesday, November 23, 2011 9:26 AM To: 'Greg R. Noyes' Cc: Conn, Angelina V Subject: RE: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road Greg, Thanks you for your review of this project. Currently we are in preliminary design and from your comments it appears that we will need provide you more information as the design enters more detailed design. After the BZA meeting and when more storm drainage design is completed we will connect again with your office. Have a great Thanksgiving. Don Highlander ConnectingSpaces 888 511 -0147 V 440 897 -4332 C From: Greg R. Hoyes mailto: Greg. Hoves@hamiltoncounty.in.aovl Sent: Monday, November 14, 2011 11:05 AM To: 'Don Highlander' Cc: Angie Conn; Dave Barnes; David E. Lucas; Gary Duncan; Greg Ilko; John Thomas Subject: RE: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road Don Attached is your review letter for the St. Mary St. Mark Coptic Orthodox Church project. If you have any questions, please let me know. ��i{�� ae, e5,m, e £se Plan Reviewer Hamilton County Surveyor's Office One Hamilton County Square Suite 188 Noblesville, IN. 46060 Phone: (317) 776 -8495 Fax: (317) 776 -9628 Greq.Hones@ hamiltoncountv.in.gov Website• www.hamiltoncounty.in.gov From: Don Highlander mailto :donOconnectingsgaces.coml Sent: Tuesday, October 18, 2011 3:56 PM To: Alexia Donahue -Wold; Angie Conn; Bill Akers; Bill Hohlt; Brooke M. Gajownik; Chris Ellison; Dan Davenport; Daren Mindham; Dave Huffman; David Littlejohn; David E. Lucas; Doland Wise; Duane Whiting; Gary Duncan; Gary McNamee; Greg R. Hoyes; Gregory Iiko; Jason Kirkman; Jason T. LeMaster; Jim Blanchard; Joanie Clark; John Duffy; John Thomas; Mark Westermeier; Nick Redden; Ron Farrand; Ryan Hartman; Shirely Hunter; Steven Krebs; Terry Krueskamp; Tim Green; Troy Yackle Subject: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road 1 Conn, Angelina V From: Don Highlander [don @connectingspaces com] Sent: Wednesday, November 23, 2011 9:16 AM To: Ellison, Christopher M Cc: Conn, Angelina V Subject: RE St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road Capt. Ellison, As we discussed at the TAC meeting we will schedule a meeting with you to determine the appropriate fire protection plan. As you indicated, this does not need to be done before the BZA meeting and could be scheduled after the meeting. Have a great Thanksgiving. Don Highlander ConnectingSpaces L« 888 511 -0147 V 440 897 -4332 C From: Ellison, Christopher M mailto:CEllisonCtcarmel.in.gov] Sent: Tuesday, October 18, 2011 4:09 PM To: Don Highlander Subject: RE: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road All projects to he reviewed by the Carmel Fire Dept. must have hard copy too scale plans submitted to us. Respectfully, Capt Chris Ellison Deputy Fire Marshal Carmel Fire Dept. 317- 571 -2621 Original Message From: Don Highlander [mailto :don @connectingspaces.com] Sent: Tue 10/18/2011 2:56 PM To: Donahue -Wold, Alexia K; Conn, Angelina V; Akers, William P; Hohlt, William G; Brooke Gajownik; Ellison. Christopher M; Dan Davenport, Mindham, Daren, Huffman, David; Littlejohn, David W. David Lucas, Doland Wise; Duane Whiting; Duncan, Gary R, Gary McNamee; Greg Hoyes; Gregory Ilko, Jason Kirkman; Jason Lemaster; Blanchard, Jim E; Joanie Clark; Duffy, John M, Thomas, John G, Forward for Westermeier, Mark: Redden, Nick: Ron Farrand; Ryan Hartman, Shirely Hunter: Steven Krebs; Krueskamp, Theresa A; Green, Timothy J; Troy Yackle Subject St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road Carmel Technical Advisory Committee, We have attached the application and preliminary plans in PDF format for a Special Use permit requestfor St.. Mary and St. Mark Coptic Orthodox Church. 1 Conn, Angelina V From: Sent: To: Cc: Subject: Attachments: Ryan, Don Highlander [don@ connectingspaces.com] Wednesday, November 23, 2011 9.11 AM 'Ryan Hartman' Conn, Angelina V RE St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road IndianapolisStMary111118.pdf Thank you for your comments and supporting drawings. As you know we are in the primary design stage and the information that the sewer main is with 25' or so of our property is helpful. As we go into the construction document stage we are aware that we will need to have the sewer main extended across the frontage of the church's property. We have attached the latest drawings with the sewer line extension shown on C103. Thanks for your help. Have a great Thanksgiving. Don Highlander ConnectingSpaces 888- 511 -0147 V 440 897 -4332 C From: Ryan Hartman mailto:Rvan.HartmanOCTRWD.ORG1 Sent: Tuesday, October 18, 2011 5:08 PM To: Don Highlander Subject: RE: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road Don, Once you get to that point we will require plans that show plan and profile view of the sanitary sewer being installed. Sewer lateral location, sanitary sewer application, IDEM Permit, 25' SSE easement and dedication of sewer will also be required. Is the building going to be demolished before you get a sanitary sewer permit? Is there any kitchen facility going to be installed? Asbuilt ACAD and .pdf file of the sanitary sewer is attached for your use. Please let me know if you have any questions or go to our web site at www.ctrwd.orq for more information. Thank you. Ryan Hartman, District Engineer Clay Township Regional Waste District 10701 N. College Avenue, Suite A Indianapolis, Indiana 46280 Phone 317 844 -9200 Fax 317 -844 -9203 Website www.ctrwd.orq Email ryan.hartman(actrwd.orq From: Don Highlander j mailto :don@connectingspaces.com] Sent: Tuesday, October 18, 2011 3:56 PM To: Alexia Donahue -Wold; Angie Conn; Bill Akers; Bill Hohlt; Brooke Gajownik; Chris Ellison; Dan Davenport; Daren Mindham; Dave Huffman; David Littlejohn; David Lucas; Doland Wise; Duane Whiting; Gary Duncan; Gary McNamee; Greg Hoyes; Gregory Ilko; Jason Kirkman; Jason Lemaster; Jim Blanchard; Joanie Clark; John Duffy; John Thomas; Mark Westermeier; Nick Redden; Ron Farrand; Ryan Hartman; Shirely Hunter; Steven Krebs; Terry Krueskamp; Tim Green; Troy Yackle Subject: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road Carmel Technical Advisory Committee, 1 Conn, Angelina V From: Donald Highlander [donhighlander @gmail.com] Sent: Wednesday, November 23, 2011 8:50 AM To: Mindham, Daren Cc: Conn, Angelina V Subject: RE: Docket No Assignment: (V,SU) St. Mary St. Mark Coptic Orthodox Church 11100013 -15) Attachments: IndianapolisStMary111118 pdf Mr. Mindham, Thank you for the comments on the landscaping plan. We are still in the preliminary design stage, but we have added the standard planting details to our plans (please see sheet L101 attached) and added a planting schedule. In the next stage we will get an inventory of the existing trees so that we can properly add the additional buffering. We have indicated some landscaped beds close to the building that we will also more fully identify in the next stage as well. Thank you for your help. Have a great Thanksgiving. Don Highlander ConnectingSpaces 888 511 -0147 V 440 897 -4332 C From: Mindham, Daren [mailto:dmindham @carmel.in.gov] Sent: Monday, October 24, 2011 3:20 PM To: don @connectingspaces.com; mrizkall @iupui.edu Subject: FW: Docket No. Assignment: (V,SU) St. Mary St. Mark Coptic Orthodox Church #11100013 -15) Don, The following email represents comments for this project specifically addressing the area of urban forestry. I have reviewed the drawing and offer the following comments: URBAN FORESTRY REVIEW COMMENTS 1 1) Please show the attached Carmel planting details on the plan to ensure proper planting. 2) Existing trees may count toward the linear feet of bufferyard plantings required, however, tree preservation details will need to be shown and implemented. 3) I have attached our recommended tree list along with a sample plant schedule for use on this plan. Hopefully, my notes will make it a little easier. I read the note at the bottom of page L101. It seems that landscaping is on the radar and planned to be addressed later. I will have more in -depth comments then. Thanks. Conn, Angelina V From: Sent: To: Cc: Subject: Attachments: Ms. Boone, Thank you for the comments about the sign. Per your recommendation we increased the size of the lettering for the sign which is shown on sheet C101 of the attached PDFs. Have a great Thanksgiving. Don Highlander ConnectingSpaces c 888 511 -0147 V 440 897 -4332 C Don Highlander [don @connectingspaces.com] Wednesday, November 23, 2011 8 AM Boone, Rachel M. Conn, Angelina V RE. St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road IndianapolisStMary111118 pdf From: Conn, Angelina V jmailto:Aconn@carmel.in.govl Sent: Thursday, October 20, 2011 9:33 AM To: Don Highlander Subject: FW: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road Hi Don here is a review comment about the proposed signage, from our Sign Permits Officer, Rachel Boone. Thanks, -Angie Conn, Planning Administrator From: Boone, Rachel M. Sent: Wednesday, October 19, 2011 2:06 PM To: Conn, Angelina V Subject: RE: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road Hi Angie, The signage looks good. The only thing I'd change is the address number height. I believe the minimum size the Fire Department likes to see is 4 inches. 45 sq. ft. is allowed overall and 43.33 is proposed. The height at 5'6" is ok because it is less than 6' tall. !think the building design is very cool! I'm excited for this church to go through. Rachel Rachel Bo Sign Permit Specialist City of Carmel Department of Community Services 317 571 -2417 1 Conn, Angelina V From: Sent: To: Subject: Attachments: Ms. Conn, Don Highlander [don@ connectingspaces comj Tuesday, November 22, 2011 8 PM Conn, Angelina V St. Mary and St. Mark Coptic Orthodox Church Revision 1 IndianapolisStMary111118 pdf; CityComments- AngieConn pdf We have addressed the P/Z comments and other TAC member comments in the attached PDF. I am sending hardcopy that you should receive on Wednesday. We just got some comments from Gary Duncan Monday evening and we will have those addressed on Wednesday. Let me know if you have any questions. Thank you. Don Highlander ConnectingSpaces LLC 888 511 -0147 V 440 897 -4332 C 1 Conn, Angelina V From: Don Highlander [don @connectingspaces.com] Sent: Friday, November 18, 2011 9 44 AM To: Conn, Angelina V Subject: St. Mary and St. Mark Coptic Orthodox Church Angie, We have completed all of the public notices and sent BZA Information Packets that has arrived this morning via FedEx to Connie Tingley. We are addressing the comments of the TAC members and will be sending out revised drawings and written responses Monday via e -mail and follow that up with hardcopy (to arrive Tuesday) for those that have asked for it before. Thank you for your help! Don Highlander ConnectingSpaces LIG 888 511 -0147 V 440 897 -4332 C 1 Connie Tingley City of Carmel Department of Community Services One Civic Square, 3rd Flr. Carmel, IN 46032 Re: St. Mary and St. Mark Coptic Orthodox Church Docket No. 11100013 SU Docket No. 11100014 V Ms. Tingley, Please find enclosed nine information packets for the upcoming BZA meeting. We have also enclosed the filing fee. Let me know if you need anything else. Thank you for your help. kgag November 17, 2011 ConnectingSpaces LLC; 641(4 Donald A. Highlander, AIA President ConnectingSpaces LLC 56 Milford Drive, Suite 2 Hudson, Ohio 44236 (888) 511 -0147 V (330) 653 -3520 F www.connectingspaces.com November 15, 2011 Mr Donald A. Highlander Connecting Spaces, LLC 56 Milford Drive, Suite 2 Hudson, Ohio 44236 nas er it kmu'ib]"e� iH3nF EL JAMES BRAINARD, MAYOR RE: St. Mary and St. Mark Coptic Orthodox Church Project Review #1 Dear Mr Highlander: The City received your site plan on October 21, 2011. We offer the following comments: GENERAL INFORMATION 1. These comments represent the Department of Engineering's first review of the preliminary development plans for this project. 2. We request that all responses to our comments be provided in writing and be accompanied by a drawing reflecting the requested revisions. Failure to provide written responses may result in the delay of the review process. 3. It is critical that this office be made aware of all modifications made on the plans being re- submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans including all revisions. PIease notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, BZA or other committee meetings. 4. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations submitted to this office for review. If you have not already done so, please provide a set of drainage plans and calculations to their office for review We will share Crossroad's comments as they are received. 5. Final drawings will not be approved for construction until: a. All Engineering Department and Utility Department and Hamilton County Surveyor issues have been resolved. b. All bonds and performance guarantees are posted. c. All Board of Public Works and Safety approvals and any other governing agency approvals (if required) are obtained. d. All off-site easements necessary to install utilities to serve the development are secured. e. SWPPP is approved. f. All fees are paid. 6 The Department reserves the right to provide additional comments based upon subsequent reviews. 7. An approved Storm Water Management Permit is required prior to commencing any earth disturbing activity. Please contact Mr. John Thomas regarding storm water quality requirements. 8. An approved right -of -way permit is required prior to commencing any work in the public right -of -way. 9. If it will be necessary to relocate existing utilities, the costs for such relocation shall be borne solely by the developer. Any utility poles requiring relocation shall be relocated to within one -foot of the outside edge of the proposed right -of -way. 10. The Department requires that the construction drawings be developed in accordance with the City of Cannel digital submission standards and that all required submittals for primary plat, secondary plat, and construction drawings be made. The digital files must be submitted to I)1:PAlcINIE:Vr r>E EMLINEERIM, ONE CIVIC Scn•Aftn. IN 46032 Orrin 317.571 2441 FA\ 317 571 2439 E\lAlf. cn4incriing?carmcl ❑irox Mr Donald A. Highlander November 15, 2011 RE• St. Mary and St. Mark Coptic Orthodox Church- Project Review #1 Page 2 of 4 the Department of Engineering prior to the approval of the construction plans. Please contact the City GIS Department for the requirements. 1I Jurisdictions: a. The project site is located within current City of Carmel Corporate Limits. b. Perimeter Street and Right -of -Way City of Carmel (Old Meridian Street, Grand Boulevard) c. Water City of Carmel Utilities d. Sanitary Sewers City of Cannel Utilities e. Storm Sewers /Drainage City of Carmel. f. Legal Drains Hamilton County Surveyor's Office. 12. Drawings submitted for approval: a. The design engineer must certify all drawings submitted for final approval, b This office will require 9 sets of drawings for approval after all issues have been resolved. The drawings will be stamped as approved and signed by the City Engineer and by Cannel Utilities. The Owner will receive 3 sets, one of which must be maintained on the construction site at all times. If this project is subject to review and approval by the Hamilton County Surveyor's Office, a total of 11 sets will be required for final approval 13 Carmel Utilities will provide separate reviews of this project for water issues. Please assure that copies of all drawings are sent to: Paul Pace Paul Arnone Carmel Utilities Distribution Carmel Utilities Collection 3450 West 131 Street 901 North Range Line Road Westfield, IN 46074 Carmel, IN 46032 14. Carmel Utilities subscribes to "Holey Moley" who should be contacted directly for all water main locations. 15 The following items will be sent electronically upon request regarding this correspondence and project: a. Project Approval Checklist b. Performance /Maintenance Guarantees c. Utility Jurisdictions /Right of Way Pennits d. Availability' (acreage) Fees BOARD OF PUBLIC WORKS AND SAFETY 16. A schedule for Board of Public Works and Safety meeting dates and agenda deadlines will be sent electronically for your use upon request. Please use the Engineering Department deadlines for submissions to the Board. 17. Any submission to the Board requires prior approval by the Carmel Clay Plan Commission and /or the Board of Zoning Appeals (if applicable) and completion of review by the Technical Advisory Committee. All written requests to be placed on the Board's agenda must include the appropriate Docket Number and the date (or dates) of approval by the Plan Commission and /or the Board of Zoning Appeals (if applicable) 18. Water Availability and Sanitary Sewer approval from the Board will be required. This is an EDU approval based upon the proposed use of the site. Reference Items #33 to #35 below for additional details /explanations. Please note that Kan entryway or other irrigation system is planned for this development, additional Water Availability Approval from the Board will be required and additional Water Connection Fees will be assessed based upon the size and usage of the system as determined by the Director of Carmel Utilities. 19. Commercial Curb Cut Approval. Please provide 8 x 11 exhibits with the request for approval. Provide all pertinent information including lane widths, overall width, radii, lane markings, location of opposing drives or streets, relationship to the location of previous curb cut, etc. Mr. Donald A. Highlander November 15, 2011 RE: St. Mary and St. Mark Coptic Orthodox Church Project Review #1 Page 3 of 4 20 Temporary Construction Entrance Approval. it appears the planned construction entrance is located at the site of a permanent curb cut planned on Grand Boulevard. Therefore, a separate approval from the Board will not be required. 21. The installation of any permanent. privately owned and/or maintained improvement (signs, decorative street signs, walls, streetlights, etc within dedicated right of way or dedicated easements requires the execution of a Consent to Encroach Agreement between the Owner and the City of Carmel. Such agreements are executed by the Board of Public Works and Safety. The City Engineer may approve irrigation system agreements. 22. Secondary Plat approval if applicable. All performance guarantees must be posted prior to submission of secondary plats for Board of Public Works and Safety approval. 23. Dedication of right -of -way if not platted. This is based upon the City of Carmel 20 -Year Thoroughfare Plan requirements. Dedication documents are available upon request. Please be advised that all Right -of -Way Dedications must be accompanied by a Sales Disclosure Agreement completed by the owner for the property being dedicated to the City The dedication document cannot be recorded without a completed Sales Disclosure. The form is available upon request. 24. Any open pavement cuts of either Old Meridian Street or Grand Boulevard, other than those required for the curb and median cuts, will require Board approval. BONDING REQUIREMENTS 25. Please contact Mr. Dave Barnes to review perfonnance guarantee requirements. Please contact Mr. John Duffy to review water and sanitary sewer bonding requirements. 26. The amount of the Perfonnance Guarantee is based upon a certified Engineer's Estimate for 100% of the cost of labor and materials to construct the individual improvements, to be provided by the design engineer. Please provide detailed Engineer's Estimates for each improvement including quantities, unit costs, pipe sizes, and materials, etc 27. Upon completion and release of individual Perfonnance Guarantees, a three -year Maintenance Guarantee will be required (see Street Sign comments above) The Maintenance Guarantee amount is based upon 15% of the Performance amount for Streets and Curbs and 10% of the Performance amount for all other improvements. 28 Perfonnance Guarantees may be Perfonnance or Subdivision Bonds or Irrevocable Letters of Credit. 29. Please reference the available enclosures for more detailed explanation of our procedures. RIGHT OF WAY PERMIT AND BONDING 30 Any work in the dedicated right -of -way will require an approved Right -of -Way Permit and a License Permit Bond. 31 The bond amount is determined by our Right -of -Way Manager. However, if the work is included in the scope of work of a required and posted Perfonnance Guarantee, the Performance Guarantee may be used to satisfy the bond requirements of the Right of-Way Permit. 32. Please contact our Right -of -Way Manager, Fred Glaser, to arrange right -of -way permitting and bonding. AVAILABILITY AND CONNECTION FEES 33. We defer to Cannel Utilities regarding this issue. 34. if an entryway or overall site irrigation system is planned for this development, additional Water Connection Fees will be assessed based upon the size and usage of the system and upon the recommendations of the Director of Carmel Utilities. 35 These fees are required to be paid prior to final approval of construction plans by Engineering and prior to issuance of building permits by Building Codes Services. Please confirm these fees and calculations with Carmel Utilities. Mr. Donald A. Highlander November 15, 2011 RE. St. Mary and St. Mark Coptic Orthodox Church- Project Review #1 Page 4 of 4 CONSTRUCTION DRAWING REVIEW COMMENTS 36. General Comments a. This project is subject to the City's Storm Water Management and Storm Water Quality Ordinances. b Please add the following note to the drawings: "IF IT WILL BE NECESSARY TO RELOCATE EXISTING UTILITIES, THE EXPENSE OF SUCH RELOCATION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. ALL UTILITY POLES SHALL BE LOCATED WITHIN ONE FOOT OF THE PROPOSED RIGHT -OF- WAY." 37. Please add note stating "NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT" to construction set. 38. All swales on site must have sub- surface pipe installed. Pipe to conform to requirements of Stortn Water Technical Standards Manual and shall be double wall, H1 -Q pipe. 39 Please omit Sheet L101, Landscape Plan, Sheet A201, Elevations; and Sheet A202, Elevations from construction sets to be submitted for review by this department. The Department of Engineering does not have approval authority over landscape plans or architectural plans. If you have questions, please contact the at 571 -2441. Sincerely, Nicholas J Redden, P.E. Plan Review Coordinator Department of Engineering cc Angelina Conn, Department of Community Services John Duffy, Carmel Utilities Paul Pace, Carmel Utilities Paul Arnone, Carmel Utilities Greg Noyes, Hamilton County Surveyor's Office Greg Ilko, Crossroad Engineers, PC issvrapps \user data \z: \shared \DH IL L \PROJ RE V 11 \ST.MAR YAN DST. MARKCOPTICORTHODOXCHURCHREV# 1 Date: Wednesday, November 16, 2011 Place: Dept. of Community Services Conference Room, 3' Floor, Cannel City Hall. Time: 9:00 a.m. Note: The Department of Public Utilities of the City of Indianapolis d /bia Citizens Water (CW has reviewed the below listed TAC agenda topics. CW's response for each topic is stated in the Bold Blue Text below each topic description. 9:00 a.m. St. Mary St. Mark Coptic Orthodox Church. The applicant seeks the following special use development standards variance approvals: Docket No. 11100013 SU ZO Ch. 5.02: Special Uses, religious use. Docket No. 11100014 V ZO Ch. 5.04.01: Max. building height exceeds 35 -ft. The site is located at 12174 Shelborne Rd. It is zoned S-1/Residence. Filed by Don Highlander of Connecting Spaces, LLC. C T CW has no objection to the above described request. This site is not served by CW. he site is within the Carmel Utilities Service Territory, currently serving this vicinity. 9:10 a.m. Carey Addition, Lot 3 Starting Line Preschool. The applicant seeks the following special use approval: Docket No. 11100019 SU ZO Ch. 8.02: Special Uses, preschool. The site is located at 110 3` Ave NE. It is zoned R -2 /Residence and lies with the Old Town Overlay Character Subarea. Filed by Diane Atkins. CW has no objection to the above described request. This site is not served by CW. The site is within the Carmel Utilities Service Territory, currently serving this vicinity. 9:20 a.m. Tabled indefinitely: Merchants' Square, Enterprise Rent -A -Car (former Hardee's site). The applicant seeks the following use variance approval for an auto leasing business: Docket No. 11100006 UV ZO Ch. 19.01: Permitted Uses. The site is located at 2350 E. 116 St. It is zoned B -8 /Business. Filed by Jeff Gowdy of Enterprise. CW has no objection to the above described request. This site is not served by CW. The site is within the Carmel Utilities Service Territory, currently serving this vicinity. 9 :30 a.m. Docket No. 11100022 DP /ADLS: Gramercy PUD (Mohawk Hills Redevelopment) The applicant seeks site plan and design approval for a multifamily apartments infill and rehabilitation project on 116.4 acres. The site is Located at approximately 751 E. 126 Street, at the southwest corner of 126 St. and Keystone Pkwy. The site is zoned PUD/Planned Unit Development. Filed by Matthew Griffin of Buckingham Companies: CW has no objection to the above described request. This site is not served by CW. The site is within the Carmel Utilities Service Territory, currently serving this vicinity. CARMEL TECHNICAL ADVISORY COMMITTEE MEETING AGENDA File: T'AC201 I 1116.doc Page 1 of 1 WWW.CARMELIN.GOV ONE CIVIC SQ CARMEL. IN 46032 (317) X71 -.,417 Conn, Angelina V From: Sent: To: Cc: Subject: Attachments: Don, I have not received any plans for this project as it relates to Landscaping. Please review my comments below and submit a plan noting the landscaping requirements. See you at the TAC meeting. Daren Mindham Urban Forester City of Carmel Department of Community Services One Civic Square Carmel, Indiana 46032 Office 317 571 -2283 From: Mindham, Daren Sent: Monday, October 24, 2011 3:20 PM To: 'don @connectingspaces.com'; 'mrizkall @iupui.edu' Subject: FW: Docket No. Assignment: (V,SU) St. Mary St. Mark Coptic Orthodox Church #11100013 -15) Don, Mindham, Daren Tuesday, November 15, 2011 9 09 AM 'don @connectingspaces.com'; 'mrizkall @iupui.edu' Conn, Angelina V RE Docket No Assignment: (V,SU) St. Mary St. Mark Coptic Orthodox Church 11100013 -15) Treedetail Carmel pdf; Shrubdetail- Carmel pdf; Evergreendetail- Carmel.pdf; Recommended Tree List.pdf; Tree Preservation Detail pdf; TREE AND SHRUB SCHEDULE sample.docx The following email represents comments for this project specifically addressing the area of urban forestry. I have reviewed the drawing and offer the following comments: URBAN FORESTRY REVIEW COMMENTS 1) Please show the attached Carmel planting details on the plan to ensure proper planting. 2) Existing trees may count toward the linear feet of bufferyard plantings required, however, tree preservation details will need to be shown and implemented. 3) I have attached our recommended tree list along with a sample plant schedule for use on this plan. Hopefully, my notes will make it a little easier. I read the note at the bottom of page L101. It seems that landscaping is on the radar and planned to be addressed later. I will have more in -depth comments then. Thanks. Please illustrate how these comments will be addressed by letter or revised plan. If you have any questions, feel free to contact me. Thanks. 1 November 14, 2011 Xenton C. `Ward, Cr 7v1 Surveyor of J- familton County 'Phone (317) 7764495 'Fax (317) 776 -9625 ConnectingSpaces, LLC ATTN: Donald Highlander 56 Milford Drive, Suite 2 Hudson, OH. 44236 VIA E -MAIL: don(&,,connectingspaces.com Suite 'SS One .Hamilton County Square Noblesville, Indiana 46060 -2230 Re: St. Mary and St. Mark Coptic Orthodox Church Dear Mr. Highlander We have reviewed the concept plans submitted to the Hamilton County Surveyor's Office on October 21, 2011, for this project and have the following comments: 1. The proposed project falls in the incorporated area and MS4 jurisdiction of the City of Carmel. 2. The proposed project DOES NOT fall in a Carmel Wellhead Protection Zone. 3. The project falls in the Long Branch Regulated Drain Watershed. 4. The allowable release rates for the Long Branch Regulated Drain are 0 1 cfs per acres for the 1 to 10 year 24 hour storm event and 0.24 cfs per acre for the 11 to 100 year 24 hour storm event. 5. The Hamilton County Surveyor's Office has no objections to the Special Use Variance. 6. The current submittal has insufficient information provided to complete a site review for drainage, so no drainage approval is being granted at this time. Please submit complete construction plans and drainage calculations to this office when they become available. 7. Please note that further continents may be necessary at a later date. Should you have any questions, I can be reached at 317- 776 -8495. Sincerely, Giov Greg Hoyes, AC, CFM, CPESC Plan Reviewer CC Angie Conn Carmel DOCS John Thomas Carmel Engineering Dave Barnes Cannel Engineering Greg Ilko Crossroad Engineers Sincerely, November 10, 2011 Mr Don Highlander Connecting Spaces v\/\CIAr RE: Comer etbis Dear Mr Highlander: The following letter represents comments for this project specifically addressing the area of alternative transportation. I have reviewed the drawings submitted for the November 16, 2011 Technical Advisory Committee and offer the following comments: ALTERNATIVE TRANSPORTATION REVIEW COMMENTS 1) The City of Carmel Parking Ordinance requires developments to include bicycle parking. Bicycle parking spaces are required at a rate of five (5) bicycle parking spaces per one hundred (100) parking spaces. Please see the City of Carmel's Parking Ordinance in order to determine the appropriate locations and construction details for the above. 2) Please connect all internal sidewalks to the multi -use path along Shelborne Rd and provide a direct connection to the required bicycle parking. 3) Please indicate ADA compliancy at all ramp and crossings locations We request that all responses to our comments be provided in writing. Failure to provide written responses may result in delay of the review process. It is critical that this office be made aware of all modification made on the plans being re- submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans indicating all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, Special Studies or other committee meetings. The Department of Community Services reserves the right to provide additional comments based on subsequent reviews. If you have questions, please contact me at 571 -2417. David Littlejohn ONE CIVIC SQUARE City of Carmel Sk Page 1 CARMEL, INDL\NA 46032 317/571 -2417 Alternative Transportation Coordinator Department of Community Services cc: Angie Conn, Department of Community Services Engineering Department Review Project File ONE CIVIC SQUARE Page 2 CARMEL, INDIANA 46032 317/571 -2417 October 27, 2011 Don Highlander Connecting Spaces LLc Tim c fiy J. Green Chief of Police TJG:vb cc: Dept. of Community Services 4317) (71- 25(➢() CA1113 CarrneJ1 0 ice eparimen ,3av: r Carmel, 4, b:ia 4 6O 2 RE: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road Dear Mr. Highlander The above mentioned project has been received and reviewed At the present time, I see nothing in the plans that would hamper law enforcement efforts If we can be of any further assistance to you, please contact us. Respectfully_, A Nationally AccreditedLaw Eriforcement Agency Fax (317) 571 -2512 Angelina Conn City of Carmel Department of Community Services One Civic Square, 3` Flr. Carmel, IN 46032 Re: St. Mary and St. Mark Coptic Orthodox Church Docket No. 11100013 SU Docket No. 11100014 V Docket No. 11100015 V Ms. Conn, Thank you for your help. Q October 19, 2011 Please find enclosed two sets of drawings and the original and a copy of the application for the Special Use permit request for St. Mary and St. Mark Coptic Orthodox Church for Docket No. 11100013 SU. We have also included the Variance application for Docket No. 11100014V. We have not included an application for Docket No. 11100015V because we do not think we exceed the 35% lot coverage and will wait for your ruling. ConnectingSpaces LLC; Yilakx4/ Donald A. Highlander, AIA President ConnectingSpaces LLC 56 Milford Drive, Suite 2 Hudson, Ohio 44236 (888) 511 -0147 V (330) 653 -3520 F www.connectingspaces.com Conn, An elina V From: Sent: To: Subject: Hi Angie, The signage looks good. The only thing I'd change is the address number height. I believe the minimum size the Fire Department likes to see is 4 inches. 45 sq. ft. is allowed overall and 43.33 is proposed. The height at 5'6" is ok because it is less than 6' tall. I think the building design is very cool! I'm excited for this church to go through. O Rachel 2 achel/ 3oone, Sign Permit Specialist City of Carmel Department of Community Services 317 571 -2417 From: Conn, Angelina V Sent: Wednesday, October 19, 2011 12:07 PM To: Boone, Rachel M. Subject: FW: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road New BZA petition. Signage looks ok, right? -Angie Conn, Planning Administrator From: Don Highlander C mailto :donconnectincispaces.coml Sent: Tuesday, October 18, 2011 3:56 PM To: Donahue -Wold, Alexia K; Conn, Angelina V; Akers, William P; Hohlt, William G; Brooke Gajownik; Ellison, Christopher M; Dan Davenport; Mindham, Daren; Huffman, David; Littlejohn, David W; David Lucas; Doland Wise; Duane Whiting; Duncan, Gary R; Gary McNamee; Greg Noyes; Gregory Ilko; Jason Kirkman; Jason Lemaster; Blanchard, Jim E; Joanie Clark; Duffy, John M; Thomas, John G; Forward for Westermeier, Mark; Redden, Nick; Ron Farrand; Ryan Hartman; Shirely Hunter; Steven Krebs; Krueskamp, Theresa A; Green, Timothy J; Troy Yackle Subject: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road Carmel Technical Advisory Committee, Boone, Rachel M. Wednesday, October 19, 2011 2:06 PM Conn, Angelina V RE: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road We have attached the application and preliminary plans in PDF format for a Special Use permit request for St. Mary and St. Mark Coptic Orthodox Church. If you desire a hardcopy of this submittal, simply reply to this e -mail and we will send prints to you. Thanks you for your help in this matter. Don Highlander Con nectingSpaces 888 511 -0147 V 440 897 -4332 C 1 Conn, Angelina V From: Conn, Angelina V Sent: Wednesday, October 19, 2011 11 AM To: 'Don Highlander' Subject: RE. St. Mary's Coptic Orthodox Church Hi, Don Yes, these plans are enough to get started, but you will definitely need to provide more detailed plans to the TAC members. The landscape plan will need actual planting details and planting legend, there needs to be a swppp plan, utility plan showing the utility lines, a lighting /photometric plan with foot candle measurements, etc. Our office also needs paper copies of the application and paper copies of to -scale plans 24 x 36 or similar size. Please drop those off ASAP. The next step is for you to get the adjoiner list from the auditor's office. And, in the meantime, my dept. will issue a docket no. and review comments very soon. We will also let you know the various meeting dates and filing deadlines in that email. Stay tuned. Angie Conn, Planning Administrator City of Carmel Planning Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr. Carmel, IN 46032 0: 317-571-2417 1 F: 317 571 -2426 W: www.carmeldocs.com Please consider the environment before printing this e-mail From: Don Highlander [mailto :don @connectingspaces.com] Sent: Wednesday, October 19, 2011 10:37 AM To: Conn, Angelina V Subject: RE: St. Mary's Coptic Orthodox Church Ms. Conn, Some questions: 1. The drawings we submitted are preliminary. Do you think we have provided enough information to continue? 2. The owner would like to continue, if possible, so what do we need to do next? Thanks, Don Highlander ConnectingSpaces «C 888 511 -0147 V 440 897 -4332 C I E: aconn @carmel.in.gov From: Conn, Angelina V [mailto:Aconn @carmel.in.gov] Sent: Friday, October 14, 2011 9:08 AM 1 Conn, Angelina V From: Greg Ilko [gilko @crossroadengineers.com] Sent: Tuesday, October 18, 2011 4.03 PM To: 'Don Highlander' Cc: Conn, Angelina V, Duncan, Gary R; Greg Hoyes Subject: RE St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road I have no comment with regards to the application for the Special Use permit request. However, at such time as it is desired to move forward with final construction plans and drainage calculations, I will require one set of each, full size, mailed to my attention for review. Thanks, Gregory J. Ilko, P.E. CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 Office: 317 780 -1555 ext. 112 Mobile: 317 408 -3609 Fax: 317 780 -6525 From: Don Highlander f mailto :don(aconnectingspaces.coml Sent: Tuesday, October 18, 2011 3:56 PM To: Alexia Donahue -Wold; Angie Conn; Bill Akers; Bill Hohlt; Brooke Gajownik; Chris Ellison; Dan Davenport; Daren Mindham; Dave Huffman; David Littlejohn; David Lucas; Doland Wise; Duane Whiting; Gary Duncan; Gary McNamee; Greg Hoyes; Gregory Ilko; Jason Kirkman; Jason Lemaster; Jim Blanchard; Joanie Clark; John Duffy; John Thomas; Mark Westermeier; Nick Redden; Ron Farrand; Ryan Hartman; Shirely Hunter; Steven Krebs; Terry Krueskamp; Tim Green; Troy Yackle Subject: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road Carmel Technical Advisory Committee, We have attached the application and preliminary plans in PDF format for a Special Use permit request for St. Mary and St. Mark Coptic Orthodox Church. If you desire a hardcopy of this submittal, simply reply to this e-mail and we will send prints to you. Thanks you for your help in this matter. Don Highlander ConnectingSpaces 888 511 -0147 V 440 897 -4332 C 1 Conn, An elina V Don Highlander [don @connectingspaces.com] Tuesday, October 18, 2011 3 56 PM Donahue -Wold, Alexia K, Conn, Angelina V; Akers, William P; Hohlt, William G, Brooke Gajownik; Ellison, Christopher M; Dan Davenport; Mindham, Daren, Huffman, David, Littlejohn, David W; David Lucas; Doland Wise, Duane Whiting, Duncan, Gary R; Gary McNamee, Greg Noyes, Gregory Ilko, Jason Kirkman, Jason Lemaster; Blanchard, Jim E; Joanie Clark, Duffy, John M, Thomas, John G, Forward for Westermeier, Mark; Redden, Nick; Ron Farrand, Ryan Hartman, Shirely Hunter; Steven Krebs; Krueskamp, Theresa A, Green, Timothy J, Troy Yackle Subject: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road Attachments: Application.pdf, StMaryStMark111018 pdf From: Sent: To: Carmel Technical Advisory Committee, We have attached the application and preliminary plans in PDF format for a Special Use permit request for St. Mary and St. Mark Coptic Orthodox Church. If you desire a hardcopy of this submittal, simply reply to this e -mail and we will send prints to you. Thanks you for your help in this matter. Don Highlander ConnectingSpaces 888 511 -0147 V 440 897 -4332 C 1 Donald Highlander From: Conn, Angelina V <Aconn @carmei.in.gov> Sent: Thursday, October 13, 2011 3:23 PM To: Don Highlander Subject: RE: St. Mary's Coptic Orthodox Church Attachments: BZA Calendar 2011.pdf; Special Use Application 2011.docx; Special Use Application Instructions 2011.pdf; BZA Flowchart2011.pdf Well, Don.... Do you have anything prepared to submit to us? You would need to get us a filled out special use application and some preliminary plans (site plans, drainage plans, parking plans, landscaping plans, architectural building elevations) by Tuesday the 18th, at the latest. This would include you sending plans to all the TAC members; their contact info is online at: htto: /www.carmel.in.gov/ Modules /ShowDocument.aspx ?documentlD =708 The special use application (with instructions checklist), BZA process flowchart, and BZA calendar are attached. 34 56 This should be enough to get you started. Good Luck! t Angie Conn, Planning Administrator EC Fr City of Carmel Planning Zoning Division a ;N Dept. of Community Services KAl et-1 1 Civic Square, 3rd Flr. Carmel, IN 46032 ®l 4 0: 317-571-2417 1 F: 317 571 -2426 W: www.carmeldocs.com Please consider the environment before printing this e-mail E: aconnOcarmel.in.gov From: Don Highlander f mailto :donLTconnectingspaces.coml Sent: Thursday, October 13, 2011 3:07 PM To: Conn, Angelina V Subject: St. Mary's Coptic Orthodox Church Ms. Conn, Please give me a call at 440- 897 -4332. Thanks, Don Highlander Connecting5paces LL� 888 511 -0147 V 440 897 -4332 C 1 We would like to see if we can still file an application for the November meeting for a Special Use Permit for St. Mary and St. Mark Coptic Orthodox on 12174 Shelborne Road. Donald Highlander From: Conn, Angelina V <Aconn @carmel.in.gov> Sent: Friday, October 14, 2011 9:08 AM To: Don Highlander Subject: RE: St. Mary's Coptic Orthodox Church Hi, Don my responses are below: 1. The architect can sign it as the owner's agent, if you also include an email or letter from the property owner saying that it is okay for you to act on their behalf. 2. We typically need the application by 5pm today, but in my prior email I think I said that we can take it on Oct. 18, at the latest. 3. Yes, we can meet on Monday or Tuesday, or you can just email me your preliminary plans for the site with a short memo about what you plan to do. 4. The TAC members list I sent you shows if they prefer getting plans digitally, via paper, or both. At the very least you should sent out a mass email to all TAC members with the plans attached (as .pdf's or jpg's), and also ask if anyone needs paper copies as well. Yes, make sure the TAC members get paper copies of the plans ASAP. -Angie Conn, Planning Administrator From: Don Highlander jmailto :don@connectinaspaces.coml Sent: Thursday, October 13, 2011 4:12 PM To: Conn, Angelina V Subject: RE: St. Mary's Coptic Orthodox Church Angie, We are still working on the preliminary plans and can have a submittal by Tuesday the 18 1. The application is almost complete. Can I (the architect) sign it as owner's agent or do I need to have someone authorized from the church sign it? 2. When do you need the application? 3. The Flowchart starts with a "Pre- Filing Meeting Do we need that, if so, I could meet Monday or Tuesday. 4. What is involved in sending TAC members the drawings. Can we send electronic (PDFs)? If hardcopy, do we need to send it overnight Monday so everyone has it on Tuesday? If we meet Monday afternoon could I bring prints then? Thanks, Don Highlander ConnectingSpaces LLC 888 511 -0147 V 440- 897 -4332 C From: Conn, Angelina V jmailto:Aconn carmel.in.aovl Sent: Thursday, October 13, 2011 3:23 PM To: Don Highlander Subject: RE: St. Mary's Coptic Orthodox Church Well, Don.... Do you have anything prepared to submit to us? You would need to get us a filled out special use application and some preliminary plans (site plans, drainage plans, parking plans, landscaping plans, architectural building elevations) by Tuesday the 18th, at the latest. This would include you sending plans to all the TAC members; their contact info is online at: http: /www.carmel.in.gov/ Modules /ShowDocument.aspx ?documentl 708 1 1 The special use application (with instructions checklist), BZA process flowchart, and BZA calendar are attached. This should be enough to get you started. Good Luck! Angie Conn, Planning Administrator City of Carmel Planning Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr. Carmel, IN 46032 0: 317 571 -2417 1 F: 317 571 -2426 I W: www.carmeldocs.com Please consider the environment before printing this e-mail Ms. Conn, Please give me a call at 440- 897 -4332. Thanks, Don Highlander ConnectingSpaces LLC 888 511 -0147 V 440- 897 -4332 C E: aconnAcarmel.in.gov From: Don Highlander fmailto :don(aconnectinasDaces.coml Sent: Thursday, October 13, 2011 3:07 PM To: Conn, Angelina V Subject: St. Mary's Coptic Orthodox Church We would like to see if we can still file an application for the November meeting for a Special Use Permit for St. Mary and St. Mark Coptic Orthodox on 12174 Shelborne Road. 2 Donald Highlander From: Ellison, Christopher M <CEllison@carmel.in.gov> Sent: Tuesday, October 18, 2011 4:09 PM To: Don Highlander Subject: RE: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road All projects to be reviewed by the Carmel Fire Dept. must have hard copy too scale plans submitted to us. Respectfully, Capt. Chris Ellison Deputy Fire Marshal Carmel Fire Dept. 317 -571 -2621 Original Message From. Don Highlander [mailto:don(2 connectingspaces.com] Sent: Tue 10/18/2011 2.56 PM To. Donahue -Wold, Alexia K; Conn, Angelina V, Akers, William P; Hohlt, William G; Brooke Gajownik; Ellison, Christopher M, Dan Davenport Mindham, Daren; Huffman, David; Littlejohn, David W; David Lucas; Doland Wise; Duane Whiting; Duncan, Gary R, Gary McNamee; Greg Hoyes; Gregory Ilko; Jason Kirkman, Jason Lemaster; Blanchard, Jim E, Joanie Clark; Duffy, John M; Thomas, John G; Forward for Westermeier, Mark; Redden, Nick; Ron Farrand; Ryan Hartman; Shirely Hunter, Steven Krebs; Krueskamp, Theresa A; Green, Timothy J; Troy Yackle Subject: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road Carmel Technical Advisory Committee, We have attached the application and preliminary plans in PDF format for a Special Use permit request for St. Mary and St. Mark Coptic Orthodox Church. If you desire a hardcopy of this submittal, simply reply to this e-mail and we will send prints to you. Thanks you for your help in this matter. Don Highlander ConnectingSpaces LLC 888 -511 -0147 V 440 897 -4332 C 1 Donald Highlander From: Ryan Hartman <Ryan.Hartman @CTRWD.ORG> Sent: Tuesday, October 18, 2011 5:08 PM To: Don Highlander Subject: RE: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road Attachments: 400 SAN PP1 ALT.dwg; SanitaryGravityP &P400.PDF Don, Once you get to that point we will require plans that show plan and profile view of the sanitary sewer being installed. Sewer lateral location, sanitary sewer application, IDEM Permit, 25' SSE easement and dedication of sewer will also be required. Is the building going to be demolished before you get a sanitary sewer permit? Is there any kitchen facility going to be installed? Asbuilt ACAD and .pdf file of the sanitary sewer is attached for your use. Please let me know if you have any questions or go to our web site at www.ctrwd.orq for more information. Thank you. Ryan Hartman, District Engineer Clay Township Regional Waste District 10701 N. College Avenue, Suite A Indianapolis, Indiana 46280 Phone 317 844 -9200 Fax 317 844 -9203 Website www.ctrwd.orq Email ryan.hartmanactrwd.orq From: Don Highlander f mailto :don@lconnectingspaces.coml Sent: Tuesday, October 18, 2011 3:56 PM To: Alexia Donahue Wold; Angie Conn; Bill Akers; Bill Hohlt; Brooke Gajownik; Chris Ellison; Dan Davenport; Daren Mindham; Dave Huffman; David Littlejohn; David Lucas; Doland Wise; Duane Whiting; Gary Duncan; Gary McNamee; Greg Noyes; Gregory Ilko; Jason Kirkman; Jason Lemaster; Jim Blanchard; Joanie Clark; John Duffy; John Thomas; Mark Westermeier; Nick Redden; Ron Farrand; Ryan Hartman; Shire ly Hunter; Steven Krebs; Terry Krueskamp; Tim Green; Troy Yackle Subject: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road Carmel Technical Advisory Committee, We have attached the application and preliminary plans in PDF format for a Special Use permit request for St. Mary and St. Mark Coptic Orthodox Church. If you desire a hardcopy of this submittal, simply reply to this e-mail and we will send prints to you. Thanks you for your help in this matter. Don Highlander ConnectingSpacels 888 511 -0147 V 440- 897 -4332 C 1 Donald Highlander From: Sent: To: Cc: Subject: Attachments: Conn, Angelina V <Aconn c@carmel.in.gov> Wednesday, October 19, 2011 1:39 PM Boone, Rachel M.; Blanchard, Jim E; Donahue -Wold, Alexia K; Hancock, Ramona B; Hollibaugh, Mike P; Keeling, Adrienne M; Littlejohn, David W; Martin, Candy; Mindham, Daren; Stewart, Lisa M; Tingley, Connie S; Mishler, Nicholas F; Duncan, Gary R; Maki, Sue; GARY DOXTATER; Thomas, John G; Barnes, David R Don Highlander; mrizkall c@iupui.edu Docket No. Assignment: (V,SU) St. Mary St. Mark Coptic Orthodox Church 11100013 -15) Carmel Green Building Checklist.doc; Development Standards Variance Instructions 2011.pdf I have updated the file. I have contacted the petitioner and issued the necessary Docket Numbers for (V, SU) St. Mary St. Mark Coptic Orthodox Church. They will be the following: (V, SU) St. Mary St. Mark Coptic Orthodox Church. The applicant seeks the following special use development standards variance approvals for a church: Docket No. 11100013 SU ZO Ch. 5.02 Special Uses Religious use on residential site Docket No. 11100014 V ZO Ch. 5.04.01 Max. building height exceeds 35 -ft Docket No. 11100015 V ZO Ch. 5.04.03.F Max. lot coverage exceeds 35% The site is located at 12174 Shelborne Rd. It is zoned S -1 /Residence. Filed by Don Highlander of Connecting Spaces, LLC. Don can be contacted at (440) 897 -4332. Filing Fees: Docket No. 11100013 SU Docket No. 11100014 V Docket No. 11100015 V Total Fee: 1,578.60 (5.5acres) 291.90 (for first variance 89.90 (for each additional variance) $1,960.40 Filing Dates Deadlines. Petitioner, please note the following: 1. This Item will be on the Nov. 25 agenda of the Technical Advisory Committee. If not done so already, the petitioner must submit plans and review materials to all TAC members ASAP via email and /or mail. The updated TAC members list is online at: http: /www.carmel.in.gov/ Modules /ShowDocument.aspx ?documentID =708. (The TAC meeting agenda will be sent out 10 days prior to this meeting.) 2. Mailed and Published Public Notice needs to occur no later than Nov. 3. Published notice is required within the Indianapolis Star. Note: in addition to certified mailings to neighbors and public notice ad, the placement of a public hearing sign on the property is also required by the BZA Rules of Procedure, Article VI, Section 6 (see application). Make sure the public notice meeting time to the newspaper and neighbors reads 6 PM and the location reads City Hall Council Chambers. It is suggested to send the notice to the Indianapolis Star newspaper by Noon, two days prior to the printing deadline (317 -444 -7163 or email: publicnotices @indystar.com). 3. The Proof of Notice will need to be received by this Department no later than noon, Friday, Nov. 25. Failure to submit Proof of Notice by this time will result in the tabling of the petition. 4. The Filing Fee and Nine (9) Informational Packets must be delivered to BZA Secretary Connie Tingley no later than NOON, Friday, Nov. 18. Failure to submit Informational Packets by this time will result in the automatic tabling of the petition. 5. This item will appear on the Nov. 28 agenda of the Board of Zoning Appeals Regular Meeting under Public Hearings. 1 6. The petitioner will need to provide a fully filled -out Findings -of -Fact sheet for each petition the night of the meeting for the Board's use (Sheet 8). On Ballot sheets, only fill out docket number, petitioner, and date (Sheet 7). Ballot sheets must be collated. 7. Either the Petitioner or someone representing the Petitioner must be present at the meetings for the item to be heard. If no one appears, it will be tabled. 8. Please refer to your instruction sheet for more details. P/Z Department's Review Comments. Petitioner, please respond to the following: 1. Please submit a filled out development standards variance application for the 2 variances; see attached. (They can be withdrawn at a later date, if determined that they are not needed) 2. Make sure the public notice meeting time to the newspaper and neighbors reads 6:00 PM. It is suggested to send the notice to the Indianapolis Star newspaper by Noon, two days prior to the printing deadline (317 -444 -7163 or email: publicnotices @indystar.com). 3. Please make checks payable to the City of Carmel. 4. Please provide copies of your correspondence with the TAC members and their correspondence with you. 5. Feel free to bring color and material samples to the BZA meeting. 6. Provide a copy of the Official List of Adjacent Property Owners from Hamilton County Auditor's Office from Indianapolis /Marion County. 7. Please provide filled out and notarized Placement of Public Notice Sign affidavit. 8. Provide the filled out Petitioner's Affidavit of Notice of Public Hearing form. 9. Provide the filled out Notice of the Public Hearing before the BZA form. 10. Please provide proof of notice from the Indy Star. 11. Please provide green signed return receipts from the certified mailings. 12. Please submit a full set of to -scale plans on 24 x 36 paper or similar size. Please include the landscape plan, photometric plan, drainage plan, utilities plan, etc. 13. Please provide a more detailed landscape plan showing plantings on the plan, and with planting details and a planting legend. Also, please provide a tree preservation plan. 14. Please provide a photo metric plan with food candle measurements and light fixture details. 15. What is the width of the parking spaces? Please label this on the site plan. 16. Please show /label any easements on the site plan. 17. Please submit a set of to -scale exterior architecture building elevations. Also, please provide details on the building materials and colors. 18. Please provide a floor plan of the building, if available. 19. Please label the building dimensions on the site plan, the longest length and widest width. 20. Road right of way (if any) will need to be dedicated to the City, per the Thoroughfare Plan. Please work with Gary Duncan in the Engineering Dept. on how much r/w is required. (317- 271 2441.) 21. Please label the 50 -ft half road right of way. 22. Prepare an estimated construction cost to comply with the Thoroughfare Plan Alternative Transportation Plan; contact the Engineering Dept. for more details. 2 23. Per the C3 Plan Pedestrian and Bike Plan map, please also show /label a 6 -ft wide bicycle lane and a 10 -ft wide path along Shelborne Rd. on the site plan. (Please work with David Littlejohn, Alternative Transportation Systems Coordinator, on the details of this; 317 571 2417.) 24. Please show a direct path connection from the path along Shelborne Rd. to the building. 25. Please show bike parking location and bike rack details, per section 27.06 of the ordinance. 26. Please show /label the trash dumpster location on the site plan. 27. Will the ground sign be up -lit or internally lit? 28. Please provide the hours of operation and the schedule /programming for the use of the building. 29. Please provide the lot cover percentage. Please include the pavement and building footprints in this calculation. 30. Side yard building setbacks for a church are 25 -ft, per zoning ordinance chapter 26.02.08. Please add this to the site layout plan. 31. Please submit the cut sheets and design details of the parking lot pole lighting and the wall mounted Tight fixtures. 32. Do you propose any fencing? If so please provide details on the fence design location. 33. Please consider using additional LEED or 'green' building practices, such as a white membrane roof, solar panels, skylights, pervious pavers in all or part of the parking area, etc. List is attached. 34. Please label the mechanical equipment locations on the site plan and provide details on how they are screened from view. This includes electric and gas meters. 35. Please make sure that all exterior Tight fixtures have flat lenses and 90- degree cut offs, and have shields on the sides that face residential areas. Thank you, Angie Conn, Planning Administrator City of Carmel Planning Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr. Carmel, IN 46032 0: 317 571 -2417 1 F: 317 571 -2426 1 E: aconn @carmel.in.gov W: www.carmeldocs.com Please consider the environment before printing this e-mail 3 Donald Highlander From: Greg R. Noyes <Greg.Hoyesc hamiltoncounty.in.gov> Sent: Wednesday, October 19, 2011 4 PM To: 'Don Highlander Subject: RE: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road Don Hamilton County Surveyor's Office will require hard copies of the 24x36 sheet for review. If you have any questions, please let me know. tai Don Highlander ConnectingSrpaces LLc 888 511 -0147 V 440- 897 -4332 C ode, ✓l'l, e%e'e Plan Reviewer Hamilton County Surveyor's Office From: Don Highlander f mailto :don@lconnectinaspaces.coml Sent: Tuesday, October 18, 2011 3:56 PM To: Alexia Donahue -Wold; Angie Conn; Bill Akers; Bill Hohlt; Brooke M. Gajownik; Chris Ellison; Dan Davenport; Daren Mindham; Dave Huffman; David Littlejohn; David E. Lucas; Doland Wise; Duane Whiting; Gary Duncan; Gary McNamee; Greg R. Hoyes; Gregory Ilko; Jason IGrkman; Jason T. LeMaster; Jim Blanchard; Joanie Clark; John Duffy; John Thomas; Mark Westermeier; Nick Redden; Ron Farrand; Ryan Hartman; Shirely Hunter; Steven Krebs; Terry Krueskamp; Tim Green; Troy Yackle Subject: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road Carmel Technical Advisory Committee, We have attached the application and preliminary plans in PDF format for a Special Use permit request for St. Mary and St. Mark Coptic Orthodox Church. If you desire a hardcopy of this submittal, simply reply to this e-mail and we will send prints to you. Thanks you for your help in this matter. 1 Donald Highlander From: Conn, Angelina V <Aconn @carmel.in.gov> Sent: Thursday, October 20, 2011 9:33 AM To: Don Highlander Subject: FW: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road Hi Don here is a review comment about the proposed signage, from our Sign Permits Officer, Rachel Boone. Thanks, -Angie Conn, Planning Administrator From: Boone, Rachel M. Sent: Wednesday, October 19, 2011 2:06 PM To: Conn, Angelina V Subject: RE: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road Hi Angie, The signage looks good. The only thing I'd change is the address number height. I believe the minimum size the Fire Department likes to see is 4 inches. 45 sq. ft. is allowed overall and 43.33 is proposed. The height at 5'6" is ok because it is less than 6' tall. I think the building design is very cool! I'm excited for this church to go through. Rachel Rachel/130014e/ Sign Permit Specialist City of Carmel Department of Community Services 317 571 -2417 From: Conn, Angelina V Sent: Wednesday, October 19, 2011 12:07 PM To: Boone, Rachel M. Subject: FW: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road New BZA petition. Signage looks ok, right? -Angie Conn, Planning Administrator From: Don Highlander fmailto :don(aconnectinosoaces.coml Sent: Tuesday, October 18, 2011 3:56 PM To: Donahue -Wold, Alexia K; Conn, Angelina V; Akers, William P; Hohlt, William G; Brooke Gajownik; Ellison, Christopher M; Dan Davenport; Mindham, Daren; Huffman, David; Littlejohn, David W; David Lucas; Doland Wise; Duane Whiting; Duncan, Gary R; Gary McNamee; Greg Hayes; Gregory Ilko; Jason Kirkman; Jason Lemaster; Blanchard, Jim E; Joanie Clark; Duffy, John M; Thomas, John G; Forward for Westermeier, Mark; Redden, Nick; Ron Farrand; Ryan Hartman; Shirely Hunter; Steven Krebs; Krueskamp, Theresa A; Green, Timothy J; Troy Yackle Subject: St. Mary St. Mark Coptic Orthodox Church -12174 Shelborne Road Carmel Technical Advisory Committee, 1 We have attached the application and preliminary plans in PDF format for a Special Use permit request for St. Mary and St. Mark Coptic Orthodox Church. If you desire a hardcopy of this submittal, simply reply to this e-mail and we will send prints to you. Thanks you for your help in this matter. Don Highlander ConnectingSpaccesu 888 511 -0147 V 440- 897 -4332 C 2 Donald Highlander From: Redden, Nick <nredden @carmel.in.gov> Sent: Thursday, October 20, 2011 10:21 AM To: Don Highlander Subject: RE: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road Don, Would you please send prints of this submittal to me? Sincerely, Nick Redden Plan Review Coordinator Department of Engineering City of Carmel From: Don Highlander j mailto :don Sent: Tuesday, October 18, 2011 3:56 PM To: Donahue -Wold, Alexia K; Conn, Angelina V; Akers, William P; Hohlt, William G; Brooke Gajownik; Ellison, Christopher M; Dan Davenport; Mindham, Daren; Huffman, David; Littlejohn, David W; David Lucas; Doland Wise; Duane Whiting; Duncan, Gary R; Gary McNamee; Greg Hoyes; Gregory Ilko; Jason Kirkman; Jason Lemaster; Blanchard, Jim E; Joanie Clark; Duffy, John M; Thomas, John G; Forward for Westermeier, Mark; Redden, Nick; Ron Farrand; Ryan Hartman; Shirely Hunter; Steven Krebs; Krueskamp, Theresa A; Green, Timothy J; Troy Yackle Subject: St. Mary St. Mark Coptic Orthodox Church 12174 Shelborne Road Carmel Technical Advisory Committee, We have attached the application and preliminary plans in PDF format for a Special Use permit request for St. Mary and St. Mark Coptic Orthodox Church. If you desire a hardcopy of this submittal, simply reply to this e-mail and we will send prints to you. Thanks you for your help in this matter. Don Highlander ConnectingSpaces 888 511 -0147 V 440- 897 -4332 C 1 Donald Highlander From: Conn, Angelina V <Aconn @carmel.in.gov> Sent: Thursday, October 20, 2011 11:07 AM To: Donald Highlander Cc: John Molitor Subject: RE: Docket No. Assignment: (V,SU) St. Mary St. Mark Coptic Orthodox Church 11100013 -15) Hi, Don- thanks for the compliment! Thanks, -Angie Angie, 1. This exhibit helps show that you do not need that third variance. We will withdraw docket no. 11100015 V, for lot coverage. 2. For time limit, the start time for a special use project is within 1 year. Zoning ordinance chapter 21.02.07 Time Limit, states: "Any person to whom a Special Use or Special Exception is granted by the Board, under the procedures set forth in this chapter, shall have commenced continuous construction of said Special Use or Special Exception or implemented said Special Use or Special Exception within one year of the date of the granting of the approval or said approval shall become null and void." But for some reason, I thought it might be within 3 years, so I have copied the BZA attorney to see if that is the case.... From: Donald Highlander [mailto:donhighlander @gmail.com] Sent: Wednesday, October 19, 2011 3:18 PM To: Conn, Angelina V Subject: RE: Docket No. Assignment: (V,SU) St. Mary St. Mark Coptic Orthodox Church #11100013 15) Question 1: We calculate that we are covering only 31.55% of the lot and should not need a lot coverage variance. The allowable coverage is 35% in an S -1 district. How can we resolve this? I have attached a Revit drawing that calculates the areas for Building, Green Space and Parking. Question 2: How long does the owner have after a Special Use permit to get a final zoning permit and /or start construction? Thanks as always. You do a great job. Don Highlander ConnectingSpeces «c 888 511 -0147 V 440- 897 -4332 C From: Conn, Angelina V [mailto:Aconn @carmel.in.gov] Sent: Wednesday, October 19, 2011 1:44 PM To: Boone, Rachel M.; Blanchard, Jim E; Donahue -Wold, Alexia K; Hancock, Ramona B; Hollibaugh, Mike P; Keeling, 1 Adrienne M; Littlejohn, David W; Martin, Candy; Mindham, Daren; Stewart, Lisa M; Tingley, Connie S; Mishler, Nicholas F; Duncan, Gary R; Maki, Sue; GARY DOXTATER; Thomas, John G; Barnes, David R Cc: Don Highlander; mrizkall @iupui.edu Subject: RE: Docket No. Assignment: (V,SU) St. Mary St. Mark Coptic Orthodox Church #11100013 -15) Sorry, again, that should read the Nov. 16 TAC meeting, and not the 25 -Angie From: Conn, Angelina V Sent: Wednesday, October 19, 2011 1:39 PM To: Boone, Rachel M.; Blanchard, Jim E; Donahue -Wold, Alexia K; Hancock, Ramona B; Hollibaugh, Mike P; Keeling, Adrienne M; Littlejohn, David W; Martin, Candy; Mindham, Daren; Stewart, Lisa M; Tingley, Connie S; Mishler, Nicholas F; Duncan, Gary R; Maki, Sue; 'GARY DOXTATER'; Thomas, John G; Barnes, David R Cc: 'Don Highlander'; 'mrizkall @iupui.edu' Subject: Docket No. Assignment: (V,SU) St. Mary St. Mark Coptic Orthodox Church #11100013 -15) I have updated the file. I have contacted the petitioner and issued the necessary Docket Numbers for (V, SU) St. Mary St. Mark Coptic Orthodox Church. They will be the following: (V, SU) St. Mary St. Mark Coptic Orthodox Church. The applicant seeks the following special use development standards variance approvals for a church: Docket No. 11100013 SU ZO Ch. 5.02 Special Uses Religious use on residential site Docket No. 11100014 V ZO Ch. 5.04.01 Max. building height exceeds 35 -ft Docket No. 11100015 V ZO Ch. 5.04.03.F Max. lot coverage exceeds 35% The site is located at 12174 Shelborne Rd. It is zoned S -1 /Residence. Filed by Don Highlander of Connecting Spaces, LLC. Don can be contacted at (440) 897 -4332. Filing Fees: Docket No. 11100013 SU Docket No. 11100014 V Docket No. 11100015 V Total Fee: 1,578.60 (5.5acres) 291.90 (for first variance 89.90 (for each additional variance) $1,960.40 2 Filing Dates Deadlines. Petitioner. please note the following: 1. This Item will be on the Nov. 25 NOV. 16 agenda of the Technical Advisory Committee. If not done so already, the petitioner must submit plans and review materials to all TAC members ASAP via email and /or mail. The updated TAC members list is online at: http: /www.carmel.in.gov/ Modules /ShowDocument.aspx ?documentlD =708 (The TAC meeting agenda will be sent out 10 days prior to this meeting.) 2. Mailed and Published Public Notice needs to occur no later than Nov. 3. Published notice is required within the Indianapolis Star. Note: in addition to certified mailings to neighbors and public notice ad, the placement of a public hearing sign on the property is also required by the BZA Rules of Procedure, Article VI, Section 6 (see application). Make sure the public notice meeting time to the newspaper and neighbors reads 6 PM and the location reads City Hall Council Chambers. It is suggested to send the notice to the Indianapolis Star newspaper by Noon, two days prior to the printing deadline (317 -444 -7163 or email: publicnotices @indvstar.com). 3. The Proof of Notice will need to be received by this Department no later than noon, Friday, Nov. 25. Failure to submit Proof of Notice by this time will result in the tabling of the petition. 4. The Filing Fee and Nine (9) Informational Packets must be delivered to BZA Secretary Connie Tingley no later than NOON, Friday, Nov. 18. Failure to submit Informational Packets by this time will result in the automatic tabling of the petition. 5. This item will appear on the Nov. 28 agenda of the Board of Zoning Appeals Regular Meeting under Public Hearings. 6. The petitioner will need to provide a fully filled -out Findings -of -Fact sheet for each petition the night of the meeting for the Board's use (Sheet 8). On Ballot sheets, only fill out docket number, petitioner, and date (Sheet 7). Ballot sheets must be collated. 7. Either the Petitioner or someone representing the Petitioner must be present at the meetings for the item to be heard. If no one appears, it will be tabled. 8. Please refer to your instruction sheet for more details. P/Z Department's Review Comments. Petitioner. please respond to the following: 1. Please submit a filled out development standards variance application for the 2 variances; see attached. (They can be withdrawn at a later date, if determined that they are not needed) 2. Make sure the public notice meeting time to the newspaper and neighbors reads 6:00 PM. It is suggested to send the notice to the Indianapolis Star newspaper by Noon, two days prior to the printing deadline (317 -444 -7163 or email: publicnotices @indvstar.com). 3. Please make checks payable to the City of Carmel. 4. Please provide copies of your correspondence with the TAC members and their correspondence with you. 5. Feel free to bring color and material samples to the BZA meeting. 6. Provide a copy of the Official List of Adjacent Property Owners from Hamilton County Auditor's Office from Indianapolis /Marion County. 7. Please provide filled out and notarized Placement of Public Notice Sign affidavit. 8. Provide the filled out Petitioner's Affidavit of Notice of Public Hearing form. 9. Provide the filled out Notice of the Public Hearing before the BZA form. 10. Please provide proof of notice from the Indy Star. 11. Please provide green signed return receipts from the certified mailings. 12. Please submit a full set of to -scale plans on 24 x 36 paper or similar size. Please include the landscape plan, photometric plan, drainage plan, utilities plan, etc. 13. Please provide a more detailed landscape plan showing plantings on the plan, and with planting details and a planting legend. Also, please provide a tree preservation plan. 14. Please provide a photo metric plan with food candle measurements and Tight fixture details. 15. What is the width of the parking spaces? Please label this on the site plan. 16. Please show /label any easements on the site plan. 17. Please submit a set of to -scale exterior architecture building elevations. Also, please provide details on the building materials and colors. 18. Please provide a floor plan of the building, if available. 19. Please label the building dimensions on the site plan, the longest length and widest width. 20. Road right of way (if any) will need to be dedicated to the City, per the Thoroughfare Plan. Please work with Gary Duncan in the Engineering Dept. on how much r/w is required. (317 -271- 2441.) 21. Please label the 50 -ft half road right of way. 22. Prepare an estimated construction cost to comply with the Thoroughfare Plan Alternative Transportation Plan; contact the Engineering Dept. for more details. 3 23. Per the C3 Plan Pedestrian and Bike Plan map, please also show /label a 6 -ft wide bicycle lane and a 10 -ft wide path along Shelborne Rd. on the site plan. (Please work with David Littlejohn, Alternative Transportation Systems Coordinator, on the details of this; 317 571 2417.) 24. Please show a direct path connection from the path along Shelborne Rd. to the building. 25. Please show bike parking location and bike rack details, per section 27.06 of the ordinance. 26. Please show /label the trash dumpster location on the site plan. 27. Will the ground sign be up -lit or internally lit? 28. Please provide the hours of operation and the schedule /programming for the use of the building. 29. Please provide the lot cover percentage. Please include the pavement and building footprints in this calculation. 30. Side yard building setbacks for a church are 25 -ft, per zoning ordinance chapter 26.02.08. Please add this to the site layout plan. 31. Please submit the cut sheets and design details of the parking lot pole lighting and the wall mounted light fixtures. 32. Do you propose any fencing? If so please provide details on the fence design location. 33. Please consider using additional LEED or 'green' building practices, such as a white membrane roof, solar panels, skylights, pervious pavers in all or part of the parking area, etc. List is attached. 34. Please label the mechanical equipment locations on the site plan and provide details on how they are screened from view. This includes electric and gas meters. 35. Please make sure that all exterior Tight fixtures have flat lenses and 90- degree cut offs, and have shields on the sides that face residential areas. Thank you, Angie Conn, Planning Administrator City of Carmel Planning Zoning Division Dept. of Community Services 1 Civic Square, 3rd Fir. Carmel, IN 46032 0: 317-571-2417 I F: 317 571 -2426 1 E: aconnOcarmel.in.gov W: www.carmeldocs.com Please consider the environment before printing this e-mail 4 Donald Highlander From: John Molitor <jmolitor @prodigy.net> Sent: Thursday, October 20, 2011 12:23 PM To: Conn, Angelina V; Donald Highlander Subject: Re: Docket No. Assignment: (V,SU) St. Mary St. Mark Coptic Orthodox Church 11100013 -15) Angie This is one of those provisions that should be changed to allow up to three years, for the sake of consistency. There is a state law, IC 36 -7 -4 -1109, which requires that an application should be reviewed under the same laws that were in effect at the time of application, for at least three years. Our ordinance has not yet caught up to that law, unfortunately. However, the prior approval of a Special Use should serve as a precedent for re- approval if the applicant has to reapply. John Molitor Counsel to the Carmel Plan Commission John R. Molitor Attorney at Law 9465 Counselors Row, Suite 200 Indianapolis, IN 46240 Office (317) 843 -5511 Mobile (317) 506 -8090 From: "Conn, Angelina V" <Aconn @carmel.in.gov> To: Donald Highlander <donhighlanderc@gmail.com> Cc: John Molitor <jmolitor ©prodigy.net> Sent: Thursday, October 20, 2011 11:06 AM Subject: RE: Docket No. Assignment: (V,SU) St. Mary St. Mark Coptic Orthodox Church #11100013 -15) Hi, Don thanks for the compliment! 1 This exhibit helps show that you do not need that third variance. We will withdraw docket no. 11100015 V, for lot coverage. 2. For time limit, the start time for a special use project is within 1 year. Zoning ordinance chapter 21.02.07 Time Limit, states: "Any person to whom a Special Use or Special Exception is granted by the Board, under the procedures set forth in this chapter, shall have commenced continuous construction of said Special Use or Special Exception or implemented said Special Use or Special Exception within one year of the date of the granting of the approval or said approval shall become null and void." But for some reason, I thought it might be within 3 years, so I have copied the BZA attorney to see if that is the case.... Thanks, -Angie From: Donald Highlander mailto:donhighlandercgmail.com] Sent: Wednesday, October 19, 2011 3:18 PM To: Conn, Angelina V Subject: RE: Docket No. Assignment: (V,SU) St. Mary St. Mark Coptic Orthodox Church #11100013 -15) Angie, Question 1: We calculate that we are covering only 31.55% of the lot and should not need a lot coverage variance. The allowable coverage is 35% in an S -1 district. How can we resolve this? I have attached a Revit drawing that calculates the areas for Building, Green Space and Parking. Question 2: How long does the owner have after a Special Use permit to get a final zoning permit and /or start construction? Thanks as always. You do a great job Don Highlander ConnectingSpnces LLC 888 -511 -0147 V 440 897 -4332 C From: Conn, Angelina V [mailto:Aconn c@carmel.in.gov] Sent: Wednesday, October 19, 2011 1:44 PM To: Boone, Rachel M.; Blanchard, Jim E; Donahue -Wold, Alexia K; Hancock, Ramona B; Hollibaugh, Mike P; Keeling, Adrienne M; Littlejohn, David W; Martin, Candy; Mindham, Daren; Stewart, Lisa M; Tingley, Connie S; Mishler, Nicholas F; Duncan, Gary R; Maki, Sue; GARY DOXTATER; Thomas, John G; Barnes, David R Cc: Don Highlander; mrizkall@iupui.edu Subject: RE: Docket No. Assignment: (V,SU) St. Mary St. Mark Coptic Orthodox Church #11100013 -15) Sorry, again, that should read the Nov. 16 TAC meeting, and not the 25 -Angie From: Conn, Angelina V Sent: Wednesday, October 19, 2011 1:39 PM To: Boone, Rachel M.; Blanchard, Jim E; Donahue -Wold, Alexia K; Hancock, Ramona B; Hollibaugh, Mike P; Keeling, Adrienne M; Littlejohn, David W; Martin, Candy; Mindham, Daren; Stewart, Lisa M; Tingley, Connie S; Mishler, Nicholas F; Duncan, Gary R; Maki, Sue; 'GARY DOXTATER'; Thomas, John G; Bames, David R Cc: 'Don Highlander; 'mrizkall c@iupui.edu' Subject: Docket No. Assignment: (V,SU) St. Mary St. Mark Coptic Orthodox Church #11100013 -15) I have updated the file. I have contacted the petitioner and issued the necessary Docket Numbers for (V, SU) St. Mary St. Mark Coptic Orthodox Church. They will be the following: (V, SU) St. Mary St. Mark Coptic Orthodox Church. The applicant seeks the following special use development standards variance approvals for a church. Docket No. 11100013 SU ZO Ch. 5.02 Special Uses Religious use on residential site Docket No. 11100014 V ZO Ch. 5.04.01 Max. building height exceeds 35 -ft Docket No. 11100015 V ZO Ch. 5.04.03.F Max. lot coverage exceeds 35% The site is located at 12174 Shelborne Rd. It is zoned S- 1/Residence. Filed by Don Highlander of Connecting Spaces, LLC. 2 Don can be contacted at (440) 897 -4332. 1Filun Fees: Docket No 11100013 SU Docket No. 11100014 V Docket No. 11100015 V Total Fee: 1,578 60 (5.5acres) 291.90 (for first variance 89.90 (for each additional variance) $1,960.40 Filnn Dates Deadlines. Petitioner, please note the following: 1. This Item will be on the NOV. 16 agenda of the Technical Advisory Committee. If not done so already, the petitioner must submit plans and review materials to all TAC members ASAP via email and/or mail. The updated TAC members list is online at: http: /www.carmel.in. gov/ Modules /ShowDocument.aspx ?documentID=708 (The TAC meeting agenda will be sent out 10 days prior to this meeting.) 2. Mailed and Published Public Notice needs to occur no later than Nov. 3. Published notice is required within the Indianapolis Star. Note: in addition to certified mailings to neighbors and public notice ad, the placement of a public hearing sign on the property is also required by the BZA Rules of Procedure, Article VI, Section 6 (see application). Make sure the public notice meeting time to the newspaper and neighbors reads 6 PM and the location reads City Hall Council Chambers. It is suggested to send the notice to the Indianapolis Star newspaper by Noon, two days prior to the printing deadline (317- 444 -7163 or email: publicnotices @indystar.com). 3. The Proof of Notice will need to be received by this Department no later than noon, Friday, Nov. 25 Failure to submit Proof of Notice by this time will result in the tabling of the petition. 4. The Filing Fee and Nine (9) Informational Packets must be delivered to BZA Secretary Connie Tingley no later than NOON, Friday, Nov. 18. Failure to submit Informational Packets by this time will result in the automatic tabling of the petition. 5 This item will appear on the Nov. 28 agenda of the Board of Zoning Appeals Regular Meeting under Public Hearings. 6. The petitioner will need to provide a fully filled -out Findings of Fact sheet for each petition the night of the meeting for the Board's use (Sheet 8). On Ballot sheets, only fill out docket number, petitioner, and date (Sheet 7). Ballot sheets must be collated. 7. Either the Petitioner or someone representing the Petitioner must be present at the meetings for the item to be heard. If no one appears, it will be tabled. 8. Please refer to your instruction sheet for more details. P/Z Department's Review Comments. Petitioner, please respond to the following: 1. Please submit a filled out development standards variance application for the 2 variances; see attached. (They can be withdrawn at a later date, if determined that they are not needed) 2. Make sure the public notice meeting time to the newspaper and neighbors reads 6:00 PM. It is suggested to send the notice to the Indianapolis Star newspaper by Noon, two days prior to the printing deadline (317 -444 7163 or email: publicnotices @indystar.com). 3. Please make checks payable to the City of Carmel. 4. Please provide copies of your correspondence with the TAC members and their correspondence with you. 5. Feel free to bring color and material samples to the BZA meeting. 3 6. Provide a copy of the Official List of Adjacent Property Owners from Hamilton County Auditor's Office from Indianapolis/Marion County. 7. Please provide filled out and notarized Placement of Public Notice Sign affidavit. 8. Provide the filled out Petitioner's Affidavit of Notice of Public Hearing form. 9 Provide the filled out Notice of the Public Hearing before the BZA form. 10. Please provide proof of notice from the Indy Star. 11. Please provide green signed return receipts from the certified mailings. 12. Please submit a full set of to -scale plans on 24 x 36 paper or similar size. Please include the landscape plan, photometric plan, drainage plan, utilities plan, etc. 13. Please provide a more detailed landscape plan showing plantings on the plan, and with planting details and a planting legend. Also, please provide a tree preservation plan. 14. Please provide a photo metric plan with food candle measurements and light fixture details. 15 What is the width of the parking spaces? Please label this on the site plan. 16. Please show /label any easements on the site plan. 17. Please submit a set of to -scale exterior architecture building elevations. Also, please provide details on the building materials and colors. 18. Please provide a floor plan of the building, if available 19. Please label the building dimensions on the site plan, the longest length and widest width. 20. Road right of way (if any) will need to be dedicated to the City, per the Thoroughfare Plan. Please work with Gary Duncan in the Engineering Dept. on how much r/w is required. (317- 271- 2441.) 21 Please label the 50 -ft half road right of way. 22. Prepare an estimated construction cost to comply with the Thoroughfare Plan Alternative Transportation Plan, contact the Engineering Dept. for more details 23. Per the C3 Plan Pedestrian and Bike Plan map, please also show /label a 6 -ft wide bicycle lane and a 10 -ft wide path along Shelborne Rd. on the site plan. (Please work with David Littlejohn, Alternative Transportation Systems Coordinator, on the details of this; 317 -571- 2417.) 24. Please show a direct path connection from the path along Shelborne Rd. to the building. 25. Please show bike parking location and bike rack details, per section 27 06 of the ordinance. 26. Please show /label the trash dumpster location on the site plan. 27. Will the ground sign be up -lit or internally lit? 28. Please provide the hours of operation and the schedule /programming for the use of the building. 29. Please provide the lot cover percentage. Please include the pavement and building footprints in this calculation. 30. Side yard building setbacks for a church are 25 -ft, per zoning ordinance chapter 26.02.08 Please add this to the site layout plan. 31. Please submit the cut sheets and design details of the parking lot pole lighting and the wall mounted light fixtures. 32. Do you propose any fencing? If so please provide details on the fence design location. 4 33. Please consider using additional LEED or `green' building practices, such as a white membrane roof, solar panels, skylights, pervious pavers in all or part of the parking area, etc. List is attached. 34. Please label the mechanical equipment locations on the site plan and provide details on how they are screened from view. This includes electric and gas meters. 35 Please make sure that all exterior light fixtures have flat lenses and 90- degree cut offs, and have shields on the sides that face residential areas. Thank you, Angie Conn, Planning Administrator City of Carmel Planning Zoning Division Dept. of Community Services 1 Civic Square, 3rd Fir Carmel, IN 46032 O' 317 571 -2417 1 F• 317 -571 -2426 1 E. aconnecarmeLin.gov W: www.carmeldocs.com Please consider the environment before printing this e-mail 5 Donald Highlander From: Sent: To: Subject: Attachments: Don, Mindham, Daren <dmindham @carmel.in.gov> Monday, October 24, 2011 3:20 PM don @connectingspaces.com; mrizkall @iupui.edu FW: Docket No. Assignment: (V,SU) St. Mary St. Mark Coptic Orthodox Church 11100013 -15) Treedetail Carmel.pdf; Shrubdetail Carmel.pdf; Evergreendetail- Carmel.pdf; Recommended Tree List.pdf; Tree Preservation Detail.pdf; TREE AND SHRUB SCHEDULE sample.docx The following email represents comments for this project specifically addressing the area of urban forestry. I have reviewed the drawing and offer the following comments: URBAN FORESTRY REVIEW COMMENTS 1) Please show the attached Carmel planting details on the plan to ensure proper planting. 2) Existing trees may count toward the linear feet of bufferyard plantings required, however, tree preservation details will need to be shown and implemented. 3) I have attached our recommended tree list along with a sample plant schedule for use on this plan. Hopefully, my notes will make it a little easier. I read the note at the bottom of page L101. It seems that landscaping is on the radar and planned to be addressed later. I will have more in -depth comments then. Thanks. Please illustrate how these comments will be addressed by letter or revised plan. If you have any questions, feel free to contact me. Thanks. Sincerely, Daren Mindham Urban Forester City of Carmel Department of Community Services One Civic Square Carmel, Indiana 46032 Office: 317 571 -2283 From: Conn, Angelina V Sent: Wednesday, October 19, 2011 1:39 PM To: Boone, Rachel M.; Blanchard, Jim E; Donahue -Wold, Alexia K; Hancock, Ramona B; Hollibaugh, Mike P; Keeling, Adrienne M; Littlejohn, David W; Martin, Candy; Mindham, Daren; Stewart, Lisa M; Tingley, Connie S; Mishler, Nicholas F; Duncan, Gary R; Maki, Sue; 'GARY DOXTATER'; Thomas, John G; Barnes, David R Cc: 'Don Highlander'; 'mrizkall @iupui.edu' Subject: Docket No. Assignment: (V,SU) St. Mary St. Mark Coptic Orthodox Church #11100013 -15) I have updated the file. I have contacted the petitioner and issued the necessary Docket Numbers for (V, SU) St. Mary St. Mark Coptic Orthodox Church. They will be the following: 1 (V, SU) St. Mary St. Mark Coptic Orthodox Church. The applicant seeks the following special use development standards variance approvals for a church: Docket No. 11100013 SU ZO Ch. 5.02 Special Uses Religious use on residential site Docket No. 11100014 V ZO Ch. 5.04.01 Max. building height exceeds 35 -ft Docket No. 11100015 V ZO Ch. 5.04.03.F Max. lot coverage exceeds 35% The site is located at 12174 Shelborne Rd. It is zoned S -1 /Residence. Filed by Don Highlander of Connecting Spaces, LLC. Don can be contacted at (440) 897 -4332. Filing Fees: Docket No. 11100013 SU Docket No. 11100014 V Docket No. 11100015 V Total Fee: 1,578.60 (5.5acres) 291.90 (for first variance 89.90 (for each additional variance) $1,960.40 Filing Dates Deadlines. Petitioner, please note the following: 1. This Item will be on the Nov. 25 agenda of the Technical Advisory Committee. If not done so already, the petitioner must submit plans and review materials to all TAC members ASAP via email and /or mail. The updated TAC members list is online at: http: /www.carmel.in.gov/ Modules /ShowDocument.aspx ?documentlD (The TAC meeting agenda will be sent out 10 days prior to this meeting.) 2. Mailed and Published Public Notice needs to occur no later than Nov. 3. Published notice is required within the Indianapolis Star. Note: in addition to certified mailings to neighbors and public notice ad, the placement of a public hearing sign on the property is also required by the BZA Rules of Procedure, Article VI, Section 6 (see application). Make sure the public notice meeting time to the newspaper and neighbors reads 6 PM and the location reads City Hall Council Chambers. It is suggested to send the notice to the Indianapolis Star newspaper by Noon, two days prior to the printing deadline (317 -444 -7163 or email: publicnotices @indystar.com). 3. The Proof of Notice will need to be received by this Department no later than noon, Friday, Nov. 25. Failure to submit Proof of Notice by this time will result in the tabling of the petition. 4. The Filing Fee and Nine (9) Informational Packets must be delivered to BZA Secretary Connie Tingley no later than NOON, Friday, Nov. 18. Failure to submit Informational Packets by this time will result in the automatic tabling of the petition. 5. This item will appear on the Nov. 28 agenda of the Board of Zoning Appeals Regular Meeting under Public Hearings. 6. The petitioner will need to provide a fully filled -out Findings -of -Fact sheet for each petition the night of the meeting for the Board's use (Sheet 8). On Ballot sheets, only fill out docket number, petitioner, and date (Sheet 7). Ballot sheets must be collated. 7. Either the Petitioner or someone representing the Petitioner must be present at the meetings for the item to be heard. If no one appears, it will be tabled. 8. Please refer to your instruction sheet for more details. P/Z Department's Review Comments. Petitioner. please respond to the following: 1. Please submit a filled out development standards variance application for the 2 variances; see attached. (They can be withdrawn at a later date, if determined that they are not needed) 2. Make sure the public notice meeting time to the newspaper and neighbors reads 6:00 PM. It is suggested to send the notice to the Indianapolis Star newspaper by Noon, two days prior to the printing deadline (317 -444 -7163 or email: publicnotices @indystar.com). 3. Please make checks payable to the City of Carmel. 2 4. Please provide copies of your correspondence with the TAC members and their correspondence with you. 5. Feel free to bring color and material samples to the BZA meeting. 6. Provide a copy of the Official List of Adjacent Property Owners from Hamilton County Auditor's Office from Indianapolis /Marion County. 7. Please provide filled out and notarized Placement of Public Notice Sign affidavit. 8. Provide the filled out Petitioner's Affidavit of Notice of Public Hearing form. 9. Provide the filled out Notice of the Public Hearing before the BZA form. 10. Please provide proof of notice from the Indy Star. 11. Please provide green signed return receipts from the certified mailings. 12. Please submit a full set of to -scale plans on 24 x 36 paper or similar size. Please include the landscape plan, photometric plan, drainage plan, utilities plan, etc. 13. Please provide a more detailed landscape plan showing plantings on the plan, and with planting details and a planting legend. Also, please provide a tree preservation plan. 14. Please provide a photo metric plan with food candle measurements and Tight fixture details. 15. What is the width of the parking spaces? Please label this on the site plan. 16. Please show /label any easements on the site plan. 17. Please submit a set of to -scale exterior architecture building elevations. Also, please provide details on the building materials and colors. 18. Please provide a floor plan of the building, if available. 19. Please label the building dimensions on the site plan, the longest length and widest width. 20. Road right of way (if any) will need to be dedicated to the City, per the Thoroughfare Plan. Please work with Gary Duncan in the Engineering Dept. on how much r/w is required. (317 -271- 2441.) 21. Please label the 50 -ft half road right of way. 22. Prepare an estimated construction cost to comply with the Thoroughfare Plan Alternative Transportation Plan; contact the Engineering Dept. for more details. 23. Per the C3 Plan Pedestrian and Bike Plan map, please also show /label a 6 -ft wide bicycle lane and a 10 -ft wide path along Shelborne Rd. on the site plan. (Please work with David Littlejohn, Alternative Transportation Systems Coordinator, on the details of this; 317 571 2417.) 24. Please show a direct path connection from the path along Shelborne Rd. to the building. 25. Please show bike parking location and bike rack details, per section 27.06 of the ordinance. 26. Please show /label the trash dumpster location on the site plan. 27. Will the ground sign be up -lit or internally lit? 28. Please provide the hours of operation and the schedule /programming for the use of the building. 29. Please provide the lot cover percentage. Please include the pavement and building footprints in this calculation. 30. Side yard building setbacks for a church are 25 -ft, per zoning ordinance chapter 26.02.08. Please add this to the site layout plan. 31. Please submit the cut sheets and design details of the parking lot pole lighting and the wall mounted light fixtures. 32. Do you propose any fencing? If so please provide details on the fence design location. 3 33. Please consider using additional LEED or 'green' building practices, such as a white membrane roof, solar panels, skylights, pervious pavers in all or part of the parking area, etc. List is attached. 34. Please label the mechanical equipment locations on the site plan and provide details on how they are screened from view. This includes electric and gas meters. 35. Please make sure that all exterior Tight fixtures have flat lenses and 90- degree cut offs, and have shields on the sides that face residential areas. Thank you, Angie Conn, Planning Administrator City of Carmel Planning Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr. Carmel, IN 46032 0: 317- 571 -2417 I F: 317 571 -2426 1 E: aconn @carmel.in.gov W: www.carmeldocs.com Please consider the environment before printing this e-mail 4