Contract: 10- 0610.06 Project: 106th Street Drainage Improvements
# Date Construction Substantially Complete: May 15th, 2012
(The date all items were completed, except punch list and removal of traffic control devices.)
Intermediate Completion Date: N/A
Preliminary Inspection made by:
Lance Stahley, CrossRoad
Engineers, P.C.
# Date Punch List Items Completed: May 30,2012
Sod Maintenance Expired on: n/a
# Date Sod Repaired, if necessary: N/A
# Date Failed Material Replaced:n /a
Final Inspection made by:
Lance Stahley, CrossRoad Engineers
on May 30, 2012
satisfactory from Station Entire project to Station
# Date Construction Signs and Temporary Traffic Control Devices Removed:
Pavement Smoothness does comply with Specifications.
Date: May 30, 2012
and all work was found to be
May 15, 2012
Pavement Markings (have not) been placed in accordance with the IMUTCD manual or as directed by the
District Traffic Engineer.
Carmel Street Department
has been tasked with this
responsibility.
Right -of -Way (is) clear of all encroachments.
Date of Last Work May 30, 2012
D ACCEPTANCE
Project Representative
%a $ * /h' r is
By:
* By:
* By:
* By:
City of Carmel Engineer
City of Carmel Engineering Dept. Representative
City of Carmel, Hamilton County
LOC PUBLIC A E
/00T Pr-e&IPT
�OYI' VV a