Loading...
HomeMy WebLinkAboutMorphey/ENG/CO1/Decrease $7,472.50/Intersection Street LightingCITY OF CARMEL TO: City of Carmel Engineering One Civic Square Carmel, IN 46032 Mr. Gary Duncan, P.E. CONTRACT CHANGE ORDER NO.: #1, Final DATE: 7/18/2012 PROJECT NAME: 11 -10, Intersection Street Lighting CITY REQ. NO.: 2201- 50080, 2200 -2000, 203 -509 CITY PO NO.: 25838 CITY PO DATE: 1/18/2012 I. You are directed to make the following changes in this Contract: See Change Order Table attached SCHEDULED ADJUSTMENT ITEM AMOUNT. ( +) OR ( -) DAYS See Change Order Table (attached) ($7,472.50) II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: N/A W.D.C. NO.:_N /A Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order Contract Price will be decreased by this Change Order New Contract Price including this Change Order Contract Time prior to this Change Order 60 Days Net increased resulting from this Change Order Current Contract Time including this Change Order 60 Days This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. $148,496.00 (S7,472.50) $141,023.50 5/30/2012 Completion Date 0 Days 5/30/2012 Completion Date The Above Changes Are Recommended CROSSROAD_ ENGINEERS ENGINEER 3417 Sherman Drive Address Beech Grove, IN 46107 City /State /Zip Date: / //4 2Q /Z., The Above Changes Are Accepted Morphey Construction, Inc CONTRACTOR 1499 N. Sherman Drive Address Indianapolis, IN 46201 City /State /Zip By: 317 - 356.9250 Date: Approved Mary • . B e, ember N�� nt- Lori Watson, Memb ATTEST: Diana Cordray,'E',1erk- Treasurer Date: 7 -3- '7) CITY OF CARMEL INTERSECTION STREET LIGHTING AND SIGNAGE IMPROVEMENTS Project BASE and ALTERNATE BID PROJECT NO. 11 -10 CHANGE ORDER TABLE ITEM NO. ;_. DESCRIPTION -:- : , UNIT PRICE;QUANTITYi, ORIGINAL ORIGINAL, AMOUNT FINAL QUANTITY FINAL ' AMOUNT OVER/UNDER ,.,_1 Mobilization/_Demobilization __$1?19.00 . _ 1 $119.00 1 $11900 $0.00 Street Sign _and Post, Remove _ ;_ $40.00. 4 $160.00 4;;; :$160.00 __ . _ .. _50.00 3 Light and Salvage ssembly an "d Foundation, Remove $250.00 4 $1.000.00 4 51;000.00 $0.00;. 4 Decorative Street Sien_Assembly $1,200,00 4 54,800.00. 4 $4.800,00 _50.00, 5 Concrete Foundation with Grounding, 30 in. Diameter x 96 in. $875.00 8 57,000.00 8 $7,000.00 50.00, 6 Light-Pole Pole Assembly, $8;000.00 8 $64,000.00 1 $64;000.00 $0.00 7 Cable Duct Marker $100.00 4 $400.00 2 5200.00 (5 )0 °, 8 Handhole '._ - $550.00 2 51,100.00, 5 $2,750.00. $1,650.00 9 Electric- Receptacle__ ...$250.00 _ 1 _,5250.00 ; 1 - 5250 :00 .. _ ._ $0,00, 10 Conduit. Steel, Galvanized. 2 in. . - $18.50= : 637 _ 511,784.50. _ 420 $7,770.00 AS,4 . t4,50) 11 Wire, No. 4, Copper, In 2 in. Galvanized Steel Conduit. 4 1/C 58.00 637 $.5,096.00 645 55,160.00 564.00,, ` JCon jfTiAIIrau...•...- $0:00 0 $0.00 $0.00 3 Wire, No. 4, Copper, In Plastic Duct, In Trench, 4 1/C $8.00 544 $4,352.00 280 $2,240.00 $2;112,0, ) 14 Controller Cabinet, PI, Modified $3,850.00 ,: 2 57,700.00 2 57.700:00 $0.00 ';15 Controller Cabinet Foundation, P1, Modified : $950.00 ! 2 $1,900.00 ! 2 51,900.00 $0.00 16 Mulched Seeding $1:50_, 480 . $720.00.. _11.1 :. $166:50', ( !'.,.'�0 Coiduit,,P_VC,3 /4;IN $5.00 10 .. $50.04 10 - $50 00 - ..$0.00` A -1 Mobilization / Demobilization : $119.00- -1 $119.00 1 . $119.00 ___ $0.00: A -2 . Street Sign and Post, Remove S42.00 3 _ 5126.00 3 5126.00 ` 50.00 Light t Pole Assembly and Foundation, Remove A -3 ee 5250.00 4 $1,000.00 4 $1,000.00 $0.00 A-4 I Decorative Street Sian Assembly 51,200.00 3 $3,600.00 3 $3,600.00 $0.00. A 5 Concrete Foundation with Grounding, 30 in. Diameter x 96 in. 5875.00 3 $2;625.00 3 $2,625.00 $0.00 _A -6 Light Pole. Assembly. Street $8,000.00, 3 $24,000.00 ; 3 ^ $24,000.00 50.00 A -7 „Cable:DuetMarker r $100.00_ _ 2 ..5200.00'. ^ -0 ,$0.00 i$200.00) A-8 : Handhole__- -- _ -,- -_- _ ._ _$575.00 1 $575.00; ::2 ., _.$1,150,00 __--- ..$575.00: A -9 , Conduit. Steel „Galvanized, 2 in. 518.50 -` -115. $2,127.50 _ 0` $0.00 1,22 127.'5b.) A-10 W •ire, No. 4, Copper, In 2 in. Galvanized Steel _ Conduit, 4 1/C S8.00 1 l 5 $920.00 148 . $1,184.00 5264.00 -= .. - ' Contg, l'vi :"-1 50.00 ; 0 50.00. 50:00. A -12 Wire, No. 4, Copper, In Plastic Duct, In Trench, 4 1/C $8.00 214 $1,712.00 j 140 51,120.00 I Y :x.0: