Loading...
HomeMy WebLinkAboutCentral Engineering/ENG/CO 6/106th Drainage/Decrease $17,853.27TO: City of Carmel Engineering Dept. One Civic Square Carmel, IN 46032 I. CITY OF CARMEL CONTRACT CHANGE ORDER NO.: DATE: PROJECT NAME: CITY.REQ. NO.: CITY PO NO.: CITY PO DATE: You are directed to make the following changes in this Contract: See Exhibit A attached ITEM See Change Order Table (attached) Final, #6 711812012 10 -06 106th St. Drainage SCHEDULED ADJUSTMEN 4►n oc AMOUNT ( +) OR ( -) DAYS ($17.853271 II. The following referenced Documents further describe the changes outlined in Paragraph 1, and are to be considered a part of this Change Order: R.F.P.: N/A 'W.D.C.:NO.: N/A Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this 9t e d r $845,022.83 Contract Price will be erce� r� -bs Change Order ($17,853.27) New Contract Price including this Change Order $827,169.56 Contract Time prior to this Change Order 0 Days Completion Date Net increased /decreased resulting from this Change Order 0 Days Current Contract Time including this Change Order Days Completion Date This Change Order is for full and. final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above. Changes. Are Recommended Accepted CROSSROAD ENGINEERS. ENGINEER 3417 Sherman Drive Address Beech. Grove, IN City /State /Zip Central Engineering & Const. CONTRACTOR 3862 N Commercial Pkwy Address 46107 Greenfield. IN 46140 City/State /Zip Date: 7/' By:;�- Phone: 317 -894 -1.990 ZD 2- Date: 1 c:11 012 Approved a� 27453 10/6/2010 es Br ainar , Mayor .7L•111ltutu./ a.� ing Mary Lori Watson, Membe ATT ST: Diana Cordray, t° erk- Treasurer Date: ? CITY OF CARMEL 10-06 106th Street Drainage Improvements CHANGE ORDER TABLE ITEM NO. DESCRIPTION UNIT PRICE ORIGINAL QUANTITY ORIGINAL AMOUNT FINAL QUANTITY FINAL AMOUNT OVER/UNDER 1 Mobilization / Demobilization $30,680.00 1 $30,680.00 1 $30,680.00 80.00 2 Maintenance of Traffic $5,000.00 1 $5,000.00 1.00 55,000.00 80.00 3 Clearing Right of Way $38,000.00 1 $38,000.00 1.00 $38,000.00 80.00 4 Sanitary Lateral, Replace (Undistributed) $120.00 30 $3,600.00 8.00 8960.00 $2,640.00 5 Guardrail, Remove and Replace 82,900.00 1 $2,900.00 0.50 81,450.00 01,450.00 6 Linear Ditch Grading $4.00 1248 $4,992.00 573.00 $2,292.00 52.700.00 7 Manhole,TypeC $1,610.00 1 81,610.00 1.00 $1,610.00 $0.00 8 Manhole, Type 1 $5,800.00 4 $23,200.00 4.00 . 823,200.00 $0.00 9 Manhole, Type K $3,800.00 2 $7,600.00 2.00 87,600.00 $0.00 10 Manhole, Type M $6,500.00 1 $6,500.00 1.00 $6,500.00 $0.00 11 12" RCP $49.00 95 $4,655.00 94.00 $4,606.00 549.00 12 15" RCP $52.00 8 $416.00 31.00 $1,612.00 $1,196.00 13 18" RCP $67.00 5 5335.00 5.00 $335.00 $0.00 14 18" HDPE $64.00 26 $1,664.00 6.00 $384.00 $1.280.00 15 30" RCP $98.00 390 $38,220.00 389.00 $38,122.00 598.00 16 43" x 68" Elliptical RCP $210.00 95 $19,950.00 78.00 $16,380.00 $3.570.00 17 29" x 45" Elliptical RCP $138.00 220 $30,360.00 211.80 $29,228.40 51,131.60 18 Reinforced Concrete Box - 4' X 14' $850.00 100 $85,000.00 100.00 $85,000.00 $0.00 19 Reinforced Concrete Box - 4' X 13' $820.00 121 $99,220.00 121.00 599,220.00 $0.00 20 Reinforced Concrete Box - 4' X 1 1' $645.00 71 $45,795.00 71.00 $45,795.00 $0.00 21 Reinforced Concrete Box - 4' X 10' $600.00 55 833,000.00 55.00 $33,000.00 $0.00 22 Reinforced Concrete Box - 4' X 8' $460.00 104 $47,840.00 104.00 $47,840.00 $0.00 23 Mechanically Core Structure $1,500.00 2 $3,000.00 4.00 $6,000.00 $3,000.00 24 Reinforced Concrete Headwall $60,000.00 1 $60,000.00 1.00 $60,000.00 $0.00 25 Handrail $140.00 284 $39,760.00 245.75 $34,405.00 $5,355.00 26 Flowable Fill $69.00 781 $53,889.00 434.00 $29,946.00 $23.943.00 27 Rip Rap, Class 2 $25.00 485 $12,125.00 434.10 $10,852.50 51,272.50 28 Geotextiles $1.25 314 $392.50 559.01 $698.76 $306.26 29 HMA Surface, 9.5 ntn1• $220.00 41 $9,020.00 122.43 $26,934.60 $17,914.60 30 HMA Intermediate, 19.0 nun $600.00 3.5 $2,100.00 5.97 $3,582.00 $1,482.00 31 PCCP, 12 IN. $41.00 '466 819,108.00 452.83 $18,566.03 5539.91 32 PCCP for Driveways, 6 IN. $28.00 43 $1,204.00 28.28 $791.28 $412.72 33 Compacted Agg. No. 53, Base $56.00 20 $1,120.00 37.99 $2,127.44 $1,007.44 34 Concrete, Roll Curb $22.00 168 $4,136.00 279.30 56,144.60 $2,008.60 35 Concrete Sidewalk, 4 IN. $18.00 43 $774.00 120.70 $2,172.60 $1,398.60 36 Nursery Sodding $5.00 3,600 $18,000.00 0.00 $0.00 $18,000.00 37 Erosion Control Measures $5,541.00 1 $5,541.00 1.00 $5,541.00 $0.00 38 Topsoil (Undistributed) $0.50 2,825 $1,412.50 0.00 $0.00 51 412.50 39 Topsoil (Undistributed) $20.00 570 $11,400.00 170.00 $3,400.00 58,000.00 40 Temporary Pumparound $12,160.00 1 $12,160.00 1.00 $12,160.00 $0.00 41 Road Closure Sign Assembly $470.00 10 $4,700.00 8.00 $3,760.00 $940.00 42 Detour Route Marker Assembly $250.00 16 $4,000.00 16.00 $4,000.00 80.00 43 Construction Sign, A $250.00 5 $1,250.00 16.00 $4,000.00 82,750.00 44 Barricade, Ill -B $25.00 246 $6,150.00 316.00 $7,900.00 $1,750.00 *45 Field Order 42 $5,188.34 1 $5,188.34 1.00 $5,188.34 $0.00 *46 Hydro Excavating $15,176.19 1 $15,176.19 1.00 $15,176.19 50.00 *47 Undercut $4,568.85 1 $4,568.85 1.00 $4,568.85 80.00 *48 Mulched Seeding $1.84 3600 $6,624.00 4081.68 $7,510.29 $886.29 *49 Additional Mobilizations $3,366.37 2 $6,732.74 • 2.00 $6,732.74 80.00 *50 Sanitary Relocate /Repair Structure 12 $2,414.18 1 $2,414.18 1.00 $2,414.18 $0,00 *51 Field Engineered Culvert depth/relay • costs $1,826.53 1 $1,826.53 1.00 $1,826.53 $0.00 *52 Headwall 48 Gibraltar $1,171.23 0 $0.00 1.00 $1,171.23 81,171.23 *53 Milling $19,355.00 0 $0.00 1.00 $19,355.00 $19,355.00 *54 Seedin, Mob- Demob 8715.00 1 $715.00 2.00 $1 430.00 $715.00 , T triOF ► G tO`330•.."p2.3..l:9 r ar :,. .mss c :45 X22183 "rz'n er s /V1Z':'S1 :853. 7 TOTAL ORIGINAL CONTRACT PLUS CHANGE ORDER ITEMS ORIGINAL CONTRACT PRICE CHANGE ORDER #1 CHANGE ORDER #2 CHANGE ORDER #3 CHANGE ORDER #4 CHANGE ORDER #5 FINAL CHANGE ORDER #6 NEW CONTRACT AMOUNT INCLUDING APPROVED CHANGE ORDERS • Indicates additional item added to the contract. 8801,777.00 85,188.34 $15,176.19 $4,568.85 $7,339.00 $10,973.45 - 817,853.27 $827,189.56