Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout2010 COIT Bond pay request 31CITY"O'' CA7MEL
JAib1L5 BRAINARD, MAYOR
C1'I'Y OF C:AIIi19EL, INDIANA, REDEVELOPMENT AUTHORITY
COUNTY OPTION INCOME TAN LEASE RENTAL REVENUE BONDS, SERIES 2009
CONSTRUCTION FUND DRAW REQUISITION
NO. 31
Wells Fargo
Atm: Scott I- lagwel1
300 N ,Meridian Street 41600
Inclianapolis, ]N 46204
317 - 9771160
via email: scott.hagwell cuvvellsfareo.eorn
Date: 10th orAL_ust 2012
RE: City of Cannel Keystone Project Note- Depository Account 2009
The undersigned certifies that:
(a) the undersigned is an officer of the City eV Carmel; Indiana;
(b) The amounts set forth on Schedule A are requested to be paid from the City
of Carmel Keystone Note - Depository Account 2009 (82280100);
(c) Each obligation as reflected by the amounts set Ibrth on Schedule A has
been properly incurred; is a proper charge against the Keystone Note -
Depository Account 2009 and has not been tike basis of any previous
withdrawal from the Depository Account; and
(d) Supporting information with respect to each payee designated an Schedule
A as to the amount owing is attached hereto.
COPY OF CARAIEL, INDIANA
13Y:
Diana L. Corclray, Clerk- Treasur
Authorized Officer
DEPARTMENT OF ENCINEP.RIJ\'G
ONE CIVIC SQUARE, CARMEL, TN 46032 OFFICE 317.5712441 is „e 31.7,571.2439
f?A1P.t i, crtgineeriug©carineha goy
SCI I E1)111.11 A
TO CI'T'Y OF (:AI4III.. INDI:\N'A. ItEDE\'ELOI'dIEN'r AUTHORITY
CcIJN ry OPTION INCODIE TAY LEASE 14 EN" I)U, REVENIIE. BONDS, SERIES 2009
(()NSrH211CF111N FUND 1',A1'i\IENT I4EQI11SF1'ION
NO. 31
111-,t no-12
PAYEES NAME K MAILING ADDRESS
Bose McKinney 8: Evans
111 Monument Circle
Suite 2700
Indianapolis, IN 46201
Eagle Valley, Inc.
3401 North Raceway Road
Indianapolis, IN 46234
Umhmgh Cash Advisors Services, LI.0
8365 Keystone Crossing, Su ilc 3(10
1'O Box 40458
Indianapolis, IN 46240 -0458
CrossRoad Engineers
3417 Sherman Drive
(leech Grove, IN 46107
CrossItoad Engineers
3417 Sherman Drive
Beech Grove, IN 46107
AMOUNTS
RE OUISFI'IONED COST ITEMIZATION
$560.50
'589,047.89
5449.31
$7.500.011
519,641.88
'fatal 5117.199.58
, I,6 CIIECRS LISTED IIr:REns"I(I BE NIA LED TO:
CrossRoad Enginoers, PC
A -I
Legal Services in connection with Chesterton Subdivision Drainage hnprovemen
Iiagle Valley Dispute
Inv. 4546797
Chesterton Si bdiv isioo Drainage Improvements (Constructs 001
Projaa 10 -12
P.O. 827445
Mutual Reservation or Rights
A rhilr,:ge Rebate Calculation
All Projects
Inv. 8129424
2009 Bond Management Service
All Projects
P.O. 821787, ASA 42
Inv. 412534 (FINAL)
Southwest Clay Annexation Fins) brtinage Kemal
P.O. 421787, ASA 42
Inv. 412186& 412536
MEMORANDUM
TO: Michael McBride, City Engineer
FROM: Douglas C. Haney, City Attorn
RE:
Bose McKinney & Evans Invoice No. 546797
Contract Dispute with Eagle Valley. Inc.
DATE: July 6, 2012
Ej ORIGINAL
Mike,
Attached is Bose McKinney & Evans' Invoice No. 546797 in the amount of 5560.50 regarding the
contract dispute with Eagle Valley. Please prepare a purchase order to Bose McKinney & Evans in the
amount of S560.50 in payment of this invoice.
Please let me know PROMPTLY if you believe that your Department is not responsible for the
payment of the attached invoice or if you have any questions regarding this memorandum.
Thanks.
/eb
Attachment
tchTn tdTIP< M1■ss 'ci J.tvnrnbonis,Jacnume' bncnKAVnn_ myb, allry ayle 'alley con rin d putt..34b7o7 . duct 6,11I
BOSE
McKINNEY
& EVANS LLP
ATTORNEYS AT LAW
Invoice
008824 City of Carmel
ATTN: Douglas C. Haney
One Civic Square
Carmel, IN 46032
MAIL REMITTANCES TO:
111 Monument Circle, Suite 2700
Indianapolis, Indiana 46204
(317) 684 -5000
June 12, 2012
Invoice No. 546797
Fed. I.D. 35- 0957980
For Legal Services in Connection With:
07- 05- 12P05 :31RC
Matter: 008824 -0149 Contract Dispute with Eagle Valley, Inc.
05/08/12 T. Miller
05/16/12 T. Miller
05/22/12 T. Miller
05/29/12 T. Miller
05/30/12 T. Miller
0.2 59.00 Email from M. Eintrez
regarding matter; email to
D. Haney and M. McBride
regarding confirmation of
previous to
Eagle Valley.
0.3 88.50 Email from counsel for
Eagle Valley regarding
matter; email to D. Haney
and M. McBride regarding
matter and Samilginap
Eagle Valley in matter.
0.2 59.00 Email from M. McBride
regarding confirmation of
eignea
Eagle Valley on project.
0.2 59.00 Email to M. Eintrez
regarding WNSIEWSIMNiffie
payment amount and
finalization of reservation
of rights agreement in
matter.
0.5 147.50 Revisions to Mutual
Reservation of Rights
related to partial payment;
email same to M. Eintrez
for final approval in
matter.
BOSE
McKTNNEY
& EVANS LIP
ATTORNEYS AT LAW
008824 City of Carmel
Invoice
MAIL REMITTANCES TO:
111 Monument Circle, Suite 2709
Indianapolis, Indiana 46204
(317) 614 -5000
Page 2
June 12, 2012
Invoice No, 546797
05/31/12 T. Miller
0.5 147.50 Email from M. Eintrez
regarding matter;
additional emails regarding
1 a
waiver format for partial
payment in matter; email to
M. Eintrez regarding
required lien waiver.
Total for Services $560.50
Total This Invoice. $560.50
* ATTORNEY SUMMARY * ,r * * * * * * * * ,t * * * * *
Billed Hours Bill
Per Hour Worked Amount
T. Miller 295.00
TOTALS
1.90 560.50
1.90 560.50
c
3
co
c
0
S
V Y
H. J. urnunugh It Assoc60105
Cerlltlun Punk Aumintonta, 4P
I.3i151H5tn.+ Clny5:n1; '
Snits 390
P0 Pn' .4U,IP
t no, iinno1, U; .16:510 n.I5P
Pponp 31; ..155.1500
Fu.. 317 .I1;5 1550
wwv..umnaup; l rmn
July 20, 2012
Ms. Diana Cordray, Clerk - Treasurer
City of Carmel
City Hall, One Civic Square
Carmel, IN 46032
Re: Quarterly Summary Statements for Carmel Redevelopment
Authority COLT Lease Rental Revenue Bonds of 2010
Dear Diana:
Attached please find our Cash Advisory Services quarterly summary statement for the period
ending Jtmc 30, 2012. The statement is a summary of activity arid investments in the Huntington
Bank trust account and Wells Fargo Bank Depository Account, which includes interest earned
and expenditures for the quarter. It also includes a summary of investments held in the accounts
as of Junc 30, 2012. •
In preparing our summary, we have relied on the accuracy and reliability of information
provided by the trustee for the bonds, Huntington Bank and the Depository, Wells Fargo Bank.
We have not audited, examined or reviewed the information and express no assurance on it. The
attached summary statements are intended solely for the information and use of management,
and are not intended to be and should not be used by anyone other than management.
We have also attached our quarterly fee bill. We appreciate the opportunity to serve you and
thank the individuals in your organization for their cooperation. 1f you have any questions,
please do not hesitate to call me at 317 -465 -1531.
JAM /ceb
Enclosures
Very truly yours,
Umbaugh Cash Advisory Services, LLC
Jeffrey A Messer
City of Carmel Redevelopment Authority COLT
Lease Rental Revenue Bonds of 2010
• Activity and Fund Balance Summary - Unaudited
• Account Name:
Trust Account:
IFor Period Ending:
Construction Account
Welts Fargo Barth #82280100
June 30, 2012
Date
Activity
Interest Income' Disbursements Other Withdrawals
Other Receipts
Balance
03131112
04130112
05)31112
06)30/12
5
176.29
211.16
217.21
27,461.11
2,072.12
1,570.25
$
5
5 3,691,140.73
2,667,855.91
3,661,994.95
3,660,641.91
Totals
$
604.66 5 31,103.48 5
5
3,660,641.91
interest income is reported on a cash basis and as such does not Include accrued Income on investments.
Also, accrued interest paid on securiM1es Of applicable) Is netted out el first interest payment.
Security
-Face Vaiue -
Cost Basis
Matiunty Pate
YIeId7Rate
.We0s Fargo Bank lnstit. MM Account
$ 3,660,641.91
$ 3,660,541.91
nta
0.07%
Total
5 3,660,641.91
5 3,660,641.91
._ Note'' This statement Is provided ler yourinlnrma ion only, and is a highlight of the bHiclal trust statement.
All information '0 this report was taken from Wells Fargo (lank statements.
City of Carmel Redevelopment Authority COIT
Lease Rental Revenue Bonds of 2010
Activity and Fund Balance Summary - Unaudited
Account Name: Debt Service Reserve Fund
Trust Account: Huntington Bank #4082000031 (formerly UMB #135144.3)
For Period Ending: June 30, 2012
Face Value
Cost Basis
Maturity Date
Yield /Rate
Act v'tty -__ --
Date
Interest Income `
0.0181
Disbursements
Other Withdrawals
5 2,572,377.98
Other Recalpts
Balance
93131112
04;30112
05/31112
06130112
S 8.94
- 0.58
4,677 40
$
4,660.60
-
-
$ -
-
-
$
-
- -
-
-
$ 2,572,151.66
2,567,500.00
2,567,500.58
2,572,377,98
Totals
$ 4,886.92
$
4,660.60
5 -
5
-
$ 2,572,377.98
1. Interest income is repartee on a cash basis and as such does not include accrued income on investments.
Also. accuted interest paid on securities fif applicable) is netted out of first interest payment.
Security
Face Value
Cost Basis
Maturity Date
Yield /Rate
Federated Govt. obligations Fund
5 2,572.377.98
$ 2,572,377.98
rea
0.0181
Total
$ 2,572,377.98
5 2,572,377.98
Note This statement is orovidod for your 1 lfonnation only. and is a highlight el the official trust statement.
All iMOrmation in this reron was taken from Iltentington Bank statements.
H. J. Umbaugh & Associates
Certified Public Accountants, LLP
8365 Keystone Crossing, Suite 300
Ms, Diana Cordray, Clerk- Treasurer
City of Carmel
City Hail
Ono Civic Square
Carmel, IN 46032
Invoice No, 128424
Date 07/20/2012
Client No, C00600
Indianapolis, IN 46240 -2687
(317) 465-1500
Please Include Invoice No, With Remittance
For professional services for Cash Advisory Services rendered in accordance
with the Engagement Letter dated August 28, 2D06
2006 COIT Bonds Debt Service Reserve Fund
See attached for detail of fees.
Carmel Redevelopment Authority C01T 13onds of 2111€1
Cush Advisory Services
Quarterly Fee Calculation
Detail of 2nd Quarter 2012
INVOICE NO. 129424
12010 C011' Bonds Debi Service Reserve Fund
Average
Dale Principal Halnnce Fee
4/30/2012 $ 2,567,503 $ 149,77
5/31/2012 2,567,496 14977
6/30/2012 2,567,500 149 77
Tolnl Pce: $ 449.31
Total Fee for Period Ending June 31E2012: S 44931
Jill Newport
From: Neville, Katie <kneviHe @carmel.in.gov>
Sent: Tuesday, August 07, 2012 10:20 AM
To: . jnewport @crossroadengineers.com
Subject: 2009 bond invoices
Attachments: 2009 bond invoices 080712.pdf; FW: Eagle Valley Chesterton Project (15.0 KB)
Morning Jill,
I've attached copies of the invoices for this month's 2009 bond disbursement. We've got a settlement payment to
Eagle Valley on this disbursement (see email for background info). 1'll need that check sent to:
Troy M. Miller
Bose McKinney & Evans
111 Monument Circle Suite 700
Indianapolis, IN 46204
Thanks!
Kalie Neville
Office Administrator
City of Cannel Engineering Dept.
kneville arycarmel.in.gov
317.571.2432
.yA Please consider the environment before printing this email.
Oita 0:o (Each
UT)* __ r
�t 1 I. �`' A MEL
JAMES BItAINARD, MAYOR
July 23, 2012
Board of Public Works and Safety
One Civic Square
Carmel, Indiana 46032
RE: EAGLE VALLEY CHESTERTON PROJECT — MUTUAL RESERVATION OF RIGHTS — PARTIAL PAYMENT
Dear Board Members:
A 'Mutual Reservation of Rights" (Reservation) to make a payment of $89,047,59 to Eagle Valley's
counsel is attached for Board of Public Works approval and signatures. This payment is being made as
compensation for work performed by i agleVauey on the Chesterton Drainage Project. Although the
dispute over the final payment amount due to Eagle Valley continues, $89,047.89 is the minimum
amount that both sides agree remains due as final payment.
In order to allow this payment amount while maintaining the City's future legal rights, I am
recommending that the Board of Public Works and Safety Presiding Officer and Members sign and
execute this Reservation prior to presentation to the 'Eagle Valley Counsel.
The attached Reservation and Exhibit "A" is presented to the Board for approval and signature.
Sincerely,
ichael
'
T: ' McBride, P.E.
City Engineer
Attachment Reservation of Rights document and Exhibit "A"
S:\ BPW12 \EAGLEVALLEYCHESTERTON.DOC
DEPARTMENT OF ENGINEEIHNG
ONE Qvic SQnMZE, CAR,tier., IN 46032 Ormice 317.571244'1
EAfAIL sngirrecriI14 •C vmcl.in_gnr
F,Ly 317.571.2439
MUTUAL RESERVATiON OF RIGHTS
THIS MUTUAL RESERVATION OF RIGHTS ( "Mutual Reservation ") is entered into
this 151h day of June 2012, by and between the • City of Carmel, by and
through its Board of Public Works and Safety, One Civic Square, Carmel, Indiana 46032
( "City ") and Eagle Valley, Inc., 3401 North Raceway Road, Indianapolis, Indiana 46234
( "Eagle Valley "); both are referred to herein collectively as (the "Parties "), upon the
following terms and conditions:
I, Recitals
1.1 Prior to August 18, 2010, the City advertised its Notice to Bidders for the
Chesterton Subdivision Drainage Improvements, City of Carmel Project 10 -12 (the
Project ").
1.2 On August 18, 2010, Eagle Valley, in response to the City's advertised Notice
to Bidders submitted its Bidder's Itemized Proposal and Declarations for the Project ( "Bid
Proposal ").
1.3 Thereafter, on or about August 24, 2010, Eagle Valley and the City executed
the Agreement for Purchase of Goods and Servicesfor the Project (the "Agreement").
1.4 On or about November 1, 2010, the City and Eagle Valley entered into
Change Order No. 1.
1.5 On or about July 20, 2011, the City issued Change Order No. 2.
1.6 To date, the City and Eagle Valley agree that the City has made payments to
Eagle Valley totaling ($926,069.57).
1/ On August 19, 2011, the City provided Progress Estimate No. 3 (the "City's
Progess Estimate No.3 ") which includes:
Earned to Date $1,015,117.46
Previous Payments: $947,584.34
Earnings this Estimate: $67,533.12
Retainage: ($21,514.77)
Amount Due Contractor: $89,047.89
1.9 On August 31, 2011, Eagle Valley provided its version of the final invoice
titled Progress Estimate No. 3.(the "Eagle Valleys Progress Estimate No. 3 "). Thatversion
of the Progress Estimate No. 3 included:
Original Contract Amount: $860,59075
Change Order No. 1: $362,998.50
Change Order No. 2: $43,230,18
200762118824 -145
Current Contract Amount: $1,266,819.43
Earned to Date:
Previous Payments:
Earnings This Estimate:
Amount Due Contractor:
$1,266,819 43
($926,069.57)
$340,749.88
$340,749.88
1.10 The City rejected Eagle Valley's Progress Estimate No.3.
1.11 The City has approved the Earned to Date amount of $1 ,015,117.46. Based
on the City's Progress Estimate No. 3, the City has made Previous Payments to Eagle
Valley of $926,067.57, resulting in the Amount Due Contractor of $89,047.89.
1.12 The City has comniunicated its willingness to make payment of the amount of
$89,047.89 to. Eagle Valley under this Mutual Reservation for the benefit of both parties
and in exchange for a Partial Waiver of'Liens and Claims attached as Exhibit A.
1.13 The Parties disagree as to the total outstanding balance; if any, due and
owing from City to Eagle Valley for the Project (the "Dispute'). In order allow payment of
$89,047:89 to Eagle Valley, the Parties agree to the terms of this Mutual Reservation as
set forth below.
11. Terms
NOW, THEREFORE, in consideration of the payment, release and other terms,
covenants andconditions hereinafter set forth, The City and Eagle Valley agree as follows:
2.1 Pavmenf by The City to Eagle: The City agrees to pay and Eagle agrees to
accept the .sum of $89,047.89 (the "Payment") pursuant to this Mutual Reservation.
2.2 No Admission of Liability 1 Mutual Reservation: It is expressly understood
and agreed that the pay"rnent and acceptance of the above- stated Payment is not an
admission of liability by any Party hereto, related to the Dispute. The Parties reserve any
and all rights, remedies and defenses (whether in contract or in tort or by statute or equity)
that they may have against each other in relation to the Project and the Dispute, and Eagle
Valley specifically reserves the right to seek compensation above the Payment relating to
the Project up to the full amount of the Dispute through litigation and the acceptance of the
Payment by Eagle Valley is not an admission that Eagle Valley is not entitled to the full
amount under the Dispute orthat the City acknowledges of admits that Eagle Valley is
entitled to additional funds above the Payment
2.3 Authority: The undersigned representatives of the Parties hereto state That
they are the duly authorized representatives of their respective parties, and as such, have
authority to make the statements herein and to execute this Mutual Reservation for and on
behalf of the Parties. The Parties further represent that each of them has conducted all
investigations they deem appropriate to determine whether to enter into this Mutual
2097621/18821 -149 2
Reservation, and that each party has relied upon no representations of fact or law by any
other party hereto or any other entity in deciding to enter into this Mutual Reservation.
2.4 Applicable Law: This Mutual Reservation shall he governed by and
interpreted in accordance with the laws of the State of Indiana.
2.5 Differing Dates of Execution: Notwithstanding differing dates of execution
hereof, this Mutual Reservation shall be deemed to have been made and entered into on
the date specified hereinabove, and except as otherwise provided for herein with respect to
effective dates for specific obligations, if any, shall become binding and effective upon that
date.
2.6 Affidavit of Final Payment, Waiver of Lien and General Release of Claim:
After the Mutual Reservation is fully executed by the Parties, and prior to release of the
Payment by the City, in order to induce the Payment, Eagle provides the attached Partial
Waiver of Liens and Claims Affidavit to discharge a portion of the claim maintained by
Eagle Valley against the City. As documented in Exhibit A.
2.7 Email or Telefax Execution: The Parties agree that the Mutual Reservation
may be executed in parts, each of which shall be deemed an original, but all of which
together shall represent one Mutual Reservation. The execution of an ernailed, telecopied
or facsimiled form of this Mutual Reservation and /or transmission of an executed Mutual
Reservation by the above- referenced method of transmission shall be sufficient and
constitute a binding Mutual Reservation between the Parties.
CITY OF CARMEL, BY AND THROUGH ITS BOARD EAGLE VALLEY, INC.
OF PUBLIC WORKS AND SAFETY
By: By: _ .1,(22,--------
Printed: Printed: Charles H. Norman
Title: Title: President
2697621/8824 -149 3
. .. _. ......
AFFODAMIT AND. WAHVEr-: .0.F. VIEW
Final :X Partial
State. of in-diana.tbinity.tif:Maticia„SS:
Criatie-s[k.fscohlian. being ',.dulyi.sworp
..
contracted
'.statedhat_ he(s hp:is We; ;President .iof
.
Eagle Valley. Inc , having
with leitsrof Carmel Indiana, . to furnish
certain iik-PitPflb! gl4401-10k0..Plae.1.1.5,11qi?"...
.CheSteetOnak,ibiliiiigibil Drairaqe Improvements
!OAR,O.r:Aitci fril*,t0li_03'12iii:)..fFiI0lEO: project kti-OCklm'a§"
lotted in; Flaiiiiltbri..Dbuiitit, Indiana :and
6a. Worri... by of barnel ndrana a•tctOOKheleby.forther state on behalf of the
.
rioOK
eetdri.b-
feh.tFod 06ritiadtbr..
. ,
(raitini"Wabier) t4at:tha 15a lanfe.idtie:fithi
Sum of .:Eicinty NiiTe.itlit5iThand
... . ., . ., ,..
the eit\i.filearniel;Llhdiana. iSithe
Dbllars '($ 89 ,04.66.)
(4E Receipt rcii,Whieh,!iS:hef,ebylakhOWI*011,6f•,
(X)', ThefpOrrie'rittotty;P-ii0.rfs:5.6p0pcorrikea.os,itta
Atf2ay[1-.;orid!fj'attlWivStiOr00n.01;61tr.,isgry.er.ilO
effodtiye upon.recelot.of sudh.pay,frient:
(Final 'Waive!) that the final balance.tlue-Irom
:S. ignrief
sdle:conidaration.for-this.
and for Said a:rnOtlit'r.
Is the,
,
Dollars ($._ );
(. 1)?"F.<eceirit•of.Whi0js!hereby
LYTtier:PPY1:100(*Orik1109):0's
,apknowIedge,d;
I*600.(0.1:1*e_A?%tlq'§06
of
has
or
,
6.611040.1-00‘1*:.(111.8‘
which iS"diveri 16; and f.OT.'Sid:arnaunf.
paytenl:
and re?eases unto Ibe Owner at said pii•inliSe any
the ,ayithieitogfilti01:1 prOpert9:,an!S,I; itapiltiy&tierits:
or IAA, furniSbed:by.ih%undei-Signed'therOto,:an4
any claim or right to Pep' op; account pt any work
yigiersignesi, for si0pttojpe;,.:aicl within the sc�pe of
r.dos .: iribIltWaiiid:'itS1elaifiit' to the balance•
flietit shall he interpreted' .as&a• waiver of ,,those
Tiii-E, Pfegiddrit .
AflidaVit arid Final Waiver
'effectiiie',upon.r.e,ceipt .!:if;scich
. .
II-tart:)..FZg:. th.upclersigpecl waives
and all lien Or .-lakn: bliat'Sgeclei,,.isfy
:thei-.66-ri On a.Ut.ot_tht.tif labor or friatefial
fo64f-:cEt*s; that no :other ,Raity,
ii'erfetit64 or Piateirat- fiirniSheld:th.thA
this .aft icjaVit: and waver i dayisief:,te-tinlief§ibnda
9;flye-Obnita-4,Siti and fcipith.o..in'tris‘.:dOt
,dfairPS.;.
Eagtp.:Valtpy Inc: By .
WITNE8S-MY HAND:AND,10-rAr.tIAL
y 'cc:ortifTlisgion' EigiirtsE 513/21117
SEAL, thiS 2611-C. day Of . January:. :20.112
4...,,„1._.,>4,,,,yr$4, In Alt4.
/ Not-my Ptibli:
Digie,Setiitti Kiitt:, Ndtaf,Y-
,plrihtioN'au.ro-
RdSigirig:In Fignelricks70;:iunfy, Ineliana
EXHIBIT A
IN THE MATTER OF EAGLE VALLEY CHESTERTON DRAINAGE PROJECT:
BOARD OF PUBLIC WORKS AND SAFETY - CITY OF CARMEL
iF %
/
May rJames Brainard — Presiding Officer Date
Mary Ar Burke, Member Date
dor `Pre in ]�
Lori Watson, Member
ATTEST:
Date
k Treasurer Date
Jill Newport
From: McBride, Mike T <MMcBride @carmeLin gov>
Sent: Monday, August 06 2012 3:26 PM
To: Neville, Katie
Subject: FW: Eagle Valley Chesterton Project
BTW, we are looking for payment ASAP. :-)
Michael T. McBride
City Engineer
City of Carmel, Indiana
Original Message
From: Miller, Troy [mailtoamiller @boselaw.com]
Sent: Monday, August 06, 2012 3:11 PM
To: McBride, Mike T
Cc: Miller, Troy
Subject: RE: Eagle Valley Chesterton Project
Mike,
Please process payment normally, but have the actual check mailed to me at my offices so that I can mail to counsel for
Eagle Valley. Thanks.
Troy M. Miller
Bose McKinney & Evans LLP I www.boselaw.com
111 Monument Circle j Suite 2700 1 Indianapolis, Indiana 46204 TMiller @boselaw.com 1 P: 317- 684 -5189 1 F: 317 -223-
0189
Assistant Contact 1 Angela K. Conners I AConners @boselaw.com I P: 317 - 684 -5262 I F: 317 -223 -0262
Original Message
From: McBride, Mike T [mailto:MMcBride @carmel.in.gov]
Sent: Monday, August 06, 2012 12:05 PM
To: Miller, Troy
Subject: RE: Eagle Valley Chesterton Project
The Mutual Reservation of Rights was signed by the BPW on Thursday. We can now process the payment. Should we
process the payment through our normal process?
Michael T. McBride
City Engineer
City of Carmel, Indiana
Original Message
From: Miller, Troy [mailtoamiller @boselaw.com]
Sent: Monday, August 06, 2012 11:08 AM
To: McBride, Mike T
Cc: Miller, Troy
Subject: RE: Eagle Valley Chesterton Project
Mike,
Good morning. Can you update as to the partial payment to Eagle Valley on the Chesterton Drainage Project? Thanks.
Troy M. Miller
Bose McKinney & Evans LLP 1 www.boselaw.com
111 Monument Circle 1 Suite 2700 1 Indianapolis, Indiana 46204 TMiller @boselaw.com
0189
1 P: 317- 684 -5189 I F: 317 -223-
Assistant Contact 1 Angela K. Conners 1 AConners @boselaw.com I P: 317 -684 -5262 I F: 317- 223 -0262
Original Message
From: McBride, Mike T [mailto:MMcBride @carmel.in.gov]
Sent: Tuesday, July 24, 2012 2:56 PM
To: Miller, Troy; Haney, Douglas C
Cc: Barnes, David R; Neville, Katie
Subject: RE: Eagle Valley Chesterton Project
I agree. I'll just have the check delivered to you at your office.
Katie - Can you please make note of this?
Thanks,
Michael T. McBride
City Engineer
City of Carmel, Indiana
Original Message
From: Miller, Troy Imailto:tmiller@boselaw.com]
Sent: Tuesday, July 24, 2012 2:52 PM
To: McBride, Mike T; Haney, Douglas C
Cc: Barnes, David R; Neville, Katie; Miller, Troy
Subject: RE: Eagle Valley Chesterton Project
Mike,
I can either pick it up or you can have it mailed to my office. I prefer to have a paper trail from my office to counsel for
Eagle valley. Thanks.
Troy M. Miller
Bose McKinney & Evans LLP I www.boselaw.com
2
111 Monument Circle I Suite 2700 I Indianapolis, Indiana 46204 TMiller @boselaw.com I P: 317- 684 -5189 I F: 317 -223-
0189
Assistant Contact 1 Angela K. Conners 1 AConners @boselaw.com 1 P: 317 - 684 -5262 I F: 317 - 223 -0262
Original Message
From: McBride, Mike T [mailto:MMcBride @carmel.in.gov]
Sent: Tuesday, July 24, 2012 2:51 PM
To: Miller, Troy; Haney, Douglas C
Cc: Barnes, David R; Neville, Katie
Subject: RE: Eagle Valley Chesterton Project
Troy,
Should I request that this check be delivered by to my office so that you can pick it up for hand deliver to Eagle Valley
Counsel? It could also be delivered to you or to Eagle Valley Counsel directly. What do you think?
Michael T. McBride
City Engineer
City of Carmel, Indiana
Original Message
From: Miller, Troy [mailto:tmiller @boselaw.comn]
Sent: Tuesday, July 24, 2012 2:47 PM
To: McBride, Mike T; Haney, Douglas C
Cc: Barnes, David R; Neville, Katie; Miller, Troy
Subject: RE: Eagle Valley Chesterton Project
Mike,
Thanks for the update. I look forward to the approval and receipt of the funds. Thanks again.
Troy M. Miller
Bose McKinney & Evans LLP I www.boselaw.com
111 Monument Circle I Suite 2700 I Indianapolis, Indiana 46204 TMiller @boselaw.com I P: 317- 684 -5189 1 F: 317 -223-
0189
Assistant Contact 1 Angela K. Conners I AConners @boselaw.com I P: 317 - 684 -5262 I F: 317- 223 -0262
Original Message
From: McBride, Mike T [ mailto:MMcBricle @carmel.in.gov]
Sent: Tuesday, July 24, 2012 2:45 PM
To: Miller, Troy; Haney, Douglas C
Cc: Barnes, David R; Neville, Katie
3
Subject: RE: Eagle Valley Chesterton Project
At this time we expect the agreement to be executed at the Aug. 1st BPW meeting and payment would be processed
ASAP following that approval. This Payment is coming from the 2009 COIT Bond; therefore, we should be able to
expedite the payment. The bond pay requests are usually submitted by the 10th and are received by the vendors by
about the 20th of a given month.
Michael T. McBride
City Engineer
City of Carmel, Indiana
Original Message
From: Miller, Troy [mailto:tmiller @ boselaw.com]
Sent: Tuesday, July 24, 2012 7:44 AM
To: Haney, Douglas C; McBride, Mike T
Cc: Barnes, David R
Subject: RE: Eagle Valley Chesterton Project
Gentlemen,
Any idea on timing for the execution of the Reservation and issuing the partial payment to Eagle Valley? Thanks for your
attention to this matter.
Troy M. Miller
Bose McKinney & Evans LLP I www.boselaw.com
111 Monument Circle I Suite 2700 I Indianapolis, Indiana 46204 TMiller @boselaw.com
0189
P: 317 - 684 -5189 1 F: 317 -223-
Assistant Contact 1 Angela K. Conners I AConners @boselaw.com I P: 317- 684 -5262 I F: 317- 223 -0262
Original Message
From: Haney, Douglas C [rnailto:DHaney @carmel.in.gov]
Sent: Monday, July 23, 2012 2:45 PM
To: McBride, Mike T
Cc: Miller, Troy; Barnes, David R
Subject: RE: Eagle Valley Chesterton Project
PDF is OK, original better.
Original Message
From: McBride, Mike T
Sent: Monday, July 23, 2012 2:44 PM
To: McBride, Mike T; Haney, Douglas C
Cc: 'Miller, Troy'; Barnes, David R
Subject: RE: Eagle Valley Chesterton Project
Troy & Doug,
Will we need the original signed mutual reservation to take to the board for signature, or is this PDF good enough?
4
Thanks,
Michael T. McBride
City Engineer
City of Carmel, Indiana
Original Message
From: McBride, Mike T
Sent: Monday, July 23, 2012 10:41 AM
To: Haney, Douglas C
Cc: 'Miller, Troy'
Subject: RE: Eagle Valley Chesterton Project
Doug,
Last I knew you were reviewing the Mutual Reservation of Rights attached and then I believe your office was going to
take it to the Board for Approval. I do not believe I've seen it on the Boards agenda for approval as of yet.
There is a BPW meeting on Aug 1st. If this document meets your approval, I'll place it in the BPW packet with our agenda
items and get the Boards Approval. It does not appear to have our standard BPW approval page. Shall we attach the
appropriate signature page?
Michael T. McBride
City Engineer
City of Carmel, Indiana
Original Message
From: Haney, Douglas C
Sent: Thursday, July 19, 2012 2:55 PM
To: McBride, Mike T
Cc: 'Miller, Troy'
Subject: RE: Eagle Valley Chesterton Project
Mike: Status, please.
Original Message
From: Miller, Troy [mailto:tmiller @boselaw.com]
Sent: Wednesday, July 18, 2012 12:57 PM
To: Haney, Douglas C
Cc: McBride, Mike T; Miller, Troy
Subject: FW: Eagle Valley Chesterton Project
Importance: High
Doug and Mike,
Have you had a chance to execute the attached Mutual Reservation of Rights and issue partial payment to Eagle Valley?
If not, could you execute the Reservation and have the check payable to Eagle Valley in the amount specified below
mailed to my offices so that I can attempt to narrow the dispute? Thank you in advance.
Troy M. Miller
Bose McKinney & Evans LLP I www.boselaw.com
5
111 Monument Circle I Suite 2700 I Indianapolis, Indiana 46204 TMiller @boselaw.com I P: 317 - 684 -5189 I F: 317 -223-
0189
Assistant Contact 1 Angela K. Conners I AConners @boselaw.com I P: 317- 684 -5262 I F: 317 - 223 -0262
Original Message
From: Miller, Troy
Sent: Tuesday, June 19, 2012 11:42 AM
To: Haney, Douglas C
Cc: McBride, Mike T; Miller, Troy
Subject: RE: Eagle Valley Chesterton Project
Doug,
Attached is the revised Mutual Reservation of Rights with your requested changes. The attached has been executed by
Eagle Valley and Exhibit A attached. Could you please have the attached executed by the City and a PDF copy returned
to me as soon as possible. Thereafter, please issue payment in the amount of $89,047.89 to Eagle Valley and have that
payment sent to my offices for provision to Eagle Valley. Should you have any questions, please do call or email me.
Thank you in advance.
Troy M. Miller
Bose McKinney & Evans LLP I www.boselaw.corn
111 Monument Circle I Suite 2700 1 Indianapolis, Indiana 46204 TMiller @boselaw.com I P: 317- 684 -5189 I F: 317 -223-
0189
Assistant Contact 1 Angela K. Conners 1 AConners @boselaw.com I P: 317 - 684 -5262 I F: 317- 223 -0262
Original Message
From: Haney, Douglas C [mailto:DHaney @carmel.in.gov]
Sent: Wednesday, June 13, 2012 10:34 AM
To: Miller, Troy; McBride, Mike T
Subject: RE: Eagle Valley Chesterton Project
Troy:
One of the problems with this reservation of rights letter is that there is no "Department of Public Works and Safety" in
the City of Carmel. If you want to change that to the "City of Carmel, Indiana, by and through its Board of Public Works
and Safety ", that would be nice. A second problem is that there is no "Exhibit A" attached, although this exhibit is
referenced in the body of the letter. Once I receive a document that is complete and in proper form, I will have it
executed.
Original Message
From: Miller, Troy [mailto:tmiller @boselaw.com]
Sent: Wednesday, June 13, 2012 10:19 AM
To: McBride, Mike T
6
Cc: Haney, Douglas C; Miller, Troy
Subject: FW: Eagle Valley Chesterton Project
Doug and Mike,
I am following up on my email from June 4, 2012. I received another call from Eagle Valley's counsel regarding the
partial undisputed payment. Could you please execute the attached Reservation of Rights and cut a check to Eagle
Valley in the amount of $89,047.89 and forward it to my office. I look forward to receiving these documents.
Thanks.
Troy M. Miller
Bose McKinney & Evans LLP I www.boselaw.com
111 Monument Circle I Suite 2700 I Indianapolis, Indiana 46204 TMiller @boselaw.com 1 P: 317 - 684 -5189 1 F: 317 -223-
0189
Assistant Contact 1 Angela K. Conners I AConners @boselaw.com I P: 317- 684 -5262 I F: 317- 223 -0262
Original Message
From: Miller, Troy
Sent: Monday, June 04, 2012 3:59 PM
To: 'McBride, Mike T'
Cc: 'Haney, Douglas C'; Miller, Troy
Subject: RE: Eagle Valley Chesterton Project
Importance: High
Doug and Mike,
Attached is the Mutual Reservation of Rights that was approved by Doug last month. The attached has been executed
by Eagle Valley. Could you please have the attached executed by the City and a PDF copy returned to me as soon as
possible. Thereafter, please issue payment in the amount of $89,047.89 to Eagle Valley and have that payment sent to
my offices for provision to Eagle Valley. Should you have any questions, please do call or email me. Thank you in
advance.
Troy M. Miller
Bose McKinney & Evans LLP I www.boselaw.com
111 Monument Circle 1 Suite 2700 1 Indianapolis, Indiana 46204 TMiller @boselaw.com 1 P: 317 - 684 -5189 I F: 317 -223-
0189
Assistant Contact I Angela K. Conners 1 AConners @boselaw.com I P: 317 - 684 -5262 I F: 317 - 223 -0262
Original Message
From: McBride, Mike T [mailto:MMcBride @carmel.in.gov]
Sent: Tuesday, May 22, 2012 4:00 PM
To: Miller, Troy
7
Cc: Haney, Douglas C
Subject: FW: Eagle Valley Chesterton Project
Troy,
It appears as if, to date, we have paid Eagle Valley $926,069.57.
Michael T. McBride
City Engineer
City of Carmel, Indiana
Original Message
From: Machala, Dave [ mailto :DMachala @structurepoint.com]
Sent: Tuesday, May 22, 2012 2:24 PM
To: Neville, Katie; McBride, Mike T
Subject: RE: Eagle Valley Chesterton Project
I agree with Katie's number. I had printed a Pay Estimate 43 with retainage released but that has not been signed and
submitted to Carmel.
David
David Machala
RPR, Construction Inspection
7260 Shadeland Station Indianapolis, IN 46256
T 317.547.5580 E dmachala @structurepoint.com
F 317.543.0270 W www.structurepoint.com
C 317.281.9563
From: Neville, Katie [kneville @carmel.in.govj
Sent: Tuesday, May 22, 2012 1:29 PM
To: McBride, Mike T; Machala, Dave
Subject: RE: Eagle Valley Chesterton Project
According to my records, to date Eagle Valley has been paid $926,069.57.
Katie Neville
Office Administrator
City of Carmel Engineering Dept.
kneville @carmel.in.gov
317.571.2432
? Please consider the environment before printing this email.
Original Message
From: McBride, Mike T
Sent: Tuesday, May 22, 2012 1:22 PM
To: Neville, Katie; Machala, Dave
s
Subject: FW: Eagle Valley Chesterton Project
Can you guys help me confirm these numbers ASAP? Thanks,
Michael T. McBride
City Engineer
City of Carmel, Indiana
Original Message
From: Miller, Troy [mailto:tmiller @boselaw.com]
Sent: Wednesday, May 16, 2012 8:42 AM
To: McBride, Mike T; Haney, Douglas C
Cc: Miller, Troy
Subject: FW: Eagle Valley Chesterton Project
Importance: High
Mike and Doug,
Good morning. This is urgent. I need confirmation of the amount paid to date to Eagle Valley on the Chesterton Project.
I have sent several prior emails and place a few calls to Mike's office. I need this information to complete the
reservation of rights agreement previously approved by Doug to make partial payment to Eagle valley in this matter.
Please provide me with the total payments made to Eagle Valley for this project as soon as possible. Thank you in
advance.
Troy M. Miller
Bose McKinney & Evans LLP 1 www.boselaw.com
111 Monument Circle I Suite 2700 I Indianapolis, Indiana 46204 TMiller @boselaw.com I P: 317 - 684 -5189 I F: 317 -223
0189
Assistant Contact 1 Angela K. Conners 1 AConners @boselaw.com 113: 317 - 684 -5262 1 F: 317 - 223 -0262
Original Message
From: Miller, Troy
Sent: Wednesday, April 18, 2012 9:22 AM
To: McBride, Mike T (MMcBride @carmel.in.gov)
Cc: Miller, Troy
Subject: Eagle Valley Chesterton Project
Mike,
I am sorry to keep bugging you regarding this. However, I need for you to confirm the current amount paid by the City
to Eagle Valley on the Chesterton Project. I need that information to move this matter along. Can you get me that
information? Thanks in advance.
Troy M. Miller
Bose McKinney & Evans LLP 1 www.boselaw.com
9
111 Monument Circle 1 Suite 2700 1 Indianapolis, Indiana 46204 TMiller @boselaw.com 1 P: 317 - 684 -5189 I F: 317 -223-
0189
Assistant Contact 1 Angela K. Conners I AConners @boselaw.com I P: 317 - 684 -5262 1 F: 317- 223 -0262
Original Message
From: Miller, Troy
Sent: Thursday, April 12, 2012 10:44 AM
To: McBride, Mike T (MMcBride @carmel.in.gov)
Cc: Miller, Troy
Subject: FW: PDF File - Microsoft Word - 2097621_1
Mike,
Have you had a chance to confirm the actual amount the City has paid to Eagle Valley thus far/ I need to know to gets
this moving forward. Thanks in advance.
Troy M. Miller
Bose McKinney & Evans LLP I www.boselaw.com
111 Monument Circle 1 Suite 2700 1 Indianapolis, Indiana 46204 TMiller @boselaw.com 1 P: 317- 684 -5189 1 F: 317 -223-
0189
Assistant Contact I Angela K. Conners 1 AConners @boselaw.com I P: 317 - 684 -5262 1 F: 317 - 223 -0262
Original Message
From: Miller, Troy
Sent: Friday, April 06, 2012 9:47 AM
To: McBride, Mike T (MMcBride @carmel.in.gov)
Cc: Miller, Troy
Subject: FW: PDF File - Microsoft Word - 2097621_1
Mike,
Can you confirm the actual amount of payment to date to Eagle Valley on the Chesterton Project!
Troy M. Miller
Bose McKinney & Evans LLP I www.boselaw.com
111 Monument Circle I Suite 2700 I Indianapolis, Indiana 46204 TMiller @boselaw.com 1 P. 317-684-5189 I F: 317 -223-
0189
Assistant Contact 1 Angela K. Conners I AConners @boselaw.com I P: 317 - 684 -5262 1 F: 317- 223 -0262
10
Original Message
From: PDF Printer [mailto:helpdesk @boselaw.com]
Sent: Friday, April 06, 2012 9:46 AM
To: Miller, Troy
Subject: PDF File - Microsoft Word - 2097621_1
Attached is the PDF document that you recently printed. Adobe Acrobat Reader is necessary to view this file. Acrobat
Reader can be obtained from http: / /www. adobe. com / products /acrobat /readstep.html
This message and any attachments may contain legally privileged or confidential information, and are intended only for
the individual or entity identified above as the addressee. If you are not the addressee, or if this message has been
addressed to you in error, you are not authorized to read, copy, or distribute this message and any attachments, and we
ask that you please delete this message and attachments (including all copies) and notify the sender. Delivery of this
message and any attachments to any person other than the intended recipient(s) is not intended in any way to waive
confidentiality or a privilege.
All personal messages express views only of the individual sender, and may not be copied or distributed without this
statement.
DISCLAIMER:
This message contains confidential information and is intended only for the individual named. If you are not the named
addressee, you should not disseminate, distribute, utilize, or copy this e -mail. Please notify the sender immediately by e-
mail if you have received this e -mail by mistake, and delete this e -mail from your system. No design changes or decisions
made by e-mail shall be considered part of the contract documents unless otherwise specified, and all design changes
and /or decisions made by e -mail must be submitted as an RFI or a submittal unless otherwise specified. All designs,
plans, specifications and other contract documents (including all electronic files) prepared by American Structurepoint
shall remain the property of American Structurepoint, and American Structurepoint retains all rights thereto, including
but not limited to copyright, statutory and common -law rights thereto, unless otherwise specified by contract. E -mail
transmission cannot be guaranteed to be secure or error -free as information could be intercepted, corrupted, lost,
destroyed, arrive late or incomplete, or contain viruses. The sender therefore does not accept liability for any errors or
omissions in the contents of this message which arise as a result of e -mail transmission. If verification is required, please
request a hard -copy version. American Structurepoint, Inc., 7260 Shadeland Station, Indianapolis, IN 46256, USA,
http://www.structurepoint.com/
http : / /www.emaildisclaimers.com/
11
CrossRoad Engineers, PC
3417 Sherman Drive
Beech Grove, IN 46107
317 - 780 -1555
ORIGINAL
City of Carmel Invoice number 12534
Michael McBride, City Engineer Date 08/01/2012
1 Civic Square
Carmel, IN 46032 Project 2009 BOND PROJECT SERVICES
For services performed June 30, 2012 through July 27, 2012.
PROMPT PAYMENT OF INVOICE IS APPRECIATED!!
These services were provided in accordance with our contract #03.03.10.03 approved March 3, 2010 and
Additional Services #2:
P.O. #21787
Management
Units Amount
Contract Amount 24.00 180,000.00
Percent Complete 100.00
Total 24.00 180, 000.00
Billed
Current Billed
Total
Th. ou!
Ch
President
1.00 7,500.00
1.00 7,500.00
Invoice total
7,500.00
City of Carmel Invoice number 12534 Invoice date 08/01/2012
Page 1
CrossRoad Engineers, PC
3417 Sherman Drive
Beech Grove, IN 46107
317 - 780 -1555
City of Carmel
Michael McBride, City Engineer
1 Civic Square
Carmel, IN 46032
For services performed June 30, 2012 through July 27, 2012.
PROMPT PAYMENT OF INVOICE IS APPRECIATED!!
Invoice number
Date
2 1 n n"1 I t'+ r A ,l
12536
08/01/2012
Project SOUTHWEST CLAY ANNEXATION
These services were provided in accordance with our contract #03.03.10.03, ASA #34 approved March 3, 2010:
PO #25849 dated March 21, 2012.
Final Drainage Report Preparation (100% Complete)
Professional Fees
Billed
Hours Rate Amount
Director 4.00 130.00 520.00
Project Engineer 99.50 85.00 8,457.50
Crew Chief 0.50 80.00 40.00
Reimbursables
Miles
'Than
Chip Cheri
President
ii/
Phase subtotal
Billed
Units Rate Amount
88.00 0.48 42.24
Invoice total
9,059.74
9,059.74
City of Carmel Invoice number 12536
Invoice date 08/01/2012
Page 1
CrossRoad Engineers, PC
3417 Sherman Drive
Beech Grove, IN 46107
317 - 780 -1555
City of Carmel
Michael McBride, City Engineer
1 Civic Square
Carmel, IN 46032
For services performed February 25 through March 23, 2012.
PROMPT PAYMENT OF INVOICE IS APPRECIATED!!
D ORIGINAL
6
03!29/2012
Project SOUTHWEST CLAY ANNEXATION
These services were provided in accordance with our contract #03.03.10,03, ASA 1434 approved March 3, 2010:
PO #25849 dated March 21 2012.
Final Drainage Report
Professional Fees
Director
Project Engineer
Resident Project Representative
Walnut Creek Woods Report
Reimbursables
Mites
Thank Your
Chip Charles
President
Hours
Billed
Rate Amount
400
11550
2,00
Units
130 00 520.00
85 -00 9,817.50
100.00 200.00
Billed
Rate Amount
93,00
0.48 44.64
Phase subtotal 10,582.14
Invoice total
10,582 14
City of Carmel Invoice number 12156
Invoice date 03;29/2012
Page 1