HomeMy WebLinkAboutFirst Group Engineering/ENG/Addl Serv/41,600/Structure Replacement over Tributary Williams Creek at Spring MillFirst Group Engineering Inc.
Engineering - 2012
Appropriation #206- R4462300; P.D. #26542
Contract Not To Exceed $41,600.00
ADDITIONAL SERVICES AMENDMENT TO
AGREEMENT FOR PURCHASE OF GOODS AND SERVICES
THIS AMENDMENT TO THE GOODS AND SERVICES AGREEMENT ( "Agreement ") entered into by and
between the City of Carmel and First Group Engineering, Inc. (the "Vendor"), as City Contract dated August 1, 2012
shall amend the terms of the Agreement by adding the additional services to be provided by Vendor consistent with
the Scope of Work attached hereto and incorporated herein as Exhibit "A ". Furthermore, the terms of the Agreement
shall be amended to include the E- verify requirement as stated in Indiana Code § 22 -5 -1.7 et seq., which is attached
hereto and incorporated herein as Exhibit "B ", as well as the required E- verify Affidavit, attached hereto and
incorporated herein as Exhibit "C ". The terms and conditions of the Agreement shall not otherwise be affected by this
Additional Services Amendment and shall remain in full force and effect.
IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment as follows:
CITY OFCARMEL, INDIANA FIRST GROUP ENGINEERING, INC.
by and through its Board of Public
Works and Safety
By: By:
James Brainard, Presiding Officer Authorized Signature
Date: A
Mary Ann
Date:
Lori S. Watso•,' ember •
Date:
Tana Cordray, IAMC, • erk- Treasurer
Date:
be.,,■ v.i, Cc)lah
Printed Name
i� e b • d e
Title
FID/TIN: 35 - 1 to rt 3 i 7 ,'
Last Four of SSN if Sole Proprietor:
Date: 3 t7 ZS� ZQiz
l \Intapp;l\Uar Dula - AdmuNAVA+4mW`Yro[Svcf Gafx/A Sr<!oe-nno g2012\f MST GR[1UP ENGINEERING - Addl Svc`Ana,L&,c:7,19(2012.I 31'PlAl
July 17, 2012
Mr. Chuck Sims
First Group Engineering Inc.
5925 Lakeside Blvd.
Indianapolis, IN 46278
JAMES BRAINARD, MAYOR
RE: Additional Service Amendment #1, PO # 26542
Dear Mr. Sims:
As we discussed, the City of Carmel has a need for additional professional services and pursuant to our current
contract with First Group, dated October 11, 2011. I have requested and received from you the proposed scope of
services and fee estimates for the following work task:
Additional Service Amendment #1—
Structure Replacement over Tributary of Williams Creek at
Spring Mill Rd, South of 106`h Street
Engineering Services, Design
Not to Exceed: $41,600.00
Per our contract procedural requirements, I hereby approve these Additional Professional Services estimates, and
request that the Board of Public Works ratify the above referenced Contract Amendment.
PLEASE NOTE
Please be advised that "Additional Services" performed on City contracts must be billed separately from the original
contract and other additional services. More importantly, the invoice must reference the appropriate Additional
Service # and P.O. # shown above. Invoices received without the Additional Service # 'referenced will be returned
for proper identification. Thank you for your continued assistance in providing the City of Carmel with your
professional, quality services. If you should have any questions, please give me a call.
Sincerely,
ichael T. McBride, P.E.
City Engineer
Exhibit A-
I l b
iewed and appro ed by:
S. C. Engel, ing
DEPARTMENT OF ENGINEERING Director of Administration
ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FA x 317.571.2439
EMAIL engineering@carmel.in.gov
ENGINEERING, INC.
March 5, 2012
Mike McBride P.E. City /Traffic Engineer
City of Carmel
One Civic Square
Carmel, Indiana 46032
Re: Scope of Services and Fee Proposal
Road Work and Structure Replacement
Unnamed Tributary of Williams Creek
Spring Mill Road, South of 106th Street
Carmel, Indiana.
Consulting Engineers
5925 Lakeside Blvd.
Indianapolis, IN 46278
Phone (317) 290 -9549
Fax (317) 290-9560
6949 Kennedy Avenue
Unit F
Hammond, IN 46323
Phone (219) 844-'6752'
Fax (219) 844 -6795
Dear Mr. McBride:
We appreciate the opportunity to provide a proposal for performing the work as described
in Alternate 2, Appendix 9 of the CBBEL Project No. 07 -0760, Williams Creek
Watershed Master Plan. Please find attached our summary of the proposed work,
estimated design costs and man -hour justification breakdown. Also attached is a copy of
Appendix 9 as reference.
If you have any questions or comments please call me anytime at 317-216-7705,
extension 209 or 317 -372 -7308 (cell).
If email is preferred: csum rr,firsteroupenaineerine.com
Sincerely,
Chuck Sims, Vice - President
Transportation Design Services
First Group Engineering Inc.
STREETS — HIGHWAYS — TRAFFIC — STRUCTURES — WATER — SEWER — SURVEYING — RIGHT -OF -WAY SERVICES
itommiNEW INSFPIVTE OF
TRANSPORTATION
ENGINEERS
ACTIVE MEMBERSHIPS:
AMERICAN SOOETY OF
CIVIL ENGINEERS
INDIANA SOCIETY
OF PROFESSIONAL
LAND SURVEYORS, INC.
INTERNATIONAL
RIGHT OF WAY
ASSOCIATION
ENGINEERING. INC
Road and Drainage Structure Work for
Unnamed Tributary of Williams Creek South of 106th Street
City of Carmel, Indiana
March 1, 2012
SUMMARY
The proposed work items below are for Alternate 2 from Appendix 9 of the Williams Creek Watershed
Master Plan.
The proposed work would include:
• Topographical Survey of project area
• Approximately 900 feet of vertical realignment of Spring Mill Road.
• Approximately 200 feet of vertical realignment of the private drive just south of the unnamed tributary east
side of Spring mill Road.
• Twin 8'X6" concrete culverts under Spring Mill Road
• Soils Investigation for the Design of twin 8'X6" culverts under Spring Mill Road with subgrade and
pavement design considerations.
• Construction Plans including items shown on the Man -hour Justification
• Maintenance of Traffic (MOT) Plans using Detour
• Utility Coordination
• Contract Documents
• Preparation of Water Permits using information as provided in the Master Plan (IDEM 401, Rule 5, Corps
404 and IDNR Construction in a Floodway and possibly County Regulated Drain)
Does not include:
• Stream Modeling, drainage or detention design calculations
• Determination of flood easements, wetland delineation or Environmental Mitigation
• Route Survey Plat
• Addition of sidewalks /bicycle facilities
• Street Lighting
• Plans for MOT phase construction
Estimated Design Costs:
Soils Investigation $ 5,000.00
Survey $ 9,000.00
Design and Permits $ 27,600.00
Total $ 41,600.00
30
MANHOUR JUSTIFICATION - SURVEY
Road and Drainage Structure Work for
Tributary of Williams Creek South of 106th Street
City of Carmel, Indiana
Manhours by Classification
Description
Project
Manager
Design
Engineer
Civil
Designer
Survey
Crew Chief
Total
Pre Design Scope
0
Survey
Letters to Property Owners
2
2
Utility Locates
4
4
Set/Re- Establish Control
6
6
Bench Circuit
6
6
Topo Survey (500 ft. or 500 pts. / day)
1
32
33
Sewer Survey
2
2
Survey Office Process (700 pts / day)
32
32
Research Deeds & Plats
4
4
Route Survey Plat
0
Total Hours
0
0
5
84
89
Hourly Costs
$65.00
$41.13
$33.70
$37.38
Total Salary Costs
$0.00
$0.00
$168.50
$3,139.92
$3,308.42
Overhead 134.42%
$4,447.18
Salary Plus Overhead
$7,755.60
Fixed Fee 15%
$1,163.34
Direct Cost (Motel, Meals, Mileage)
Motel $130.00 per night (0 nights)
$0.00
Meals $26.00 per day (0 days)
$0.00
Mileage $0.44 per Mile (80 miles)
$36.00
$36.00
Total Fee
$8,954.94
$9,000.00
Sheet 1 of 2
roue'
ENGINEERING, RING, INC.
MANHOUR JUSTIFICATION
ROAD DESIGN
Tributary of Williams Creek South of 106th Street
Description
Manhours by Classification
Total
Project Manager
Design Engineer
Civil Designer
Plot and Check Topo for Plan & Profiles
0
0
4
Prepare Preliminary Title & Index Sheets
0
0
6
Preliminary Typical Cross Sections
0
0
4
Design Preliminary Grade and Geometrics
0
4
4
Guard Rail Design
0
6
4
Preliminary Intersection Details
0
0
0
Preliminary Structure Design
0
4
4
Preliminary Plan & Profiles
0
4
16
Preliminary Approach ( drive south of tributary)
0
2
2
Coordination with Soils Investigation
0
0
2
Preliminary Maintenance of Traffic Plans (Detour)
0
0
4
Preliminary Structure Data Tables
0
0
2
Plot and Check Preliminary Cross Sections
0
2
8
Preliminary Coordination with Utilities
0
0
4
Plot and Distribute Preliminary Plans
0
0
2
Preliminary Special Provisions
0
0
0
Preliminary Engineer's Estimate
0
1
4
PRELIMINARY PLANS FOR REVIEW
2
23
70
95
Sheet 2 of 2
MANHOUR JUSTIFICATION
ROAD DESIGN
Tributary of Williams Creek South of 106th Street
Description
Manhours by Classification
Total
Project Manager
Design Engineer
Civil Designer
Finalize Title & Index Sheets
0
1
2
Finalize Typical Cross Sections
0
2
4
Final Structure Design
0
2
8
Finalize Plan & Profiles
0
2
16
Finalize Maintenance of Traffic Plans
0
1
8
Prepare Approach Tables
0
0
2
Final Approach & Drive Details
0
2
6
Spot Elevations Details
0
0
0
Miscellaneous Tables
0
1
4
Final Cross Sections
0
2
6
Final Intersection Details (geometrics)
0
0
0
Final Structure Data Tables
0
1
1
Erosion Control /Stormwater Management Plans
0
4
16
Final Pavement Markings
0
0
2
Utility Coordination
0
0
4
Plot & Distribute Final Plans
0
2
4
Permits
2
16
40
Quantity Calculations
0
2
8
Special Provisions and Contract Documents
0
32
0
Final Engineer's Estimate
0
1
2
Soils Investigation
0
0
0
FINAL PLANS (100% Complete)
2
71
133
206
TOTAL HOURS
4
94
203
301
HOURLY COSTS
$65.00
$39.00
$31.15
TOTAL SALARY COSTS
$260.00
$3,666.00
$6,323.45
$10,249.45
OVERHEAD (134.42)
$13,777.31
SALARY PLUS OVERHEAD
$24,026.76
15% FIXED FEE
$3,604.01
DIRECT COSTS
$0.00
TOTAL FEE
$27,630.77
USE:
$27,600.00