Loading...
HomeMy WebLinkAboutSalsbery Brothers/CO2/Street/increase 640.00/RAB IrrigationTO: CITY OF CARMEL CONTRACT C DATE: PROJECT NA CITY REQ. NO.: CITY PO NO.: CITY PO DATE: N ORDER NO.: D, You are directed to make the following changes in this Contract: (Brief Description) ITEM AMOUNT ( +) OR ( -) DAYS II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other: The changes result in the following adjustment of Contract Price and Contract Ti Contract Price prior to this Change Order $ 41 , J71 Contract Price will be increased /decreased by this Change Order $ (0 y-(. (50 New Contract Price including this Change Order $4.2,0 1 7 Contract Time Prior to this Change Order Days Completion Date Net increased /decreased resulting from this Change Order Days Current Contract Time including this Change Order Days • Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work.. The. Above Changes Are ResQmrr�ende s CkC 1 Pj M n e `? ro0 ect 3 'S Address Ci By The Above Changes Are Acc : -•ted: Approved: CONTRACTe R `%3i .� / A4- S7 A. dress ard, (signature) Phone: "jfl - SO-ArA-d` Date:1 / at \ City /State /Zip,• By: .519-7 (., int name) .i + ¶ture) Phone: g93 63/C;to Date: 7-30_ 20 /.Z L�Ori . son, Member AT " ST: iana Cordray Jerk- Treasurer Date: /L- ichael T. Mc ri• e City Engineer Date: TO: CITY OF CARMEL CONTRACT CHANGE RDER NO.: DATE: `7 � .c.) PROJECT NAME: mb, rc) vow CITY REQ. NO.: C CITY PO NO.:5'c��j� CITY PO DATE: You are directed to make the following changes in this Contract: (Brief Description) ITEM AMOUNT ( +) OR ( -) DAYS II. The following referenced Documents further describe the changes outlined in Paragraph 1, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ Lit, -?-'2, 3S Contract Price will be increased /decreased by this Change Order $ Zo40 , New Contract Price including this Change Order $ ' 1 0 j') ,'3 Contract Time Prior to this Change Order Days Completion Date Net increased /decreased resulting from this Change Order Days Current Contract Time including this Change Order Days Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are Recomm nde ‘ Project Man ger Address Ad ress c, a c \\n-e,\ 1' Q -z-f (9-0.3-?Nori4ez; ..r,i) *22 Ci State /Zip City /State /Zip Lori Watson, Member By 01./11,2_ By: ATTEST: The Above Changes Are Approved: Accepted: CONTRACTOR James Brainard, Mayor Mary Ann Burke, Member (print name) (signature) Phone: 3\1 'to CD `�4 Date: 71 :1 g-01 ture) Phone: - .) /c c Date: 7-3c"--c-71c1/ Diana Cordray, Clerk- Treasurer Date: Michael T. Mc City Engineer Date: Salsbery Brothers Landscaping, Inc. 4317 East 146th Street_ Carmel, IN 46033 317.843.0100 CITY OF CARMEL ONE CIVIC SQUARE CARMEL, IN 46032 Description Proposal No: Proposal Date: Salesperson: Customer No: Work Location: CITY OF CARMEL ONE CIVIC SQUARE CARMEL, IN 46032 Phone: Cell: Email: Quantity 571 -2417 CHANGE ORDER ESTIMATE FOR LOCATING WATER MAIN AND TAPPING WATER UNDER ASPHALT SIDEWALK AT 141ST STREET AND TOWNE ROAD HYDRO EXCAVATION 0054858 7/5/2012 CORY WHISTLER 02- CITYCAR Price MAIN 1.00 ' 640.00 ABOVE TOTAL INCLUDES SPOT DRILLING A HOLE IN THE ASPHALT TO LOCATE THE WATER MAIN BEFORE REMOVAL OF THE ASPHALT PATHWAY. WATER MAIN EXTENSION 1.00 2,460.00 ABOVE TOTAL INCLUDES DIGGING A HOLE APPROXIMATELY 6' X 6' X 8', REMOVAL OF THE SPOILS AND PLACING IN A TRUCK PROVIDED BY THE CARMEL STREET DEPARTMENT WHO WILL HAUL AWAY, EXTENDING A WATER LINE WEST PAST THE ASPHALT PATHWAY (CARMEL UTILITIES TO TAP THE MAIN WATER LINE), AND FILLING THE HOLE BACK IN WITH FLOWABLE FILL TO BOTTOM OF CURRENT ASPHALT DEPTH. CARMEL STREET DEPARTMENT WILL BE RESPONSIBLE FOR CUTTING THE ASPHALT AND REPAIRING THE ASPHALT AFTER CONSTRUCTION. CARMEL STREET DEPARTMENT WILL ALSO PROVIDE BARRICADES TO CLOSE OFF THE SIDEWALK. Net Order: Less Discount: Sales Tax: Taxable Amount: 0.00 Labor: 3,100.00 Page: 1 Amount 640.00 2,460.00 3,100.00 0.00 0.00 3,, 100.00