HomeMy WebLinkAboutSalsbery Brothers/CO2/Street/increase 640.00/RAB IrrigationTO:
CITY OF CARMEL
CONTRACT C
DATE:
PROJECT NA
CITY REQ. NO.:
CITY PO NO.:
CITY PO DATE:
N ORDER NO.: D,
You are directed to make the following changes in this Contract:
(Brief Description)
ITEM
AMOUNT
( +) OR ( -) DAYS
II. The following referenced Documents further describe the changes outlined in Paragraph I, and
are to be considered a part of this Change Order: R.F.P.: W.D.C. No.:
Other:
The changes result in the following adjustment of Contract Price and Contract Ti
Contract Price prior to this Change Order $ 41 , J71
Contract Price will be increased /decreased by this Change Order $ (0 y-(. (50
New Contract Price including this Change Order $4.2,0 1 7
Contract Time Prior to this Change Order Days
Completion Date
Net increased /decreased resulting from this Change Order Days
Current Contract Time including this Change Order Days • Completion Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work..
The. Above Changes Are
ResQmrr�ende s
CkC 1
Pj M n e
`? ro0 ect 3 'S
Address
Ci
By
The Above Changes Are
Acc : -•ted:
Approved:
CONTRACTe R
`%3i .� / A4- S7
A. dress
ard,
(signature)
Phone: "jfl - SO-ArA-d`
Date:1 / at \
City /State /Zip,•
By:
.519-7
(., int name)
.i + ¶ture)
Phone: g93 63/C;to
Date: 7-30_ 20 /.Z
L�Ori . son, Member
AT " ST:
iana Cordray Jerk- Treasurer
Date: /L-
ichael T. Mc ri• e
City Engineer
Date:
TO:
CITY OF CARMEL
CONTRACT CHANGE RDER NO.:
DATE: `7 � .c.)
PROJECT NAME: mb, rc) vow
CITY REQ. NO.: C
CITY PO NO.:5'c��j�
CITY PO DATE:
You are directed to make the following changes in this Contract:
(Brief Description)
ITEM
AMOUNT ( +) OR ( -) DAYS
II. The following referenced Documents further describe the changes outlined in Paragraph 1, and
are to be considered a part of this Change Order: R.F.P.: W.D.C. No.:
Other:
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order $ Lit, -?-'2, 3S
Contract Price will be increased /decreased by this Change Order $ Zo40 ,
New Contract Price including this Change Order $ ' 1 0 j') ,'3
Contract Time Prior to this Change Order Days Completion Date
Net increased /decreased resulting from this Change Order Days
Current Contract Time including this Change Order Days Completion Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are
Recomm nde ‘
Project Man ger
Address Ad ress
c, a c \\n-e,\ 1' Q -z-f (9-0.3-?Nori4ez; ..r,i) *22
Ci State /Zip City /State /Zip Lori Watson, Member
By 01./11,2_
By: ATTEST:
The Above Changes Are Approved:
Accepted:
CONTRACTOR James Brainard, Mayor
Mary Ann Burke, Member
(print name)
(signature)
Phone: 3\1 'to CD `�4
Date: 71 :1 g-01
ture)
Phone: - .) /c c
Date: 7-3c"--c-71c1/
Diana Cordray, Clerk- Treasurer
Date:
Michael T. Mc
City Engineer
Date:
Salsbery Brothers Landscaping, Inc.
4317 East 146th Street_
Carmel, IN 46033
317.843.0100
CITY OF CARMEL
ONE CIVIC SQUARE
CARMEL, IN 46032
Description
Proposal No:
Proposal Date:
Salesperson:
Customer No:
Work Location:
CITY OF CARMEL
ONE CIVIC SQUARE
CARMEL, IN 46032
Phone:
Cell:
Email:
Quantity
571 -2417
CHANGE ORDER ESTIMATE FOR LOCATING WATER MAIN AND TAPPING WATER
UNDER ASPHALT SIDEWALK AT 141ST STREET AND TOWNE ROAD
HYDRO EXCAVATION
0054858
7/5/2012
CORY WHISTLER
02- CITYCAR
Price
MAIN
1.00 ' 640.00
ABOVE TOTAL INCLUDES SPOT DRILLING A HOLE IN THE ASPHALT TO LOCATE
THE WATER MAIN BEFORE REMOVAL OF THE ASPHALT PATHWAY.
WATER MAIN EXTENSION
1.00 2,460.00
ABOVE TOTAL INCLUDES DIGGING A HOLE APPROXIMATELY 6' X 6' X 8',
REMOVAL OF THE SPOILS AND PLACING IN A TRUCK PROVIDED BY THE CARMEL
STREET DEPARTMENT WHO WILL HAUL AWAY, EXTENDING A WATER LINE WEST
PAST THE ASPHALT PATHWAY (CARMEL UTILITIES TO TAP THE MAIN WATER
LINE), AND FILLING THE HOLE BACK IN WITH FLOWABLE FILL TO BOTTOM OF
CURRENT ASPHALT DEPTH. CARMEL STREET DEPARTMENT WILL BE RESPONSIBLE
FOR CUTTING THE ASPHALT AND REPAIRING THE ASPHALT AFTER CONSTRUCTION.
CARMEL STREET DEPARTMENT WILL ALSO PROVIDE BARRICADES TO CLOSE OFF
THE SIDEWALK.
Net Order:
Less Discount:
Sales Tax:
Taxable Amount: 0.00
Labor: 3,100.00
Page: 1
Amount
640.00
2,460.00
3,100.00
0.00
0.00
3,, 100.00