Loading...
HomeMy WebLinkAboutQ/ i S �Y B. 7 Y -, I 0 C. 3 D D. 1 i 1 I I E D. 9 1 L,FGEND INPICATES EXISTIN& CONSTRUCTION INa1(-ATE5 NEW CONSTRUCTION C7= INDICATES LOCATION OF F►RF F E.6. EXTINGUI�1 -t�R GA6INGT INDICATES LOCATION OF PROIJEC -TION 5CREEN MOUNTF -D IN CEILING ABOVE 1NDIGA-fE5 LOGATION OF GA-RD REDDER, G.R. MOUNT DELAY bOTTON C B, E. 7 SERVICE FCF_A. 1 \ .6 G G Drawn Reviewed Issued I G. 1 I C> E.8 t✓E�L 1 FLOOR PLAN 5GALE '. 1%811 = 1'_0 n \/ GENT RAI-.- NOTES 1.) Contractor shall notify architect, in writing, of 6.) Details for partition types noted on plan are shown any discrepancies in the drawings or specifications on sheet A.5 -1 . before construction begins. 7.) All millwork, countertops, etc. require blocking ift 2.) Contractor shall inspect the job site prior to the partition. See elevations and details for construction and notify architect, in writing, of locations. All blocking shall be fire treated any existing construction not shown or noted in the (see specs). drawings. 8.) Due to variation in the levelness of the floor slab 3.) Contractor shall notify architect, in writing, of the contractor is responsible for verifying and any interferences that would prevent construction coordinating all heights. All work is to be as shown on the drawings. fabricated to compensate for these site conditions. 14otify architect, in writing, of floor elevation 4.) All partition location dimensions are taken from changes of more than 2" for the entire job site. the face of gyp. board. 9.) Contractor shall keep an up to date set of drawings 5.) Contractor shall verify all dimensions at the job and specifications at the job site and notify all site and shall notify the architect, in writing, of construction personnel of the latest changes. any discrepancies before construction begins. T 0) r 0 SQ G z 0 F- U U) z 0 V Cc 0 LL Q °iii :D 0 U) �40(�-1 E f o t X•r A HO a W'J J IV 3:U W 4 =a PM u Project No. D177-133 Drawn Reviewed Issued Revisions No. Description Date 1 2 3 4 5 6 7 8 9 10 11