HomeMy WebLinkAboutBPartial Second Floor Plan
1/4' - T-0'
Partial First Floor Plan
1/4' - T -0'
NORTH
PLAN NOTES
lO PROVIDE 5/8" GYP BOARD ON
EXISTING EXTERIOR WALLS. EXTEND TO
6" ABOVE NEW CEILING.
0. ALIGN NEW WALL WITH EXISTING.
l -3 RETURN GYP BOARD AT JAMBS AND
HEADS OF WINDOWS. PROVIDE WOOD
SILL PER DETAIL 2/A -1.2
OPROVIDE DATA, TELEPHONE AND
POWER RUNS FROM IT ROOM AND
ELECTRICAL PANEL TO CONNECT WITH
BUILDING TERMINUS, VERIFY
REQUIREMENTS WITH TENANT.
OPROVIDE ICE MAKER VALVE FOR
REFRIGERATOR./FREEZER.
OPROVIDE PILASTER TO MATCH
OPPOSITE PILASTER WITH BULHEAD.
OCENTER DOOR ON ELEVATOR DOOR.
SO CENTER WALL ON EXTERIOR WALL.
9� CENTER WALL ON WINDOW MULLION
10. FLUSH NEW WALLS WITH EXISTING WALLS.
EXTEND WALLS TO CONCEAL
STRUCTURE.
11. GYP BOARD BULKHEAD AT WINDOW
HEAD. VERIFY HEIGHT IN FIELD.
. PROVIDE a"
12 PLYUWOOD FOR IT/TELE
PANEL,
31-011
3' -0"
WOOD DOOR WOOD DOOR
WOOD MUNTINS
e a
TEY" IPERED
GLASS 24X64
A B
Door Types_
1/4' -1' -0'
DR SIIZr: 2"
TII n
HOLLOW
METAL FRAME e
(PAINT W/ P -2) r T r
16' -0"
2.. 211 31-011 211 31.011 211
TiN
i�
1 -011 211IJ. 31_011 211
NORTH
HOLLOW
METAL FRAME
(PAINT W/ P -2)
TEMPERED `-
GLASS TYP.
fROO1 I FINISH SCHEDULE
NOTES:
I. PATCH AND REPAIR FINSHES TO MATCH EXISTING
2. PROVIDE CHAIR RAIL PER DETAIL 4/Al2
80011 FINISH LEGEND
TAG
DESCRIPTION
WALLS
CEILING
NOTES
NO.
NAME
I FLOOR
I BASE
I NORTH EAST SOUTH WEST
MATERIAL I HEIGHT
R -1
4" COVE VINYL BASE - COLOR SELECTED BY ARCHITECT
200
HALL
EXISTING
SATIN PAINT -COLOR SELECTED BY ARCHITECT
P -2
SEMI -GLOSS PAINT -COLOR SELECTED BY ARCHITECT
1
201
ENTRY
C -1
WD -I
P -1
P -1
P -1
P -1
ACT -1
9' -6"
2
202
COATS
C -1
R -1
P -1
P -1
P -1
P -1
ACT -1
9' -6"
203
CONFERENCE
C -1
WD -1
10-1
P -1
P -1
P -1
ACT -1
9' -6"
2
204
OFFICE
C -1
R -1
P -1
P -1
P -1
P -1
ACT -1
9' -6"
205
OFFICE
C -1
R -1
P -1
P -1
P -1
P -1
ACT -1
9' -6"
206
HALL
C -1
WD -1
P -1
P -1
P -1
P -1
ACT -1
9' -6"
2
20-1
HALL
C -1
WD -1
P -1
P -1
P -1
P -1
ACT -1
9' -6"
2
208
LIBRARY
C -1
R -1
P -1
P -1
P -1
P -1
ACT -1
9' -6"
209
OFFICE
C -1
R -1
P -1
P -1
P -1
P -1
ACT -1
9' -6"
210
HALL
C -1
WD -1
P -1
P -1
P -1
P -1
ACT -1
9' -6"
2
211
STORAGE
C -1
R -1
P -1
P -1
P -1
P -1
ACT -1
9' -6"
212
STORAGE
C -1
R -1
P -1
P -1
P -1
10-1
ACT -1
9' -6"
213
STAIR
GONG
R -1
P -1
P -1
P -1
P -1
214
HALL
C -1
R -1
P -1
P -1
P -1
P -1
ACT -1
9' -6"
215
FILE / COPY
C -1
R -1
P -1
P -1
P -1
P -1
ACT -1
9' -6"
216
IT/TELE /STOR
VCT -1
R -1
P -1
P -1
P -1
P -1
ACT -1
9' -6"
21-1
BREAK ROOM
VCT -1
R -1
P -1
P -1
P -1
P -1
ACT -1
9' -6"
218
WORK
C -1
WD -1
P -1
P -1
P -1
P -1
ACT -1
9' -6"
2
219
OFFICE
C -1
R -1
P -1
P -1
P -1
P -1
ACT -1
9' -6"
220
OFFICE
C -1
R -1
P -1
P -1
P -1
P -1
ACT -1
9' -6"
221
OFFICE
C -1
R -1
P -1
P -1
P -1
P -1
ACT -1
9' -6"
222
OFFICE
C -1
R -1
P -1
P -1
P -1
P -1
ACT -1
9' -6"
223
HALL
C -1
WD -1
P -1
P -1
P -1
I P -1
ACT -1
9' -6"
2
224
HALL
EXISTING
I
NOTES:
I. PATCH AND REPAIR FINSHES TO MATCH EXISTING
2. PROVIDE CHAIR RAIL PER DETAIL 4/Al2
80011 FINISH LEGEND
NOTES: PAINT ALL WOOD SASE, HM DOOR FRAMES AND TRIM W/ P -2
DOOR SCHEDULE
HARDWARE SETS
1. OFFICE SET
1 -1/2 PR BUTTS
2. PASSAGE SET
1 -1/2 PR BUTTS
CLOSER
3. PASSAGE SEt
1 -1/2 PR. BUTTS
4. DUMMY SET
ROLLER CATCH
1 -1/2 PR. BUTTS
5 STORE ROOM SET
1 -1/2 PR. BUTTS
11 31 -011 14211 31 -011 " 3' -011 II
Ti TI Ti
:1E 1.
r
N
NOTES:
HARDWARE MANUFACTURER. MATCH BUILDING STANDARD
DESIGN: MATCH BUILDING STANDARD
FINISH: 613 OIL RUBBED BRONZE
CONTRACTOR TO PROVIDE COMPLETE SCHEDULE FOR ARCHITECT'S APPROVAL
MATCH BUILDING STANDARD UNLESS NOTED
HOLLOW
METAL FRAME
(PAINT W/ P -2)
C a
TEMPERED r r -
GLASS TYP.
e
N
HOLLOW
METAL FRAME
(PAINT W/ P -2)
n
— TEMPERED r T
GLASS TYP.
A B C D E
Frame Types
1/4° -1' -0'
n
HOLLOW
METAL FRAME
(PAINT W/ P -2)
- TEMPERED
GLASS TYP.
JOHN
MOSELE
ARCHITECT
ARCHITECTURE
PLANNING
INTERIOR ARCHITECTURE
317-574-9408
DERICk
REGISTERED
33389 -
STATE OF \
INDIANA
? )�t�
TENANT
IMPROVEMENTS
FOR
ROBERGE &
ROBERGE
SUITE 201
REGENTS BUILDING
12775 HORSEFERRY
CARMEL, IN 46032
rCV151on: date: description:
Second Floor Plan
Partial First Fl. Plan
Room Finish Schedule
Door Schedule
date: July 15, 201 2
project: 1207
Scale: As noted
coord.: JM
drawn: JM A1.1
checked: JM
TAG
DESCRIPTION
GONG
EXISTING CONCRETE SLAB
C -1
CARPET - SELECTED BY ARCHITECT
WD -1
53/4" WOOD BASE SELECTED BY ARCHITECT (PAINT W/ P -2)
R -1
4" COVE VINYL BASE - COLOR SELECTED BY ARCHITECT
10-1
SATIN PAINT -COLOR SELECTED BY ARCHITECT
P -2
SEMI -GLOSS PAINT -COLOR SELECTED BY ARCHITECT
ACT -1
ACOUSTICAL CEILING TILE BY USG BUILDING STANDARD MILLENNIA CLIMAPLUS 2'X2' (SLT) "16-105
PL -1
PLASTIC LAMINATE -COLOR SELECTED BY ARCHITECT
PL -2
PLASTIC LAMINATE -COLOR SELECTED BY ARCHITECT
NOTES: PAINT ALL WOOD SASE, HM DOOR FRAMES AND TRIM W/ P -2
DOOR SCHEDULE
HARDWARE SETS
1. OFFICE SET
1 -1/2 PR BUTTS
2. PASSAGE SET
1 -1/2 PR BUTTS
CLOSER
3. PASSAGE SEt
1 -1/2 PR. BUTTS
4. DUMMY SET
ROLLER CATCH
1 -1/2 PR. BUTTS
5 STORE ROOM SET
1 -1/2 PR. BUTTS
11 31 -011 14211 31 -011 " 3' -011 II
Ti TI Ti
:1E 1.
r
N
NOTES:
HARDWARE MANUFACTURER. MATCH BUILDING STANDARD
DESIGN: MATCH BUILDING STANDARD
FINISH: 613 OIL RUBBED BRONZE
CONTRACTOR TO PROVIDE COMPLETE SCHEDULE FOR ARCHITECT'S APPROVAL
MATCH BUILDING STANDARD UNLESS NOTED
HOLLOW
METAL FRAME
(PAINT W/ P -2)
C a
TEMPERED r r -
GLASS TYP.
e
N
HOLLOW
METAL FRAME
(PAINT W/ P -2)
n
— TEMPERED r T
GLASS TYP.
A B C D E
Frame Types
1/4° -1' -0'
n
HOLLOW
METAL FRAME
(PAINT W/ P -2)
- TEMPERED
GLASS TYP.
JOHN
MOSELE
ARCHITECT
ARCHITECTURE
PLANNING
INTERIOR ARCHITECTURE
317-574-9408
DERICk
REGISTERED
33389 -
STATE OF \
INDIANA
? )�t�
TENANT
IMPROVEMENTS
FOR
ROBERGE &
ROBERGE
SUITE 201
REGENTS BUILDING
12775 HORSEFERRY
CARMEL, IN 46032
rCV151on: date: description:
Second Floor Plan
Partial First Fl. Plan
Room Finish Schedule
Door Schedule
date: July 15, 201 2
project: 1207
Scale: As noted
coord.: JM
drawn: JM A1.1
checked: JM