Loading...
HomeMy WebLinkAboutBPartial Second Floor Plan 1/4' - T-0' Partial First Floor Plan 1/4' - T -0' NORTH PLAN NOTES lO PROVIDE 5/8" GYP BOARD ON EXISTING EXTERIOR WALLS. EXTEND TO 6" ABOVE NEW CEILING. 0. ALIGN NEW WALL WITH EXISTING. l -3 RETURN GYP BOARD AT JAMBS AND HEADS OF WINDOWS. PROVIDE WOOD SILL PER DETAIL 2/A -1.2 OPROVIDE DATA, TELEPHONE AND POWER RUNS FROM IT ROOM AND ELECTRICAL PANEL TO CONNECT WITH BUILDING TERMINUS, VERIFY REQUIREMENTS WITH TENANT. OPROVIDE ICE MAKER VALVE FOR REFRIGERATOR./FREEZER. OPROVIDE PILASTER TO MATCH OPPOSITE PILASTER WITH BULHEAD. OCENTER DOOR ON ELEVATOR DOOR. SO CENTER WALL ON EXTERIOR WALL. 9� CENTER WALL ON WINDOW MULLION 10. FLUSH NEW WALLS WITH EXISTING WALLS. EXTEND WALLS TO CONCEAL STRUCTURE. 11. GYP BOARD BULKHEAD AT WINDOW HEAD. VERIFY HEIGHT IN FIELD. . PROVIDE a" 12 PLYUWOOD FOR IT/TELE PANEL, 31-011 3' -0" WOOD DOOR WOOD DOOR WOOD MUNTINS e a TEY" IPERED GLASS 24X64 A B Door Types_ 1/4' -1' -0' DR SIIZr: 2" TII n HOLLOW METAL FRAME e (PAINT W/ P -2) r T r 16' -0" 2.. 211 31-011 211 31.011 211 TiN i� 1 -011 211IJ. 31_011 211 NORTH HOLLOW METAL FRAME (PAINT W/ P -2) TEMPERED `- GLASS TYP. fROO1 I FINISH SCHEDULE NOTES: I. PATCH AND REPAIR FINSHES TO MATCH EXISTING 2. PROVIDE CHAIR RAIL PER DETAIL 4/Al2 80011 FINISH LEGEND TAG DESCRIPTION WALLS CEILING NOTES NO. NAME I FLOOR I BASE I NORTH EAST SOUTH WEST MATERIAL I HEIGHT R -1 4" COVE VINYL BASE - COLOR SELECTED BY ARCHITECT 200 HALL EXISTING SATIN PAINT -COLOR SELECTED BY ARCHITECT P -2 SEMI -GLOSS PAINT -COLOR SELECTED BY ARCHITECT 1 201 ENTRY C -1 WD -I P -1 P -1 P -1 P -1 ACT -1 9' -6" 2 202 COATS C -1 R -1 P -1 P -1 P -1 P -1 ACT -1 9' -6" 203 CONFERENCE C -1 WD -1 10-1 P -1 P -1 P -1 ACT -1 9' -6" 2 204 OFFICE C -1 R -1 P -1 P -1 P -1 P -1 ACT -1 9' -6" 205 OFFICE C -1 R -1 P -1 P -1 P -1 P -1 ACT -1 9' -6" 206 HALL C -1 WD -1 P -1 P -1 P -1 P -1 ACT -1 9' -6" 2 20-1 HALL C -1 WD -1 P -1 P -1 P -1 P -1 ACT -1 9' -6" 2 208 LIBRARY C -1 R -1 P -1 P -1 P -1 P -1 ACT -1 9' -6" 209 OFFICE C -1 R -1 P -1 P -1 P -1 P -1 ACT -1 9' -6" 210 HALL C -1 WD -1 P -1 P -1 P -1 P -1 ACT -1 9' -6" 2 211 STORAGE C -1 R -1 P -1 P -1 P -1 P -1 ACT -1 9' -6" 212 STORAGE C -1 R -1 P -1 P -1 P -1 10-1 ACT -1 9' -6" 213 STAIR GONG R -1 P -1 P -1 P -1 P -1 214 HALL C -1 R -1 P -1 P -1 P -1 P -1 ACT -1 9' -6" 215 FILE / COPY C -1 R -1 P -1 P -1 P -1 P -1 ACT -1 9' -6" 216 IT/TELE /STOR VCT -1 R -1 P -1 P -1 P -1 P -1 ACT -1 9' -6" 21-1 BREAK ROOM VCT -1 R -1 P -1 P -1 P -1 P -1 ACT -1 9' -6" 218 WORK C -1 WD -1 P -1 P -1 P -1 P -1 ACT -1 9' -6" 2 219 OFFICE C -1 R -1 P -1 P -1 P -1 P -1 ACT -1 9' -6" 220 OFFICE C -1 R -1 P -1 P -1 P -1 P -1 ACT -1 9' -6" 221 OFFICE C -1 R -1 P -1 P -1 P -1 P -1 ACT -1 9' -6" 222 OFFICE C -1 R -1 P -1 P -1 P -1 P -1 ACT -1 9' -6" 223 HALL C -1 WD -1 P -1 P -1 P -1 I P -1 ACT -1 9' -6" 2 224 HALL EXISTING I NOTES: I. PATCH AND REPAIR FINSHES TO MATCH EXISTING 2. PROVIDE CHAIR RAIL PER DETAIL 4/Al2 80011 FINISH LEGEND NOTES: PAINT ALL WOOD SASE, HM DOOR FRAMES AND TRIM W/ P -2 DOOR SCHEDULE HARDWARE SETS 1. OFFICE SET 1 -1/2 PR BUTTS 2. PASSAGE SET 1 -1/2 PR BUTTS CLOSER 3. PASSAGE SEt 1 -1/2 PR. BUTTS 4. DUMMY SET ROLLER CATCH 1 -1/2 PR. BUTTS 5 STORE ROOM SET 1 -1/2 PR. BUTTS 11 31 -011 14211 31 -011 " 3' -011 II Ti TI Ti :1E 1. r N NOTES: HARDWARE MANUFACTURER. MATCH BUILDING STANDARD DESIGN: MATCH BUILDING STANDARD FINISH: 613 OIL RUBBED BRONZE CONTRACTOR TO PROVIDE COMPLETE SCHEDULE FOR ARCHITECT'S APPROVAL MATCH BUILDING STANDARD UNLESS NOTED HOLLOW METAL FRAME (PAINT W/ P -2) C a TEMPERED r r - GLASS TYP. e N HOLLOW METAL FRAME (PAINT W/ P -2) n — TEMPERED r T GLASS TYP. A B C D E Frame Types 1/4° -1' -0' n HOLLOW METAL FRAME (PAINT W/ P -2) - TEMPERED GLASS TYP. JOHN MOSELE ARCHITECT ARCHITECTURE PLANNING INTERIOR ARCHITECTURE 317-574-9408 DERICk REGISTERED 33389 - STATE OF \ INDIANA ? )�t� TENANT IMPROVEMENTS FOR ROBERGE & ROBERGE SUITE 201 REGENTS BUILDING 12775 HORSEFERRY CARMEL, IN 46032 rCV151on: date: description: Second Floor Plan Partial First Fl. Plan Room Finish Schedule Door Schedule date: July 15, 201 2 project: 1207 Scale: As noted coord.: JM drawn: JM A1.1 checked: JM TAG DESCRIPTION GONG EXISTING CONCRETE SLAB C -1 CARPET - SELECTED BY ARCHITECT WD -1 53/4" WOOD BASE SELECTED BY ARCHITECT (PAINT W/ P -2) R -1 4" COVE VINYL BASE - COLOR SELECTED BY ARCHITECT 10-1 SATIN PAINT -COLOR SELECTED BY ARCHITECT P -2 SEMI -GLOSS PAINT -COLOR SELECTED BY ARCHITECT ACT -1 ACOUSTICAL CEILING TILE BY USG BUILDING STANDARD MILLENNIA CLIMAPLUS 2'X2' (SLT) "16-105 PL -1 PLASTIC LAMINATE -COLOR SELECTED BY ARCHITECT PL -2 PLASTIC LAMINATE -COLOR SELECTED BY ARCHITECT NOTES: PAINT ALL WOOD SASE, HM DOOR FRAMES AND TRIM W/ P -2 DOOR SCHEDULE HARDWARE SETS 1. OFFICE SET 1 -1/2 PR BUTTS 2. PASSAGE SET 1 -1/2 PR BUTTS CLOSER 3. PASSAGE SEt 1 -1/2 PR. BUTTS 4. DUMMY SET ROLLER CATCH 1 -1/2 PR. BUTTS 5 STORE ROOM SET 1 -1/2 PR. BUTTS 11 31 -011 14211 31 -011 " 3' -011 II Ti TI Ti :1E 1. r N NOTES: HARDWARE MANUFACTURER. MATCH BUILDING STANDARD DESIGN: MATCH BUILDING STANDARD FINISH: 613 OIL RUBBED BRONZE CONTRACTOR TO PROVIDE COMPLETE SCHEDULE FOR ARCHITECT'S APPROVAL MATCH BUILDING STANDARD UNLESS NOTED HOLLOW METAL FRAME (PAINT W/ P -2) C a TEMPERED r r - GLASS TYP. e N HOLLOW METAL FRAME (PAINT W/ P -2) n — TEMPERED r T GLASS TYP. A B C D E Frame Types 1/4° -1' -0' n HOLLOW METAL FRAME (PAINT W/ P -2) - TEMPERED GLASS TYP. JOHN MOSELE ARCHITECT ARCHITECTURE PLANNING INTERIOR ARCHITECTURE 317-574-9408 DERICk REGISTERED 33389 - STATE OF \ INDIANA ? )�t� TENANT IMPROVEMENTS FOR ROBERGE & ROBERGE SUITE 201 REGENTS BUILDING 12775 HORSEFERRY CARMEL, IN 46032 rCV151on: date: description: Second Floor Plan Partial First Fl. Plan Room Finish Schedule Door Schedule date: July 15, 201 2 project: 1207 Scale: As noted coord.: JM drawn: JM A1.1 checked: JM