Loading...
HomeMy WebLinkAboutCorrespondence: Response to Carmel Soil & Water B �'r IIII I Beam, Longest Consulting Engineers ♦ Land August 28, 2012 John Thomas City of Carmel-Engineering Department 1 Civic Square Carmel, Indiana 46032 RE: Benett Technology Park, Block A Secondary Plat&Road Design Docket412050019SP Dear Mr. Thomas: This letter is in response to the Review Letter dated July 7, 2012 for the Benett Technology Park, Block A project. The following are responses to each of the review comments using a corresponding numbering system. Construction SWPPP Section: General: All storm lines and subsurface drains are now shown on Sheet C105. Once the project is approved, the contractor will submit a storm water permit application for this project prior to any work or construction on site. 6) b) Stub outs for perimeter or sump drains will not be provided to the individual lots from the roadway subsurface drains. When the outlots are developed, any subsurface drains associated with outlots will tie into the proposed storm sewers for that development. 8) The preservation area has been shown and noted on sheet C105. Orange safety fence has been specified to surround the area to protect against this area from damage or disturbance. Due to the shallow slopes of the swales, the low runoff rates and the erosion control blankets linings, it is our opinion that check dams are not necessary in this application. a) A small area during pre-construction grading drains east onto the sidewalk. To ensure that no sediment leaves the site due to staging and grading, the silt fence was shown along the entire east property line. 9) "The Contractor shall schedule and hold a pre-construction meeting with the City of Carmel Engineering Department prior to any construction activities." was added as the first step in the construction sequence on sheet C106. 10) The stockpile areas, along with the necessary controls, are now shown on sheet C105. General notes for the stockpile have also been added to sheet C105. A21 of the SWPPP has also been revised to reflect the soil stockpile. 13) c) The City of Carmel Fire Department and Engineering Department were added to the spill contacts list. 8126 Castleton Road ■ Indianapolis,Indiana 46250 ■ Phone:317.849.5832 ■ Fax: 317.841.4281 ■ Web:www.B-L-N.com Docket#12050019SP-Benett Technology Park,B1ockA Page 1 of 2 Benett Technolo2y Park,Block A—Review Response 14) Once the contractor has been selected by the developer, the appropriate contact information will be provided to the City of Carmel's Engineering Department at the pre-construction meeting. This stipulation has been added to the plans on sheet C106. Post- Construction SWPPP Section: 2) a) Per previous conversations, this location of the Aqua-Swirl is acceptable to Zionsville. We attended a Zionsville TAC meeting on August 23, 2012 and no further comments were provided at that time. A concrete pad or other entrance to the Aqua-Swirl has not been added since the Aqua-Swirl's proximity to the road should enable it to be maintained and cleaned from the roadway. 5) A signed Owner Acknowledgement Agreement is now included in the O&M Manual. All outstanding items per this section of the checklist have been addressed and added to the Owner Acknowledge Agreement and the first page of the Operation, Maintenance, and Inspection Section of the O&M Manual,under General Information. Attached are the revised construction plans, drainage report, and O&M Manual. If you have any questions or require additional information to complete your review and approval of this application,please let me know. Yours Truly, V Ashton L.Fritz,PE Project Manager Beam Longest&Neff, L.L.C. Cc: Jeremy Stephenson Nickolas Schmitt, BLN Gary Duncan, Carmel Engineering Angie Conn, Carmel Planning Lance Lantz, Town of Zionsville : 2011 110042 -- Bennell 1"ec h Roa(11)ocs 1,cwers Rey sl ons se /,cwer 1:'era lnel `oil ern �Taler,(Joc., 8126 Castleton Road ■ Indianapolis,Indiana 46250 ■ Phone:317.849.5832 ■ Fax: 317.841.4281 ■ Web:www.B-L-N.com Docket#1205 0019SP—Benett Technology Park,Block A Page 2 of 2