Loading...
HomeMy WebLinkAboutCorrespondence: Response to Carmel Engr'g B �'r IIII I Beam, Longest Consulting Engineers ♦ Land August 28, 2012 Gary R. Duncan, Jr. City of Carmel-Department of Engineering 1 Civic Square Carmel, Indiana 46032 RE: Benett Technology Park, Frontage Road Secondary Plat&Road Design Docket412050019SP Dear Mr. Duncan: This letter is in response to the Review Letter dated July 10, 2012 for the Benett Technology Park, Frontage Road Road project. The following are responses to each of the review comments using a corresponding numbering system. 1. A soils map was added to the Cover Sheet. 2. The site vicinity and location maps have been adjusted to better reflect the project's location. 3. The Design Speed(30 mph)has been added to the Cover Sheet as requested. 4. The right-of-way width of Bennett Parkway varies in the location of the proposed roadway. Please refer to the ALTA Survey and Secondary Plat for the R/W bearings. The proposed roadway is 50-feet in Carmel, and 60-feet in Zionsville. 5. The survey located on page 2 of the construction plan set has been updated. The survey produced is an ALTA. Therefore, contours are not shown on this survey and this survey has been renamed to ALTA/ACSM Land Title Survey. The topographic features that pertain to this project are shown on the Plan &Profile Sheet. 6. The overall Development Plan Sheet was added to the construction plan set (C101b) after the General Information Plan Sheet. 7. To the best of our knowledge, all easements are indicated on the plans and on the ALTA survey. It is our understanding that no onsite easements need to be vacated and the proper easements have been described on the secondary plat. 8. The construction limits have been indicated on the Development Plan, Road Plan and Profile Sheet, Storm Sewer Plan and Profile Sheets, and the Erosion Control Plan Sheet. 9. To the best of our knowledge, all utilities have been shown and marked on the plans. 10. The west right-of-way line has been shown extending to the south property line. 11. The proposed BMP is located in an existing platted drainage easement and REI Investments, Inc. will be monitoring and maintaining the BMP. Therefore, we believe that a non-exclusive access easement is not warranted. A loading pad is not being provided because of its proximity to the proposed roadway. 12. The Declaration of Covenants and Easements for Bennett Technology Park includes a section that states that all land owners must share in the detention pond maintenance. A copy of this Declaration has been attached for your reference. Please refer to Block E easement and Exhibit F-3 for the detention pond in question. There is shared maintenance language covering this area as well in Article 2, Section 2(f). 13. Comment noted. 14. An onsite flood routing exhibit has been shown on C104. 8126 Castleton Road ■ Indianapolis,Indiana 46250 ■ Phone:317.849.5832 ■ Fax: 317.841.4281 ■ Web:www.B-L-N.com Docket#1205 0019SP-Benett Technology Park,Frontage Road Page 1 of 3 Benett Technology Park,Frontage Road—Review Response 15. We have reviewed the available definition of the minimum flood protection grades (MFPG). It appears that since these outlots to not adjoin an open body of water, Special Flood Hazard Area on a FIRM,permanent swale, or detention pond a MFPG does not apply. The minimum lowest adjacent grade elevations were added to the plans, which will govern all future building elevations. 16. The off-site detention for this project is shown on the flood routing exhibit that has been added to the construction plan set on Sheet C104. 17. The temporary diversion swales are to remain in place until the lots are developed. 18. The sidewalks along the east side of the proposed roadway will be constructed when the two outlots are developed. Per the planning departments request, a note has been added to the Cover Sheet and the proposed roadway Plan & Profile Sheet stating that these must be constructed when the outlots are developed. 19. A separate plan and profile sheet was created for the storm sewer profile. This sheet was added as C103b. To our knowledge, there are no existing water & sanitary sewer crossings, and no proposed water and sewer lines are being constructed per this project. 20. The Maintenance of Traffic Plan Note was added to the notes presented on sheet C101. 21. The note "ALL PAVING IS TO BE COMPLETED IN ONE PAVING SECTION" was added to the typical roadway cross-section. 22. The ADA curb ramp detail was replaced with INDOT's detail. 23. The statement from the City of Carmel Stormwater Technical Standards Manual Section 102.02vii was added to all storm sewer plan&profile sheets and the structure tables. 24. The note on C108 was updated to reflect the maximum spacing on concrete curb control joints is 10 feet on tangents and 5 feet on radii. 25. The City's curbing policy was added to the plans on sheet C110. 26. The City's paving policy was added to the plans on sheets C110 and C111. 27. The note "NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORMWATER MANAGEMENT PERMIT"was added to all construction plans sheets. 28. The construction within the right-of-way note was added to the General Information Plan Sheet (C101) and General Specifications Sheet(C110). 29. The note "IF IT WILL BE NECESSARY TO RELOCATE EXISTING UTILITIES, THE EXPENSE OF SUCH RELOCATIONS SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. ALL UTILITY POLES SHALL BE LOCATED WITHIN ONE FOOT OF THE PROPOSED RIGHT-OF WAY."was added to the General Information Plan Sheet(C101) and General Specifications Sheet(C110). 30. To the best of our knowledge the proposed pavement section matches/exceeds the existing pavement section of Bennett Park Way. Also,when comparing the typical pavement section for local roads within Carmel versus Zionsville, Carmel's typical pavement section exceeds Zionsville's. As shown on the plans, Carmel's pavement section is what is being specified to provide a more durable roadway. The General Information, Board of Public Works & Safety, Bonding Requirements, R/W Permits and Connection Fee information have been noted. Appropriate action regarding each of these areas will be addressed upon satisfactorily addressing all outstanding design review comments. Design and Plan Modifications: The storm sewer system pipe sizes and inverts were adjusted due to the existing connection storm pipe capacity limitations. The existing 24 inch connection storm pipe's limitations are discussed in the updated Drainage Report. 8126 Castleton Road ■ Indianapolis,Indiana 46250 ■ Phone:317.849.5832 ■ Fax: 317.841.4281 ■ Web:www.B-L-N.com Docket#12050019SP—Benett Technology Park,Frontage Road Page 2 of 3 Benett Technology Park,Frontage Road—Review Response Attached are the revised construction plan set, secondary plat, recorded Declaration of Covenants & Easements and drainage report. If you have any questions or require additional information to complete your review and approval of this application,please let me know. Yours Truly, V Ashton L.Fritz,PE Project Manager Beam Longest&Neff, L.L.C. Cc: Jeremy Stephenson, Nickolas Schmitt, BLN Angie Conn, Carmel Planning Lance Lantz, Town of Zionsville Greg Ilko, Crossroad Engineers ,.: 2011 110042 - 11ennell 1"ech 1 oa(11)oc�s �Rey s1zon�se 1,cwer 1''arinel 8126 Castleton Road ■ Indianapolis,Indiana 46250 ■ Phone:317.849.5832 ■ Fax: 317.841.4281 ■ Web:www.B-L-N.com Docket#12050019SP—Benett Technology Park,Frontage Road Page 3 of 3