Carmel Stormwater Pollution Prevention Plan Review
Olive Garden
Project Name:
8/9/2012
Review Date:
John Thomas
Reviewed By:
Post - Construction SWPPP
SatisfactoryUnsatisfactory
1)Description of potential pollutant sources associated with X
proposed land use.
2)Post-construction stormwater quality measures:X
a.
X
Location
b.
X
Dimensions
c.
X
Sizing Calculations
d.
X
Detailed Specifications
e.
X
Construction Details
3)Sequence describing stormwater quality measure implementationX
Description of when the proposed post construction stormwater quality measures will be installed in relation to the
general construction sequence.
4)Stormwater quality measures to be implemented to prevent or X
minimize adverse impacts to stream and riparian habitats.
5)An operation and maintenance manual for all post-construction X
stormwater quality measures:
a.
A brief description of what a water quality BMP is and does.
b.
Contact information for the BMP owner
i.Name
ii.Address
iii.Telephone Number
iv.E-mail Address
c.
A statement that the BMP owner is responsible for all maintenance and
d.
A right-of-entry statement allowing the City of Carmel to inspect and
e.
A description of each BMP
f.
Specific actions to be taken regarding routine maintenance, remedial
maintenance, and sediment/pollutant removal:
i.Sediment/pollutant removal procedures should be explained in both
narrative and graphical forms.
ii.Guidance on routine maintenance, such as mowing, litter removal,
woody growth removal, etc.
iii.A tabular schedule should be provided listing all maintenance
activities and dates for performing these required activities
iv.Who will actually be charged with maintaining the BMPs
(maintenance staff, waste disposal company, etc.)
g.
Site Drawings Showing:
i.Locations of BMPs
ii.Locations of the access easements to maintain the BMPs
iii.Locations of the points of discharge for stormwater treated by the
BMPs
iv.Cross sections of BMP features
h.
Requirements regarding the submittal of annual inspection reports to the
City of Carmel Engineering Department.
The first report is due one year after construction is completed, with subsequent reports due each year within the
same month of the initial report. If there are any deficiencies found during the inspections, these should be
addressed. If the inspection report is not received within the month it is due, if there are deficiencies which were not
included in the report, or if any deficiencies included in the report are not addressed in a timely manner, the BMP
owner faces enforcement action from the City.
Comments
Please show the location of the Post Construction BMP and Access Easements on C2.3 in
accordance with Chapter 700 of the Technical Standards Manual.
2)
e.Please provide the backfill detail for the storm water quality unit.
Please provide and O&M manual for review.
5)