HomeMy WebLinkAboutSWPPP Post Review 8-9-12 Carmel Stormwater Pollution Prevention Plan Review Olive Garden Project Name: 8/9/2012 Review Date: John Thomas Reviewed By: Post - Construction SWPPP SatisfactoryUnsatisfactory 1)Description of potential pollutant sources associated with X proposed land use. 2)Post-construction stormwater quality measures:X a. X Location b. X Dimensions c. X Sizing Calculations d. X Detailed Specifications e. X Construction Details 3)Sequence describing stormwater quality measure implementationX Description of when the proposed post construction stormwater quality measures will be installed in relation to the general construction sequence. 4)Stormwater quality measures to be implemented to prevent or X minimize adverse impacts to stream and riparian habitats. 5)An operation and maintenance manual for all post-construction X stormwater quality measures: a. A brief description of what a water quality BMP is and does. b. Contact information for the BMP owner i.Name ii.Address iii.Telephone Number iv.E-mail Address c. A statement that the BMP owner is responsible for all maintenance and d. A right-of-entry statement allowing the City of Carmel to inspect and e. A description of each BMP f. Specific actions to be taken regarding routine maintenance, remedial maintenance, and sediment/pollutant removal: i.Sediment/pollutant removal procedures should be explained in both narrative and graphical forms. ii.Guidance on routine maintenance, such as mowing, litter removal, woody growth removal, etc. iii.A tabular schedule should be provided listing all maintenance activities and dates for performing these required activities iv.Who will actually be charged with maintaining the BMPs (maintenance staff, waste disposal company, etc.) g. Site Drawings Showing: i.Locations of BMPs ii.Locations of the access easements to maintain the BMPs iii.Locations of the points of discharge for stormwater treated by the BMPs iv.Cross sections of BMP features h. Requirements regarding the submittal of annual inspection reports to the City of Carmel Engineering Department. The first report is due one year after construction is completed, with subsequent reports due each year within the same month of the initial report. If there are any deficiencies found during the inspections, these should be addressed. If the inspection report is not received within the month it is due, if there are deficiencies which were not included in the report, or if any deficiencies included in the report are not addressed in a timely manner, the BMP owner faces enforcement action from the City. Comments Please show the location of the Post Construction BMP and Access Easements on C2.3 in accordance with Chapter 700 of the Technical Standards Manual. 2) e.Please provide the backfill detail for the storm water quality unit. Please provide and O&M manual for review. 5)