Loading...
HomeMy WebLinkAboutEnginr'g Review #2August 6,2012 iljuoilliodil111111111111111 11111111111111.• • olooholl,11111111h1110,,Ipi, JAMES BRAINARD, MAYOR Ms. Janet Reid Gerdes, Henrichson, and Associates Architecture/Development 14110 Dallas Parkway, Suite 100 Dallas, Texas 75254 RE: Olive Garden Restaurant-Project Review #2 Dear Ms. Reid: EL The City received your site development plans and response letter on July 3, 2012. We offer the following comments: 1. Previous Comment 8 of a letter dated June 15, 2012. Please confirm with the 1NDOT that the entrance to the south can be used as proposed. You will also need to work with RCI (the property owner to the south) to obtain access rights. The Department restates this comment, 2, Previous Comment 11 of a letter dated June 15, 2012. Please provide the emergency flood route from any detention facilities to the receiving system. Please also provide the on-site flood routing from all areas to the detention facility assuming all inlets plugged during a 100-yr rain event. Please indicate the on-site flood route through the site to the detention facilities. 3. Previous Comment 12 of a letter dated June 15, 2012. Please provide the MFPG and MLAG for the proposed building. The MFPG and the MLAG shall be a minimum of 2 feet above the 100 year flood elevation or the maximum water surface elevation of the flood routes. The MFPG and MLAG should be based on the overflow weir elevation or the 100-year pond elevation, whichever is greater, OR the highest surface water elevation on site (What is the highest water surface elevation on site, with all inlets plugged, before the stormwater will spill over into the pond?). Please ensure the MFPG and MLAG are correct. 4. Previous Comment 14 of a letter dated June 15, 2012. There appear to be direct discharge points proposed for areas of this property. The property should be graded to drain internally to the site, minimizing any direct discharges. There still appears to be a direct discharge from the south driveway. Is it possible to direct this stormwater back into the site? 5. Previous Comment 21.h. of a letter dated June 15, 2012. On Sheet CS6: Section 03000: Does this apply to curbing or foundations? If this applies to curbing, please include a note similar to the note on CS3 stating, "All concrete curbing materials, production, delivery, placement, curing, jointing, finishing, etc. shall be per City of Carmel Curbing Policy." 6. Please indicate the requisite drainage and BMP easements per Section 306.02 of the Stonnwater Technical Standards Manual. 7. Please label the pond elevations as: Top of Bank, 100-yr. and spillway elevation. 8. Has Clay Regional Waste District approved the detention pond locations along the sanitary sewer easements? DEPARTMENT OF ENGINEERING ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAx 317.571.2439 EMAIL engmeering@carmeLin.gov Ms. Janet Reid August 6, 2012 RE: Olive Garden Restaurant- Project Review #2 Page 2 of 2 If you have questions, please contact me at 571- 2441. Sincerely, Du Assistant c y En " eer Department of Engineering cc: Angelina Conn, Department of Community Services John Duffy, Carmel Utilities Paul Pace, Carmel Utilities Paul Arnone, Carmel Utilities Greg Hoyes, Hamilton County Surveyor's Office Greg Ilko, Crossroad Engineers, PC issvrapps\user dataV.1shared \DHILL \PROJREV 121OLGVEGARDENRESTA[JRANTREW2