September 6, 2012
Curtis d•,d, Huff
vwa rltesldolr,c
prof k"g.muwn nrl S arw64 a Hamilton County Surveyor's Office
One Hamilton County Square
AN, Stoe pelwe th Suite 188
a f,rdraau+. Noblesville" Indiana 4606,0
t"edwNr ,adzrt,al Gstrbrm.i.w
1°¢adriws„Natr d 1 rivrr�'taa�Aa�ra
,attention: Mr. Greg Hoyes
Re: Village of West Clay, Section 10010-C
Lear Mr. Hoyes:
Enclosed please find a set of Construction Plans and a revised Drainage
Report which were revised in accordance with your comment letter dated August 15,
20'12 and agency comments,.
1 We are currently working with John Thomas with the Carmel Engineering
Department for this project..
2. Noted. This project does not fall in a Carmel Wellhead Protection Zone,.
8, Noted. An outlet permit has been submitted for the Long Branch (J.W.
Brendle) Regulated Brain Watershed,
, Noted. Once completed we will submit an Engineer's Estimate and all
required bonds to your office.
8. We have added a rear yard SSp lateral on Lot 10.
6. Option 2 will be used for the pond design. All necessary details have been
updated to reflect this.
7. We have added SSD risers at the high point between Str. 410 and 416 and
also at the deflection point at Lot 7 property corner.
8. HCSC detail D-16 has been updated on Sheet 0802 as well as detail SSD-1
on Sheet 0808, Also, we have added detail SS1 -2 on Sheet 08018.
0. 1 . t.E, has been added to the plat legend.
1965 r;r-r,',d 10614,StreCA 10. Per discussions we have provided the 80' easement and have overlapped 10'
Fishers,kwfua na
46038 2505 of the L.M.A.E. This still provides 20 outside of the landscape easement...
"d 7.�R�1
Nro".44444.,+)..4;r We have specified species from the HSE approved tree list that do not have
�wa �4soe.NiNaa3 �rtli'r c:r�nr
aggressive root systems in order to avoid complications with the SS A.. We
Hamilton County Surveyor's Office
September 5, 2012
Page 2
are currently working with Daren Mindham at the City of Carmel on the final
approved Landscaping Plan.
11. We will submit a final copy of the Landscape Plan once approved by Caren
Mindham.
12, All Crossroads comments have been addressed in these revised
Construction Plans and Drainage Report.
13. Noted, Further comments may be necessary.
If you have any questions or comments regarding these revisions, please feel
free to give me a call at (3,17) 570-4841.
Very truly yours,
STOEPPELWERTH & ASSOCIATES, INC.
Brett A. Huff
Cc: Matt Lohmeyer
Angie Conn
BAII/meh
SA559601111--S I huniftonComAySurvym I loycsV-10-12.doc