Loading...
HomeMy WebLinkAboutResponse to Hamilto Co Surveyor, Hoyes 0EPPELWH,(rH & ASSOCIATES, INC, to tNe L.1l:t�1 (= C�'Nf_���IN ��1� S - I: A,ND StIt�Vt!","Yo RS David J. StopppMwerffi P esG!Cda i'.rAEID N of asiooad E nglmlUep N"^dokes$14�41 r L ano suivoyop September 6, 2012 Curtis d•,d, Huff vwa rltesldolr,c prof k"g.muwn nrl S arw64 a Hamilton County Surveyor's Office One Hamilton County Square AN, Stoe pelwe th Suite 188 a f,rdraau+. Noblesville" Indiana 4606,0 t"edwNr ,adzrt,al Gstrbrm.i.w 1°¢adriws„Natr d 1 rivrr�'taa�Aa�ra ,attention: Mr. Greg Hoyes Re: Village of West Clay, Section 10010-C Lear Mr. Hoyes: Enclosed please find a set of Construction Plans and a revised Drainage Report which were revised in accordance with your comment letter dated August 15, 20'12 and agency comments,. 1 We are currently working with John Thomas with the Carmel Engineering Department for this project.. 2. Noted. This project does not fall in a Carmel Wellhead Protection Zone,. 8, Noted. An outlet permit has been submitted for the Long Branch (J.W. Brendle) Regulated Brain Watershed, , Noted. Once completed we will submit an Engineer's Estimate and all required bonds to your office. 8. We have added a rear yard SSp lateral on Lot 10. 6. Option 2 will be used for the pond design. All necessary details have been updated to reflect this. 7. We have added SSD risers at the high point between Str. 410 and 416 and also at the deflection point at Lot 7 property corner. 8. HCSC detail D-16 has been updated on Sheet 0802 as well as detail SSD-1 on Sheet 0808, Also, we have added detail SS1 -2 on Sheet 08018. 0. 1 . t.E, has been added to the plat legend. 1965 r;r-r,',d 10614,StreCA 10. Per discussions we have provided the 80' easement and have overlapped 10' Fishers,kwfua na 46038 2505 of the L.M.A.E. This still provides 20 outside of the landscape easement... "d 7.�R�1 Nro".44444.,+)..4;r We have specified species from the HSE approved tree list that do not have �wa �4soe.NiNaa3 �rtli'r c:r�nr aggressive root systems in order to avoid complications with the SS A.. We Hamilton County Surveyor's Office September 5, 2012 Page 2 are currently working with Daren Mindham at the City of Carmel on the final approved Landscaping Plan. 11. We will submit a final copy of the Landscape Plan once approved by Caren Mindham. 12, All Crossroads comments have been addressed in these revised Construction Plans and Drainage Report. 13. Noted, Further comments may be necessary. If you have any questions or comments regarding these revisions, please feel free to give me a call at (3,17) 570-4841. Very truly yours, STOEPPELWERTH & ASSOCIATES, INC. Brett A. Huff Cc: Matt Lohmeyer Angie Conn BAII/meh SA559601111--S I huniftonComAySurvym I loycsV-10-12.doc