HomeMy WebLinkAboutResponse to Engr'g, Thomas STOEPPELWERTH & ASS ',,txr. S, INC
September 8, 2012
David J.Stootapelw girth
I'Fe sdell,CEO City of Carmel
tvnua#r mr f
tui.k
L S a u�i
Lana Department of Engineering
1'rratica�ti,rr,�airlV
One Civic Square
Curtis c, a-ta,ffp Carmel, Indiana 460
Oca�l le!-t<drnt,GOO
f'aaafe; 4�:7ri it N.:wrrtl�S�,artrw,,aaa
Attention: I"+,°Ir, ,John Thomas
R.M.Stoeppelwerth
ro.aode Re: Village of"WestClay, Section 1001Og-C
b aaa3le 4 tits"rra ar Y iaapiut�:m.0
I'rnYe.aa^.zs�ru uC i MaataG;�da¢vCpri'^s
Dear Mr. Thomas:
Enclosed please find a set of Construction Plans which were revised in
accordance with your letter dated August 81, 201,2, Those comments were
addressed as follows:
CONSTRUCTION SWPP '
1. General
We have provided the volume that need's to be treated by each water
quality unit and the associated unit and is sized based on the Indianapolis
approved treatment rates for the unit.
. Temporary Lake#2 has been revised to a fully constructed lake. We
have indicated on the plans the planting plan and protection signage
locations and details for a 8' mesic seed mix to be seeded around the
perimeter of the pond above normal pool. We have listed all B Ps in this
section on Sheet C808.
a, The location of the Water Quality unit on the outlet of Lake#2 was
not moved due to maintenance purposes. We have placed this
unlit within 18 feet of the future back of curb. This seems to be the
best location rather than providing a lengthy access easement and
drive path to the rear of the lots and common area..
b. See response# . We no longer are proposing a temporary lake.
c. Both Lake 1 and Lake 2 now meet the 8ft deep minimum and are
V2 acre in size,
d, The Construction details for each type of water quality unit has
been provided on the plans. See Sheet C808.
8.
c. The C & M manual comments will be updated and provided to you
under a separate submittal as soon as they are completed.
Please expect these within a few days of this submittal of the
Construction Plans,
e, See above
1'196 r B.:w A I Nth Sfi eea
lm iarwri iii, See above
06038 505 g See above
3 t 849 5935 I I. See above
s : , aa,, dFp ii. See above
��+awa�^.��tco-���f�a�Iw^orce��w a,warai i
iv. See above
Carmel Engineering
August 5, 2012
Page 2
POST CONSTRUCTION SWPPP
General
1. We will need to discuss,the water resource study. I will contact you to
discuss, The construction limits and silt fence have been reestablished
on the plans, Spot elevations along 126t"� Street and at the intersection of
Hayne Street and Featherbell have been rnade clear.
6, The location of Soil Map has been referenced correctly.
b, There should be no issues with the existing soil conditions. This
note has been revised on the plans.
8. The construction limits and silt fence locations have been made more
clear, The location of the Tree Protection Areas on Sheets 0300-C301
have been labeled and the locations have been called out on Sheet
C302,
a. The silt fence turned upslope into the site on termination ends
and/or where it rneets the construction entrance has been shown
on the plans, Inlet protection has been added on existing inlets on
Sheet C300. The tree conservation areas have been revised so
that the construction staging area is not in conflict. Inlet protection
along the western perimeter swale is on top of the inlets.
b. A detail for the Rock Horseshoe Dam has been provided.
9, The HOA transfer note has been added to the end of the construction
sequence and the mulching note has been added to the permanent
seeding legend.
11. Outlet scour protection at the ends of Structures 416, 432 and 425 have
been shown on Sheets C300-C301 and all locations of scour protection,
on Sheet C302.
If you have any questions or comments regarding these revisions, please feel
free to give me a call at (317) 570-4841.
Very truly yours,
STOEPPELWERTH ASSOCIATES, INC,
411
Brett A. Huff
Cc: Matt Lohrneyer
Angie Conn
IC I/meb