Loading...
HomeMy WebLinkAboutResponse to Engr'g, Thomas STOEPPELWERTH & ASS ',,txr. S, INC September 8, 2012 David J.Stootapelw girth I'Fe sdell,CEO City of Carmel tvnua#r mr f tui.k L S a u�i Lana Department of Engineering 1'rratica�ti,rr,�airlV One Civic Square Curtis c, a-ta,ffp Carmel, Indiana 460 Oca�l le!-t<drnt,GOO f'aaafe; 4�:7ri it N.:wrrtl�S�,artrw,,aaa Attention: I"+,°Ir, ,John Thomas R.M.Stoeppelwerth ro.aode Re: Village of"WestClay, Section 1001Og-C b aaa3le 4 tits"rra ar Y iaapiut�:m.0 I'rnYe.aa^.zs�ru uC i MaataG;�da¢vCpri'^s Dear Mr. Thomas: Enclosed please find a set of Construction Plans which were revised in accordance with your letter dated August 81, 201,2, Those comments were addressed as follows: CONSTRUCTION SWPP ' 1. General We have provided the volume that need's to be treated by each water quality unit and the associated unit and is sized based on the Indianapolis approved treatment rates for the unit. . Temporary Lake#2 has been revised to a fully constructed lake. We have indicated on the plans the planting plan and protection signage locations and details for a 8' mesic seed mix to be seeded around the perimeter of the pond above normal pool. We have listed all B Ps in this section on Sheet C808. a, The location of the Water Quality unit on the outlet of Lake#2 was not moved due to maintenance purposes. We have placed this unlit within 18 feet of the future back of curb. This seems to be the best location rather than providing a lengthy access easement and drive path to the rear of the lots and common area.. b. See response# . We no longer are proposing a temporary lake. c. Both Lake 1 and Lake 2 now meet the 8ft deep minimum and are V2 acre in size, d, The Construction details for each type of water quality unit has been provided on the plans. See Sheet C808. 8. c. The C & M manual comments will be updated and provided to you under a separate submittal as soon as they are completed. Please expect these within a few days of this submittal of the Construction Plans, e, See above 1'196 r B.:w A I Nth Sfi eea lm iarwri iii, See above 06038 505 g See above 3 t 849 5935 I I. See above s : , aa,, dFp ii. See above ��+awa�^.��tco-���f�a�Iw^orce��w a,warai i iv. See above Carmel Engineering August 5, 2012 Page 2 POST CONSTRUCTION SWPPP General 1. We will need to discuss,the water resource study. I will contact you to discuss, The construction limits and silt fence have been reestablished on the plans, Spot elevations along 126t"� Street and at the intersection of Hayne Street and Featherbell have been rnade clear. 6, The location of Soil Map has been referenced correctly. b, There should be no issues with the existing soil conditions. This note has been revised on the plans. 8. The construction limits and silt fence locations have been made more clear, The location of the Tree Protection Areas on Sheets 0300-C301 have been labeled and the locations have been called out on Sheet C302, a. The silt fence turned upslope into the site on termination ends and/or where it rneets the construction entrance has been shown on the plans, Inlet protection has been added on existing inlets on Sheet C300. The tree conservation areas have been revised so that the construction staging area is not in conflict. Inlet protection along the western perimeter swale is on top of the inlets. b. A detail for the Rock Horseshoe Dam has been provided. 9, The HOA transfer note has been added to the end of the construction sequence and the mulching note has been added to the permanent seeding legend. 11. Outlet scour protection at the ends of Structures 416, 432 and 425 have been shown on Sheets C300-C301 and all locations of scour protection, on Sheet C302. If you have any questions or comments regarding these revisions, please feel free to give me a call at (317) 570-4841. Very truly yours, STOEPPELWERTH ASSOCIATES, INC, 411 Brett A. Huff Cc: Matt Lohrneyer Angie Conn IC I/meb I Roponse Ldwrs,7-25-