HomeMy WebLinkAbout0861.98.141-0s
(TYP.)
FIRST OM REPAIR RM
1) REMOVE AND REPLACE, ALL WATER DAMAGED WALL FINISHES.
2) REMOVE AND REPLACE ALL FLOOR FINISHES DAMAGED.
3) CLEAN AND SEAL ALL WOW FRAMING TO REMAIN.
4) REPLACE. IN—KIND, ALL ELECTRICAL FIXTURES AND WIRING THAT
HAS BEEN DAMAGED. NAT TEST ALL WIRING.
5) CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS PRIOR
TO CONDUCTING WORK.
22'-4�
GROOMING
/2/6
FOOD PREP.
129—On
GROOMING
4 Tt A A A td-
BOARDING
RECEPTION
11' -9i"
310
CAT BOARDING'C.4
8
0.� A