Loading...
HomeMy WebLinkAbout0073.95.1O LEAD WALL PAST OVER DIG f� DRAWL 5PA6E� SEE DETAILS PER SPED 24° H x 60° WIDE CRAWL ACCE55 2-2x4 P05T 2 -2x10 HDR o I I 2x10 FLOOR J015TS 16° O.G. over I II I � I I ti II LEAD WALL PAST OVER DIG L- - - -- 5UNROOM OPTION 1/411 _ 11 -011 d' h' n, N un 1k1 -On 181-111 61.311 ]-All — L — 1 I I II II II II ---,-,--DOUBLE J5T.5 w I I UNDER FIRE- o I I PLACE m o 1 II Il 301 -011 I I Br I 0 1111 o O �C--- z 0_ I mo oLi ' J i l l 3 �~ I o� I O O o °O o �w 111 w Oo vo I __3 o w PG 130° x 30° x 12° GONG. PAD FOOTIN I I I I 1' pG o -° u o w 1 0 0 uj I I W/ 3° PIA 5TL. COL. CENTEREQI I I I I N N p I 11 I I I I I I II o I I I _ 8 -4 0 81.611 131 -211 1101 11 BLEEDER � � I I — - I - - W8x24 57L M. 7qj —^ — TYP BEAM POCKET - _J POINT LOAD L 1120 LEAD WALL PAST 6" D ° WIDE, m FROM ABOVE o POIN LOAD OVER IG 5 DEEP FROM ABOVE — 18° HIGH N 8 u _ > o - POURED GONG WAL o v PG POINT LOAD o w - W/ 5x12 BRICK LEDGE ° FROM ABOVE B -0 1 POINT LOAD POURED HT ON ° X FROM ABOVE N I - 811 x 2011 GOVT. SPREAD N N FOOTING N F -1 W8x18 5TL BM. W8x18 5TL BM. =04 =MNO.Mma em won", .4- 1 4111111111111 a UNEXGAVATED w8x28 5TL BM. - I L I W8x18 STL BM. 4° GONG. SLAB ON MIN I M 111-8 1/2" 71 151311 151"011 411 COMP. 5AN12 FILL I I - - POINT LOAD POINT LOAD FROM ABOVE FROM ABOVE 13 � mo o _ USE STAIR WALL A5 11 - - -1j 1 I O C-1 DA5EMENT ' PG '0 'o w F BEARING WALL - Z 411 GONG. 5LA13 ON MIN II _ - o v < ° = ON 5LA I --�- �0 3 1 0 411 COMP. STONE FILL O O W tf) - o° o I I TO ABOVE 9 4 1 u� 17- B 5 5E STAIR WALL AS N m BEARING WALL 6 I 10 -9 II ON SLAB 161-1011 a 1118 i /2° 1102 BLEEDER W8x21 5TL BM. W8x18 5TL BM. - - — POINT LOAD 3 P FROM ABOVE o a_ 1— LT) C Lo L U) >_ w 1 I I I 141- FOUNPAT ION PLAN 1/411 : 11 -011 NOTE: 50ME COLUMN DIME11510N5 ARE FROM CENTER OF COLUMN TO EXTERIOR FILE OF BASEMENT WALL. SUMP z 3 w� ~ N cr> - N X � N �Tl � BLEEDER ° NOTE: ERRORS AND 0Y115510N5 WHICH MAY OCCUR IN THE CONTRACT 21411 u-> OOGUMENT5 SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT, IN WRITIN6, AND WRITTEN INSTRUCTION SHALL Cc O �L BE OBTAINED PRIOR TO PROCEEDING WITH CONSTRUCTION. II C) PL THE CONTRACTOR 54ALL BE HELD RESPONSIBLE FOR ANY of p o - -O-6 ERRORS, D15GREP;NCIE5 OR OMISSIONS FOR WHICH THE � CONTRACTOR FAILED TO NOTIFY THE ARCHITECT PRIOR I I TO CONSTRUCTION AND /OR FABRICATION OF THE WORK. N c� III p 111 Cil N °o v, W u c, � cil m M o - O 'J SUMP z 3 w� ~ N cr> - N X � N �Tl � BLEEDER SEE ELEVATIONS FOR FOUNDATION LAYOUT IN THIS AREA. I I I I - I I I I 4 REBAR 0 24° O.G., 7' LONG TO SPAN OVER-P16 I I 1 120 UNEXGAVATEP 4° GONG. 5LAB ON MIN 411 COMP. 5AND FILL 1/21, 221 -811 1120 21 -411 LEAD WALL PAST OVER DIG = m - N v �o N cn nor �h%nN o - or- c Q Z 0 o 0 z d d Field verify all dimensions DO NOT SCALE DRAWINGS! /i\ i . _I_i Irmo a___ ­4 ° ON u-> Cc O �L III II C) PL O of p o - -O-6 � o I I c� III p 111 II J °o v, W c, o - O N Z_ N 3 OVER DIG I �o w w� N N N X LEAD WALL PAST \ N � WATER AND SEWER o M ENTRANCE LOCATION w uj SEE ELEVATIONS FOR FOUNDATION LAYOUT IN THIS AREA. I I I I - I I I I 4 REBAR 0 24° O.G., 7' LONG TO SPAN OVER-P16 I I 1 120 UNEXGAVATEP 4° GONG. 5LAB ON MIN 411 COMP. 5AND FILL 1/21, 221 -811 1120 21 -411 LEAD WALL PAST OVER DIG = m - N v �o N cn nor �h%nN o - or- c Q Z 0 o 0 z d d Field verify all dimensions DO NOT SCALE DRAWINGS! /i\ i . _I_i Irmo a___ ­4 ° Cc O III III II C) PL p o - -O-6 I I c� III p 111 II J I rn W c, 00 LEAD WALL PAST)I N IIOI BLEEDER OVER DIG I N LEAD WALL PAST WATER AND SEWER o OVER DI ENTRANCE LOCATION w uj NOTE: m m o PROVIDE (2) 14 REBAR, TEN FT. LONG TO SPAN UTILITY TRENCH 161 811 61 -411 1. 161 -3 1/211 SEE ELEVATIONS FOR FOUNDATION LAYOUT IN THIS AREA. I I I I - I I I I 4 REBAR 0 24° O.G., 7' LONG TO SPAN OVER-P16 I I 1 120 UNEXGAVATEP 4° GONG. 5LAB ON MIN 411 COMP. 5AND FILL 1/21, 221 -811 1120 21 -411 LEAD WALL PAST OVER DIG = m - N v �o N cn nor �h%nN o - or- c Q Z 0 o 0 z d d Field verify all dimensions DO NOT SCALE DRAWINGS! /i\ i . _I_i Irmo a___ ­4