HomeMy WebLinkAbout0298.95.28SUPERVISOR W O R K S H E E T
FOUNDATION CHECKLIST
BASEMENT
PROJECT INFORMATION
HOUSE NAME / ELEV.
SET NUMBER
PLAN / JOB NUMBER
STANDARD OR REVERSED
ANY NON -STD. CHANGES?
FRONT OR SIDE LOAD
STD., ENLARGED, OR FULL BSMT.
(IN SET •) (OPT. 293) (OPT. 295)
ALL SIDING OR BRICK FRONT
(IN SET ") (OPT. 490)
BSMT. WINDOW OPT. QTY.
(MARK LOCATIONS) ON PRINT
FIREPLACE OPT.
NOTE: INSTALL BRICK LEDGE ON MASONRY FIREPLACES
BUILDING PERMIT NUMBER
I
CHECKLIST
MASONRY
PRE -FAB
SUMP PUMP LOCATION MARKED
SUMP PUMP SLEEVE LOCATION MARKED
- - - -_ _ -- MARK OUT ALL ►4AUNCHES NOT USED
MARK IN FRONT PORC+ -+ WALL iF NOT ON PRINTS
SEWER AND WATER SLEEVE LOCATIONS MARKED
(3' W/ 4" SEWER COUPLER, 5'W/ 1 1/2" SLEEVE)
HIGHLIGHT ALL BEAM POCKETS
H-41C IGHT ALL PAD FOOTING LOCATIONS
SLAB
PROJECT INFORMATION
HOUSE NAME / ELEV.
[ i ^ tom: .1
STANDARD OR REVERSED
ANY NON -STD. CHANGES?
FRONT OR SIDE LOAD
ALL SIDING OR BRICK FRONT
iN SET 01 (OPT, 490
FIREPLACE OPT.
NOTE: ' NSTALL BRICK LEDGE ON MASONRY F`x2E1'L,�CES
BUILDING PERMIT NUMBER
MASONRY
PRE -FAB
CHECKLIST
OUT AL,. "A.:NCHE5 NO' _&I D
"!ARC 'N FRONT F'OR� :r+ ,4A+ LS +F NOT ON PRINTS
�Lo4'ER 5LEE VE LGG�; "'ON M.RCED
ALL '++GKFNED SLAB FOOTINGS
Ai..- PAD FOOTING _0GATiON5
DO NOT REMOVE BLUEPRINTS FROM JOBSITE
1.
EXCAVATOR PLACE PRINT TUBE
INSIDE
OF EXCAVATION.
2.
WALL CONTRACTOR LEAVE ON
TOP OF
WALL.
III �
FRAME PUNCH -OUT CHECK LIST
1. GARAGE
GARAGE DOOR OPENING FRAMED TO CORRECT SIZE: 71' HT,, 8' OR I6' WIDE.
GARAGE ATTIC ACCESS FRAMED TO CORRECT 51ZE AND LOCATION.
NAILERS AT ALL CORNERS OF GARAGE AND CEILING.
_zARAGE STEP FRAMED AND KICK PLATE UNDER DOOR
BOW STUDS
STRAP ANCHOR NAILED CORRECTLY
LUMBER RACK BUILT t EXTRA MATERIAL STACKED ON
2. HOUSE
CHECK FOR BOW STUDS
GHECK FOR NAILERS
MARK DOOR SWING DIRECTION AND SIZE
CHECK FOR CASING ROOM (MIN. 2" ON EACH SIDE)
CHECK. CENTERLINE OF KITCHEN WINDOW
CHECK BULKHEAD DIMENSIONS
CHECK WALL SIZES IN REL ATiON TO CABINET SPACE
G«iECK VANIT`' SIZES IN RELATION TO IUALL SPACE
CHECK vANITY DEPTH TO DOOR OPENING (MIN. 24 1/2 ")
CHECK DOOR OPERATION AND INSTALLATION
--- - - - - -- CHECK WINDOW OPERATION AND INSTALLATION
C+4ECK BASEMENT STAIR AND 2nd FLOOR STAIR INSTALLATION
PITCH RAIL WALL INSTALLED 142'; BELOW STRINGER
►- +ALF- ;L,41_L 42" FROM FLOOR AND SAME PITCH AS STAIRS (BOTH STAIRWAYS)
�4ALF -WALL AT STAIRS PAST STRINGER 1 1/2"
TUB PLATFORM BUILT CORRECTLY" 16 ir," HT., 39'' X 51" INSIDE
-- - - -___ NO 5TJD5 * 24" O.G. AT GERAM'G AREAS. (16" O.G. MAX.)
TUB BLOCKS INSTALLED AT CERAMIC AREAS.
NAILERS FOR PIBERGLA55 TUBS INSTALLED
MEASURE ' ✓INYL AREAS FOR SQUARE
CB PANELS HAVE BLOCKS ON ENDS
GNEGK FOR LOAD- BEAR!NG POINTS IN HOUSE AND PROPER LOAD TRANSFER
STRAP ANCHORS SECURED IN µOUSE
---- - - - - -- CRAWL SPACE AND BASEMEN' CLEANED OUT
--- - - - - -- STAIRWAY SHIMMED (MAX. 1/2" GAP EACH 51DE)
!at AND 2na FLOORS LINE UP 'N S?A!R W1=-LL
NO GAPS ABOVE STAIRWAY DRAFT5TOP
5T,41RWAY DROP CEILING DONE CORRECTLY (CHECK PRINTS)
RISER INSTALLED AT TOP BASEMENT STEP
HANDRAIL BLOCKS INSTALLED 32'` FROM' STAIR NOSING
SAFETY BOOTS AND RAILS INSTALLED
STRONGBACK IN FLOOR TRU55E5 BLOCKED AND NAILED TIGHT
FLOOR SHEATHING NAILED PER SPEC.'b
FALL PROTECTION INSTALLED A* STAIR WALL OPENINGS
EYEBOLT AND ANGHOR POINT IN PLACE
ALL DRAFT STOP INSTALLED ON CHASE AND BAND JOISTS
ALL TY VECK STAPLED IN -PLACE EXTERIOR
ALL +40LE6 PATCHED IN INSULATION BOARD
ALL TRIM INSTALLED PER PRINT
3 1/2" RIP5 1/2 SHEATHING INSTALLED ON CORNERS
ALL WINDOWS TAPED ON TOP AND GLUED ON FOUR SIDES
ALL DOORS 'APED ABOVE
PRINT HUNG ON NAIL IN GARAGE
PERIMETER AND PANELS GLUED
INTERIOR WALLS GLUED DOWN
INTERIOR AND EXTERIOR WALLS NAILED INTO TRUSSES BELOW
SE' TUBS INTO ROOM AND WIPE -OUT
ATTIC ACCESS iNSTALLED IN HOUSE PER PRINT, 12" 51DES
ALL WINDOWS iNSTALLED PER PRINT, ELEVATION AND STACK
_____ 3/4" BLOCK UNDER CENTER OF DOUBLE WINDOWS