Loading...
HomeMy WebLinkAbout1040.95.3NOTE: SILL PLATE TO BE FLUSH R -13 BATT INSULATION WITH CRAWL SIDE OF W/ 2 MIL. VAPOR BARRIER FOUNDATION WALL (2) RISER AT 7 -3/4' EACH (1) 9' TREAD 4' CONC. SLAB ON GRADE SLOPE 2' TO DOOR j v , L v 1 L v L _0 v _0 v vv 0 o0 o0 o0 00 00 0 00 00 00 00 00 00 6'-8' MIN. 0, o GRANULAR FILL °0 0 0 O• 0 op o• o• o• o• v A v\ d \ d \ p V\ V p\ bo v 1'-4- FOUNDATION WALL at GARAGE REAR FOUNDATION WALL at PORCH -BRICK 3/4' FLOOR DECKING SEE FLOOR FRAMING PLAN FOR JOIST LAYOUT 2x4 TREATED PLATE TYPICAL FOUNDATION WALL: x 8' CAP BLOCK x (3) 8' LINE BLOCK x SILL ANCHOR BOLTS a 6'-0* O.C. x 16'x8' CONCRETE FOOTING PERIMETER INSULATION DOWN TO GRANULAR FILL 4' MIN. GRANULAR FILL UNDER 6 MIL. VISOUEEN VAPOR BARRIER 4' CONC. SLAB ON GRADE W/ THICKENED EDGE 1 1/2' TYPICAL FOtNNDATIO WALL: x 4' CAP BLOCK x (4) 8' LINE BLOCK x 16'x8" CONCRETE FOOTING \I-Il' MIN. GRANULAR Flll CRAWL FOUNDATIONS det.estF46 CRAWL and PART'L BASEMENT FOUNDATIONS PROVIDE TREATED NOTE: OFFSET FACE OF STUD 112' R-13 BATT INSULATION IV/ BAND BOARD AT FROM FACE OF FOUND. WALL 2 MIL. VAPOR BARRIER CONCRETE SLAB AREA 3/4' RIGID INSULATION 3/4' RIGID INSULATION 4' CONC. SLAB ON GRADE SLOPE 1/8' PER FOOT BRICK VENEER 112* EXPANSION MATERIAL cu 3/4' FLOOR DECKING W /THICKENED EDGE 4�0 SLOPE 1/8' PER FOOT SEE FLOOR FRAMING CD PLAN FOR JOIST LAYOUT \ v \ v a d v a p a d p \ d \ a p\ p a\ a p\ p a d \ 00 00 v 00 00 V \ 2x4 TREATED PLATE d, a o0 00 0 0 °0 \ d 00 00 °0 °p °p TYPICAL FOUNDATION WALL: 00 00 0 °0 x 8' CAP BLOCK o • o • ° ° o • ° o0 °0 x (3) 8' LINE BLOCK °° 00 00 °° 00 • °° ° ° °° °0 x SILL ANCHOR BOLTS a 6'-0" 0. C. 00 V, L , d r d p °0 x 16'x8' CONCRETE FOOTING o0 PERIMETER INSULATION o0 PERIMETER INSULATION 00 ° 00 DOWN TO GRANULAR FILL o • ° o • ° ° 2x4 TREATED DOWN TO GRANULAR FILL 4' MIN. GRANULAR FILL \ \ V \ \ e d \ v \ d • \ a \ a \ a p P p v .1 \ v \ , d ' L , UNDER 6 MIL. VISOUEEN °0 °0 o0 °0 °0 °0 ° VAPOR BARRIER 1' -4' WOOD PLATE FOUNDATION WALL at PORCH -BRICK 3/4' FLOOR DECKING SEE FLOOR FRAMING PLAN FOR JOIST LAYOUT 2x4 TREATED PLATE TYPICAL FOUNDATION WALL: x 8' CAP BLOCK x (3) 8' LINE BLOCK x SILL ANCHOR BOLTS a 6'-0* O.C. x 16'x8' CONCRETE FOOTING PERIMETER INSULATION DOWN TO GRANULAR FILL 4' MIN. GRANULAR FILL UNDER 6 MIL. VISOUEEN VAPOR BARRIER 4' CONC. SLAB ON GRADE W/ THICKENED EDGE 1 1/2' TYPICAL FOtNNDATIO WALL: x 4' CAP BLOCK x (4) 8' LINE BLOCK x 16'x8" CONCRETE FOOTING \I-Il' MIN. GRANULAR Flll CRAWL FOUNDATIONS det.estF46 PART'L and FULL BASEMENT FOLIATIONS det.estF48 det.estF35 NOTE: OFFSET FACE OF STUD I12' FROM FACE OF FOUND. WALL R -13 BATT INSULATION W/ 2 MIL. VAPOR BARRIER DRYWALL 3/4' DECKING SEE-FLOOR FRAMING PLAN FOR JOIST LAYOUT 8' POURED CONC. WALL 3/4' RIGID INSULATION SIDING Ix WOOD BAND BOARD W/ ALUM. DRIP CAP (SEE ELEV.) 2x4 TREATED SILL PLATE ANCHOR BOLTS AT 6' -0' O.C. FLOOR SYSTEM at FOUNDATION WALL - SIDING PART'L and FULL BASEMENT FOUNDATIONS NOTE: OFFSET FACE OF STUD 112' FROM FACE OF FOUND. WALL 3/4' FLOOR DECKING , SEE FLOOR FRAMING PLAN FOR JOIST LAYOUT 2x4 TREATED d v PLATE a ° o TYPICAL FOUNDATION WALL: j ° x 8' POURED CONCRETE WALL ° OVERDIG x SILL ANCHOR BOLTS a 6' -0' O.C. �_ _jyl x 16'x8' CONCRETE FOOTIN J 4' CONCRETE SLAB ON GRADE a J W/ 6 MIL. VAPOR BARRIER i , V , 0 00 °0 °0 O0 o0 o0 O0 r L , r L a d a\ a d a °, 0 00 °0 °0 4' MIN. 1 d V Q ,.- GRANULAR FILL* °° °° °° O• O• 00 00 00 d v a r a 00 00 00 L °0 00 L Q L D o A d O O 4' DRAIN TILE 5' -0" FOUNDATION WALL of HOUSE - SIDING PART'L and FULL BASEMENT FOUNDATIONS det.estF38 NOTE: OFFSET FACE OF STUD 112' FROM FACE OF FOUND. WALL 2x4 TREATED PLATE r SLOPE 2* 2' TO DOOR me 4' CONC. SLAB ON GRADE a t a p , � ° , � ° V v 0 0 0 0 0 0 00 00 O0 00 O0 00 6' -8' MIN. °0 ° °0 °0 °0 °0 GRANULAR FILL °° °° 00 o• ° 00 °0 0 0 o• o• o• v v d \ d ° \ d \ a v ° v ° \ o vx< 1' -4' FOUNDATION WALL of GARAGE REAR CRAWL and BASEMENT FOUNDATIONS R -13 BATT INSULATION W/ 2 MIL. VAPOR BARRIER 3/4' RIGID INSULATION NOTE: OFFSET FACE OF STUD 112' FROM FACE OF FOUND. WALL SIDING GRADE lx BAND BOARD W/ 112' DRYWALL DRIP EDGE '.�% (SEE ELEV. ) 2x4 TREATED cn SILL PLATE a 4' CONC. SLAB ON GRADE GRANULAR FILL 3/4' FLOOR DECKING, SEE FLOOR FRAMING PLAN FOR JOIST LAYOUT (2) RISER AT 7 -3/4' EACH (1) 9' TREAD PERIMETER INSULATION DOWN TO GRANULAR FILL TYPICAL FOUNDATION WALL: x 8' CAP BLOCK x (3) 8' LINE BLOCK x SILL ANCHOR BOLTS a 6' -0' O.C. x 16'x8' CONCRETE FOOTING 4' MIN. GRANULAR FILL UNDER 6 MIL. VISOUEEN VAPOR BARRIER det.estF28 SIDING 112' INSULATION SHEATHING TYPICAL FOUNDATION WALL: x 8' CAP BLOCK x (3) 8' LINE BLOCK x SILL ANCHOR BOLTS a 6' -0' O.C. x 16'x8' CONCRETE FOOTING GRANULAR FILL OVERDIG TO 12' ABOVE p p V p v p TOP OF FOOTING , 00 , 00 00 , °0 °0 00 %0* 00 °0 00 00 4' DRAIN TILE °0 e 00 Oo 00 v a d ° d v \ d \ v v ° v ° \ a v det.estF31 SIDING PROVIDE TREATED R -13 BATT INSULATION NOTE: OFFSET FACE OF STUD 112" BAND BOARD AT V/ 2 MIL. VAPOR BARRIER FROM FACE OF FOUND. WALL CONCRETE SLAB AREA NOTE: OFFSET FACE OF STUD 112' FROM FACE OF FOUND. WALL 3/4' RIGID INSULATION 4' CONC. SLAB ON GRADE SLOPE 1/8' PER FOOT o cu 3/4' FLOOR DECKING W /THICKENED EDGE 4�0 SEE FLOOR FRAMING SEE .FLOOR FRAMING ° p ° \ V p \ p ° \ 0 4 ° 4 4 ° ° 4 FOR JOIST LAYOUT \ \ ° 00 00 00 00 00 O0 V, L , d r d p L, L d Q d d v\ d r i d v d p\ d p\ p ° v PERIMETER INSULATION 00 00 0 00 00 00 00 ° O ° ° ° ° V 2x4 TREATED DOWN TO GRANULAR FILL 1 112' °0 °0 °0 °0 °0 o0 °0 °0 °0 ° p \ d. WOOD PLATE °. 0 °o 0 a °. °• °e °e 0 0 0 0 0 00 o p v\ TYPICAL FOUNDATION WALL: o e ° °0 °° o 00 °° o . o 0 0 °° 00 °° 00 °° °0 °° 00 0 °° o0 ° ° v o o TYPICAL FOUNDATION WALL: TYPICAL FOUNDATION WALL: x 4' CAP BLOCK °0 °0 00 °0 °0 °0 °0 °0 ° ° a �- x 8' POURED CONCRETE WALL x (4) 8' LINE BLOCK °0 °° °0 °0 °0 °0 °0 0 ° L x SILL ANCHOR BOLTS a 6' -0' O.C. x 16'X8' CONCRETE FOOTING o• ° ° e o• 00-0000 • ° 0• o ° a x 16'X8' CONCRETE FOOTING o ° 0 °0 0 °0 o p v a t x 16'x8' CON CRETE FOOTING 00 v ° \ d 3 • 4' CONC. SLAB ON GRADE GRANULAR FILL TO pp 0. I' -1l' MIN. o O o O o a�\ W/ 6 MIL. VAPOR BARRIER 12' ABOVE TON' OF a \ , \ 4' MIN. GRANULAR FILL GRANULAR FILL d ° ° \ d a ° V a ° ° ° v \ CONCRETE FOOTING d p L J d ° L 0o \ \ ° ° • 4' DRAIN TILE VAPOR BARR I ER p ° \ °o Oo °e °o °o 00. O O O v \ O O O 0 0 0 O 0 p vp 4' GRANULAR FILL 4' DRAIN TILE 00 00 00 00 °0" 00 00 00 0. V\ d IV \ 00 00 00 00 00 ' \ v a \ ° x'_ \ ° ► v \ °. 0. °. 0 0 0, O v � \ o 0 0 0 0 o O . 0 0 . L. d , v \ e 0 00 O 0 og 00* FOUNDATION WALL at PORCH = SIDING PART'L and FULL BASEMENT FOLIATIONS det.estF48 det.estF35 NOTE: OFFSET FACE OF STUD I12' FROM FACE OF FOUND. WALL R -13 BATT INSULATION W/ 2 MIL. VAPOR BARRIER DRYWALL 3/4' DECKING SEE-FLOOR FRAMING PLAN FOR JOIST LAYOUT 8' POURED CONC. WALL 3/4' RIGID INSULATION SIDING Ix WOOD BAND BOARD W/ ALUM. DRIP CAP (SEE ELEV.) 2x4 TREATED SILL PLATE ANCHOR BOLTS AT 6' -0' O.C. FLOOR SYSTEM at FOUNDATION WALL - SIDING PART'L and FULL BASEMENT FOUNDATIONS NOTE: OFFSET FACE OF STUD 112' FROM FACE OF FOUND. WALL 3/4' FLOOR DECKING , SEE FLOOR FRAMING PLAN FOR JOIST LAYOUT 2x4 TREATED d v PLATE a ° o TYPICAL FOUNDATION WALL: j ° x 8' POURED CONCRETE WALL ° OVERDIG x SILL ANCHOR BOLTS a 6' -0' O.C. �_ _jyl x 16'x8' CONCRETE FOOTIN J 4' CONCRETE SLAB ON GRADE a J W/ 6 MIL. VAPOR BARRIER i , V , 0 00 °0 °0 O0 o0 o0 O0 r L , r L a d a\ a d a °, 0 00 °0 °0 4' MIN. 1 d V Q ,.- GRANULAR FILL* °° °° °° O• O• 00 00 00 d v a r a 00 00 00 L °0 00 L Q L D o A d O O 4' DRAIN TILE 5' -0" FOUNDATION WALL of HOUSE - SIDING PART'L and FULL BASEMENT FOUNDATIONS det.estF38 NOTE: OFFSET FACE OF STUD 112' FROM FACE OF FOUND. WALL 2x4 TREATED PLATE r SLOPE 2* 2' TO DOOR me 4' CONC. SLAB ON GRADE a t a p , � ° , � ° V v 0 0 0 0 0 0 00 00 O0 00 O0 00 6' -8' MIN. °0 ° °0 °0 °0 °0 GRANULAR FILL °° °° 00 o• ° 00 °0 0 0 o• o• o• v v d \ d ° \ d \ a v ° v ° \ o vx< 1' -4' FOUNDATION WALL of GARAGE REAR CRAWL and BASEMENT FOUNDATIONS R -13 BATT INSULATION W/ 2 MIL. VAPOR BARRIER 3/4' RIGID INSULATION NOTE: OFFSET FACE OF STUD 112' FROM FACE OF FOUND. WALL SIDING GRADE lx BAND BOARD W/ 112' DRYWALL DRIP EDGE '.�% (SEE ELEV. ) 2x4 TREATED cn SILL PLATE a 4' CONC. SLAB ON GRADE GRANULAR FILL 3/4' FLOOR DECKING, SEE FLOOR FRAMING PLAN FOR JOIST LAYOUT (2) RISER AT 7 -3/4' EACH (1) 9' TREAD PERIMETER INSULATION DOWN TO GRANULAR FILL TYPICAL FOUNDATION WALL: x 8' CAP BLOCK x (3) 8' LINE BLOCK x SILL ANCHOR BOLTS a 6' -0' O.C. x 16'x8' CONCRETE FOOTING 4' MIN. GRANULAR FILL UNDER 6 MIL. VISOUEEN VAPOR BARRIER det.estF28 SIDING 112' INSULATION SHEATHING TYPICAL FOUNDATION WALL: x 8' CAP BLOCK x (3) 8' LINE BLOCK x SILL ANCHOR BOLTS a 6' -0' O.C. x 16'x8' CONCRETE FOOTING GRANULAR FILL OVERDIG TO 12' ABOVE p p V p v p TOP OF FOOTING , 00 , 00 00 , °0 °0 00 %0* 00 °0 00 00 4' DRAIN TILE °0 e 00 Oo 00 v a d ° d v \ d \ v v ° v ° \ a v det.estF31 SIDING PROVIDE TREATED R -13 BATT INSULATION NOTE: OFFSET FACE OF STUD 112" BAND BOARD AT V/ 2 MIL. VAPOR BARRIER FROM FACE OF FOUND. WALL CONCRETE SLAB AREA 3/4' RIGID INSULATION 3/4' FLOOR DECKING cu 2x4 TREATED PLATE SEE FLOOR FRAMING SLOPE 1/8* PER FOOT PLAN FOR JOIST LAYOUT V, L , d r d p L, L d Q d d v\ d r i d v d p\ d p\ p ° v PERIMETER INSULATION ° O ° ° ° ° V DOWN TO GRANULAR FILL °0 °0 °0 °0 00 00 o0 °0 °0 °0 00 00 o0 O• O. ° ° O• O• ° ° °o Oo TYPICAL FOUNDATION WALL: o • ° o . ° o . O . ° ° 00 °0 °0 x 8' CAP BLOCK O0 00 00 00 °0 ° x (3) 8' LINE BLOOM( °0 ° ` °° x SILL ANCHOR BOLTS a 6'-0" 0. C. . ° e 00 o ° x 16'x8' CON CRETE FOOTING 00 °o o O o O o 4' MIN. GRANULAR FILL d ° ° \ d a ° ° ° ° v \ UNDER 6 MIL. VISOUEEN 0o \ \ v V p \ v v \ VAPOR BARR I ER L� FOUNDATION WALL or PATIO - SIDING CRAWL and PART'L BASEMENT FOUNDATIONS 4' CONC. SLAB ON GRADE W /THICKENED EDGE 16' -18' MIN. 3RANULAR FILL SEE TYPICAL = OUNDATION WALL GRADE FOUNDATION WALL m GARAGE - SIDING CRAWL and BASEMENT FOUNDATIONS NOTE: OFFSET FACE OF STUD 112' FROM FACE OF FOUND. WALL 112' INSULATION SHEATHING BRICK VENEER W Q det.estF27 112' DRYWALL ANCHOR BOLTS AT 6' O.C. 4' CONC. SLAB ON GRADE v • • GRANULAR FILL 0a � 0o � ao ° o. o. o. TYPICAL Fg11tIAT10N PALL: 8' CAP BLOCK � 12" CAP BLOCK o ° � ■ 16' :24' CONT. CONC. TRENCH a FOOTING ON VIRGIN SOIL OR 4 , a Y/ (2) #4 BARS CONT. ON a' CERTIFIED COMPACTED FILL W/ MIN. BEARING CAPACITY OF 2.000 P.S.F. FOUNDATION WALL at GARAGE -BRICK RETURNS det.estF29 � � TWO -STORY SLAB FOUNDATIONS det.estF21