HomeMy WebLinkAbout1040.95.3NOTE: SILL PLATE TO BE FLUSH
R -13 BATT INSULATION WITH CRAWL SIDE OF
W/ 2 MIL. VAPOR BARRIER FOUNDATION WALL
(2) RISER AT 7 -3/4' EACH
(1) 9' TREAD
4' CONC. SLAB ON GRADE SLOPE 2' TO DOOR j
v , L v 1 L v L
_0 v _0 v vv
0 o0 o0 o0 00 00 0
00 00 00 00 00 00
6'-8' MIN. 0, o
GRANULAR FILL °0
0 0
O•
0
op
o• o• o• o•
v
A v\ d \ d
\ p V\ V p\ bo
v
1'-4-
FOUNDATION WALL at GARAGE REAR
FOUNDATION WALL at PORCH -BRICK
3/4' FLOOR DECKING
SEE FLOOR FRAMING
PLAN FOR JOIST LAYOUT
2x4 TREATED PLATE
TYPICAL FOUNDATION WALL:
x 8' CAP BLOCK
x (3) 8' LINE BLOCK
x SILL ANCHOR BOLTS a 6'-0* O.C.
x 16'x8' CONCRETE FOOTING
PERIMETER INSULATION
DOWN TO GRANULAR FILL
4' MIN. GRANULAR FILL
UNDER 6 MIL. VISOUEEN
VAPOR BARRIER
4' CONC. SLAB ON GRADE
W/ THICKENED EDGE
1 1/2'
TYPICAL FOtNNDATIO WALL:
x 4' CAP BLOCK
x (4) 8' LINE BLOCK
x 16'x8" CONCRETE FOOTING
\I-Il' MIN.
GRANULAR Flll
CRAWL FOUNDATIONS det.estF46
CRAWL and PART'L BASEMENT
FOUNDATIONS
PROVIDE TREATED
NOTE: OFFSET FACE OF STUD
112'
R-13 BATT INSULATION
IV/
BAND BOARD AT
FROM FACE OF FOUND.
WALL
2 MIL. VAPOR BARRIER
CONCRETE SLAB AREA
3/4' RIGID INSULATION
3/4' RIGID INSULATION
4' CONC. SLAB ON GRADE
SLOPE 1/8'
PER FOOT
BRICK VENEER
112* EXPANSION MATERIAL
cu
3/4' FLOOR DECKING
W /THICKENED EDGE
4�0
SLOPE 1/8' PER FOOT
SEE FLOOR FRAMING
CD
PLAN FOR JOIST LAYOUT
\ v \ v
a d v a p a d p
\ d \
a p\ p a\ a p\ p a
d \ 00
00
v
00 00 V \
2x4 TREATED PLATE
d, a o0
00
0 0 °0
\ d 00 00
°0
°p °p
TYPICAL FOUNDATION WALL:
00
00
0 °0
x 8' CAP BLOCK
o • o •
° °
o •
°
o0 °0
x (3) 8' LINE BLOCK
°°
00 00
°°
00
• °°
° ° °° °0
x SILL ANCHOR BOLTS a 6'-0" 0. C.
00
V, L , d
r d p
°0
x 16'x8' CONCRETE FOOTING
o0
PERIMETER INSULATION
o0
PERIMETER INSULATION
00
°
00
DOWN TO GRANULAR FILL
o • ° o • ° °
2x4 TREATED
DOWN TO GRANULAR FILL
4' MIN. GRANULAR FILL
\
\ V \ \
e d
\ v \ d •
\ a \ a \ a
p P p
v .1 \ v
\ ,
d ' L ,
UNDER 6 MIL. VISOUEEN
°0
°0 o0 °0 °0
°0 °
VAPOR BARRIER
1' -4'
WOOD PLATE
FOUNDATION WALL at PORCH -BRICK
3/4' FLOOR DECKING
SEE FLOOR FRAMING
PLAN FOR JOIST LAYOUT
2x4 TREATED PLATE
TYPICAL FOUNDATION WALL:
x 8' CAP BLOCK
x (3) 8' LINE BLOCK
x SILL ANCHOR BOLTS a 6'-0* O.C.
x 16'x8' CONCRETE FOOTING
PERIMETER INSULATION
DOWN TO GRANULAR FILL
4' MIN. GRANULAR FILL
UNDER 6 MIL. VISOUEEN
VAPOR BARRIER
4' CONC. SLAB ON GRADE
W/ THICKENED EDGE
1 1/2'
TYPICAL FOtNNDATIO WALL:
x 4' CAP BLOCK
x (4) 8' LINE BLOCK
x 16'x8" CONCRETE FOOTING
\I-Il' MIN.
GRANULAR Flll
CRAWL FOUNDATIONS det.estF46
PART'L and FULL BASEMENT FOLIATIONS
det.estF48
det.estF35
NOTE: OFFSET FACE OF STUD I12'
FROM FACE OF FOUND. WALL
R -13 BATT INSULATION
W/ 2 MIL. VAPOR BARRIER
DRYWALL
3/4' DECKING
SEE-FLOOR FRAMING
PLAN FOR JOIST LAYOUT
8' POURED
CONC. WALL
3/4' RIGID INSULATION
SIDING
Ix WOOD BAND
BOARD W/ ALUM.
DRIP CAP
(SEE ELEV.)
2x4 TREATED
SILL PLATE
ANCHOR BOLTS
AT 6' -0' O.C.
FLOOR SYSTEM at FOUNDATION WALL - SIDING
PART'L and FULL BASEMENT FOUNDATIONS
NOTE: OFFSET FACE OF STUD 112'
FROM FACE OF FOUND. WALL
3/4' FLOOR DECKING ,
SEE FLOOR FRAMING
PLAN FOR JOIST LAYOUT
2x4 TREATED d
v
PLATE a
° o
TYPICAL FOUNDATION WALL: j °
x 8' POURED CONCRETE WALL
° OVERDIG
x SILL ANCHOR BOLTS a 6' -0' O.C. �_ _jyl
x 16'x8' CONCRETE FOOTIN
J
4' CONCRETE SLAB ON GRADE a J
W/ 6 MIL. VAPOR BARRIER i ,
V
, 0 00 °0 °0
O0 o0 o0 O0
r L , r L a d a\ a d a °, 0 00 °0 °0
4' MIN. 1 d V Q ,.-
GRANULAR FILL* °° °° °°
O• O• 00 00 00 d v a r a 00 00 00
L
°0 00 L Q L D o
A d O O
4' DRAIN TILE
5' -0"
FOUNDATION WALL of HOUSE - SIDING
PART'L and FULL BASEMENT FOUNDATIONS
det.estF38
NOTE: OFFSET FACE OF STUD 112'
FROM FACE OF FOUND. WALL
2x4 TREATED PLATE
r
SLOPE 2* 2' TO DOOR
me
4' CONC. SLAB ON GRADE a t a p , � ° , � °
V v
0 0 0 0 0 0
00 00 O0 00 O0 00
6' -8' MIN. °0 ° °0 °0 °0 °0
GRANULAR FILL °° °°
00
o•
°
00
°0 0 0
o• o• o•
v v
d \ d ° \ d
\ a v ° v ° \ o
vx<
1' -4'
FOUNDATION WALL of GARAGE REAR
CRAWL and BASEMENT FOUNDATIONS
R -13 BATT INSULATION
W/ 2 MIL. VAPOR BARRIER
3/4' RIGID INSULATION NOTE: OFFSET FACE OF STUD 112'
FROM FACE OF FOUND. WALL
SIDING
GRADE lx BAND BOARD W/ 112' DRYWALL
DRIP EDGE
'.�% (SEE ELEV. )
2x4 TREATED
cn
SILL PLATE
a
4' CONC. SLAB ON GRADE
GRANULAR FILL
3/4' FLOOR DECKING,
SEE FLOOR FRAMING
PLAN FOR JOIST LAYOUT
(2) RISER AT 7 -3/4' EACH
(1) 9' TREAD
PERIMETER INSULATION
DOWN TO GRANULAR FILL
TYPICAL FOUNDATION WALL:
x 8' CAP BLOCK
x (3) 8' LINE BLOCK
x SILL ANCHOR BOLTS a 6' -0' O.C.
x 16'x8' CONCRETE FOOTING
4' MIN. GRANULAR FILL
UNDER 6 MIL. VISOUEEN
VAPOR BARRIER
det.estF28
SIDING
112' INSULATION SHEATHING
TYPICAL FOUNDATION WALL:
x 8' CAP BLOCK
x (3) 8' LINE BLOCK
x SILL ANCHOR BOLTS a 6' -0' O.C.
x 16'x8' CONCRETE FOOTING
GRANULAR FILL OVERDIG
TO 12' ABOVE p p V p v p
TOP OF FOOTING , 00 , 00 00 , °0
°0 00 %0* 00 °0
00 00
4' DRAIN TILE °0
e 00 Oo
00
v a
d ° d v \ d
\ v v ° v ° \ a
v
det.estF31
SIDING
PROVIDE TREATED R -13 BATT INSULATION NOTE: OFFSET FACE OF STUD 112"
BAND BOARD AT V/ 2 MIL. VAPOR BARRIER FROM FACE OF FOUND. WALL
CONCRETE SLAB AREA
NOTE:
OFFSET FACE OF STUD 112'
FROM FACE OF FOUND. WALL
3/4' RIGID INSULATION
4' CONC. SLAB ON GRADE
SLOPE 1/8'
PER FOOT
o
cu
3/4' FLOOR DECKING
W /THICKENED EDGE
4�0
SEE FLOOR FRAMING
SEE .FLOOR FRAMING
° p ° \ V
p \ p ° \
0
4 ° 4 4 ° ° 4
FOR JOIST LAYOUT
\ \ ° 00
00
00 00 00 O0
V, L , d
r d p
L, L d Q d d v\ d
r i d v
d p\ d
p\ p ° v
PERIMETER INSULATION
00
00 0
00 00 00 00
°
O
° ° ° °
V
2x4 TREATED
DOWN TO GRANULAR FILL
1 112'
°0
°0 °0
°0
°0 o0 °0 °0
°0 °
p \ d.
WOOD PLATE
°.
0
°o
0
a °. °• °e °e
0 0 0 0 0
00
o
p v\
TYPICAL FOUNDATION WALL:
o e
° °0 °°
o
00 °°
o . o 0
0 °° 00 °° 00 °° °0 °° 00
0
°° o0 °
° v o o
TYPICAL FOUNDATION WALL:
TYPICAL FOUNDATION WALL:
x 4' CAP BLOCK
°0 °0
00
°0 °0 °0 °0
°0 °
° a
�-
x 8' POURED CONCRETE WALL
x (4) 8' LINE BLOCK
°0
°°
°0 °0 °0 °0
°0
0 ° L
x SILL ANCHOR BOLTS a 6' -0' O.C.
x 16'X8' CONCRETE FOOTING
o•
°
° e
o• 00-0000 •
°
0• o
°
a
x 16'X8' CONCRETE FOOTING
o °
0 °0 0
°0
o p
v a
t
x 16'x8' CON CRETE FOOTING
00
v
° \ d
3
•
4' CONC. SLAB ON GRADE
GRANULAR FILL TO
pp
0.
I' -1l' MIN.
o O o O o
a�\
W/ 6 MIL. VAPOR BARRIER
12' ABOVE TON' OF
a \ ,
\
4' MIN. GRANULAR FILL
GRANULAR FILL
d ° ° \ d a °
V a
° ° °
v
\
CONCRETE FOOTING
d p L J d
° L
0o
\ \
° ° •
4' DRAIN TILE
VAPOR BARR I ER
p ° \
°o Oo °e °o °o
00. O O O
v \
O O O
0 0 0
O 0
p
vp
4' GRANULAR FILL
4' DRAIN TILE
00 00 00 00 °0"
00 00 00
0.
V\ d
IV \
00 00 00 00 00
' \
v
a \ ° x'_
\ ° ► v \
°. 0. °.
0 0 0,
O
v �
\
o
0
0 0
0 o O .
0 0
.
L. d
,
v
\ e
0 00 O
0
og 00*
FOUNDATION WALL
at PORCH =
SIDING
PART'L and FULL BASEMENT FOLIATIONS
det.estF48
det.estF35
NOTE: OFFSET FACE OF STUD I12'
FROM FACE OF FOUND. WALL
R -13 BATT INSULATION
W/ 2 MIL. VAPOR BARRIER
DRYWALL
3/4' DECKING
SEE-FLOOR FRAMING
PLAN FOR JOIST LAYOUT
8' POURED
CONC. WALL
3/4' RIGID INSULATION
SIDING
Ix WOOD BAND
BOARD W/ ALUM.
DRIP CAP
(SEE ELEV.)
2x4 TREATED
SILL PLATE
ANCHOR BOLTS
AT 6' -0' O.C.
FLOOR SYSTEM at FOUNDATION WALL - SIDING
PART'L and FULL BASEMENT FOUNDATIONS
NOTE: OFFSET FACE OF STUD 112'
FROM FACE OF FOUND. WALL
3/4' FLOOR DECKING ,
SEE FLOOR FRAMING
PLAN FOR JOIST LAYOUT
2x4 TREATED d
v
PLATE a
° o
TYPICAL FOUNDATION WALL: j °
x 8' POURED CONCRETE WALL
° OVERDIG
x SILL ANCHOR BOLTS a 6' -0' O.C. �_ _jyl
x 16'x8' CONCRETE FOOTIN
J
4' CONCRETE SLAB ON GRADE a J
W/ 6 MIL. VAPOR BARRIER i ,
V
, 0 00 °0 °0
O0 o0 o0 O0
r L , r L a d a\ a d a °, 0 00 °0 °0
4' MIN. 1 d V Q ,.-
GRANULAR FILL* °° °° °°
O• O• 00 00 00 d v a r a 00 00 00
L
°0 00 L Q L D o
A d O O
4' DRAIN TILE
5' -0"
FOUNDATION WALL of HOUSE - SIDING
PART'L and FULL BASEMENT FOUNDATIONS
det.estF38
NOTE: OFFSET FACE OF STUD 112'
FROM FACE OF FOUND. WALL
2x4 TREATED PLATE
r
SLOPE 2* 2' TO DOOR
me
4' CONC. SLAB ON GRADE a t a p , � ° , � °
V v
0 0 0 0 0 0
00 00 O0 00 O0 00
6' -8' MIN. °0 ° °0 °0 °0 °0
GRANULAR FILL °° °°
00
o•
°
00
°0 0 0
o• o• o•
v v
d \ d ° \ d
\ a v ° v ° \ o
vx<
1' -4'
FOUNDATION WALL of GARAGE REAR
CRAWL and BASEMENT FOUNDATIONS
R -13 BATT INSULATION
W/ 2 MIL. VAPOR BARRIER
3/4' RIGID INSULATION NOTE: OFFSET FACE OF STUD 112'
FROM FACE OF FOUND. WALL
SIDING
GRADE lx BAND BOARD W/ 112' DRYWALL
DRIP EDGE
'.�% (SEE ELEV. )
2x4 TREATED
cn
SILL PLATE
a
4' CONC. SLAB ON GRADE
GRANULAR FILL
3/4' FLOOR DECKING,
SEE FLOOR FRAMING
PLAN FOR JOIST LAYOUT
(2) RISER AT 7 -3/4' EACH
(1) 9' TREAD
PERIMETER INSULATION
DOWN TO GRANULAR FILL
TYPICAL FOUNDATION WALL:
x 8' CAP BLOCK
x (3) 8' LINE BLOCK
x SILL ANCHOR BOLTS a 6' -0' O.C.
x 16'x8' CONCRETE FOOTING
4' MIN. GRANULAR FILL
UNDER 6 MIL. VISOUEEN
VAPOR BARRIER
det.estF28
SIDING
112' INSULATION SHEATHING
TYPICAL FOUNDATION WALL:
x 8' CAP BLOCK
x (3) 8' LINE BLOCK
x SILL ANCHOR BOLTS a 6' -0' O.C.
x 16'x8' CONCRETE FOOTING
GRANULAR FILL OVERDIG
TO 12' ABOVE p p V p v p
TOP OF FOOTING , 00 , 00 00 , °0
°0 00 %0* 00 °0
00 00
4' DRAIN TILE °0
e 00 Oo
00
v a
d ° d v \ d
\ v v ° v ° \ a
v
det.estF31
SIDING
PROVIDE TREATED R -13 BATT INSULATION NOTE: OFFSET FACE OF STUD 112"
BAND BOARD AT V/ 2 MIL. VAPOR BARRIER FROM FACE OF FOUND. WALL
CONCRETE SLAB AREA
3/4' RIGID INSULATION
3/4' FLOOR DECKING
cu
2x4 TREATED PLATE
SEE FLOOR FRAMING
SLOPE 1/8* PER FOOT
PLAN FOR JOIST LAYOUT
V, L , d
r d p
L, L d Q d d v\ d
r i d v
d p\ d
p\ p ° v
PERIMETER INSULATION
°
O
° ° ° °
V
DOWN TO GRANULAR FILL
°0
°0 °0
°0
00 00
o0 °0
°0 °0
00 00
o0
O• O.
° °
O• O•
° °
°o Oo
TYPICAL FOUNDATION WALL:
o •
°
o .
°
o . O .
° °
00 °0
°0
x 8' CAP BLOCK
O0 00
00 00
°0 °
x (3) 8' LINE BLOOM(
°0
° `
°°
x SILL ANCHOR BOLTS a 6'-0" 0. C.
.
° e
00
o °
x 16'x8' CON CRETE FOOTING
00
°o
o O o O o
4' MIN. GRANULAR FILL
d ° ° \ d a °
° ° °
v
\
UNDER 6 MIL. VISOUEEN
0o
\ \
v V
p
\ v v \
VAPOR BARR I ER
L� FOUNDATION WALL or PATIO - SIDING
CRAWL and PART'L BASEMENT FOUNDATIONS
4' CONC. SLAB ON GRADE
W /THICKENED EDGE
16' -18' MIN.
3RANULAR FILL
SEE TYPICAL
= OUNDATION WALL
GRADE
FOUNDATION WALL m GARAGE - SIDING
CRAWL and BASEMENT FOUNDATIONS
NOTE: OFFSET FACE OF STUD 112'
FROM FACE OF FOUND. WALL
112' INSULATION SHEATHING
BRICK VENEER W
Q
det.estF27
112' DRYWALL
ANCHOR BOLTS AT 6' O.C.
4' CONC. SLAB ON GRADE
v • • GRANULAR FILL
0a � 0o � ao
° o. o. o.
TYPICAL Fg11tIAT10N PALL:
8' CAP BLOCK � 12" CAP BLOCK
o ° � ■ 16' :24' CONT. CONC. TRENCH
a FOOTING ON VIRGIN SOIL OR
4 , a Y/ (2) #4 BARS CONT. ON
a' CERTIFIED COMPACTED FILL W/
MIN. BEARING CAPACITY OF
2.000 P.S.F.
FOUNDATION WALL at GARAGE -BRICK RETURNS
det.estF29 � � TWO -STORY SLAB FOUNDATIONS det.estF21