Loading...
HomeMy WebLinkAbout0180.95.8SHEAR VALVE a � • 1 -1/2' STEEL RISER -� ENVIROFLEX SECONDARY -\ L "1 0 TCI DS4221 1 -1/2' ENVIROFLEX PRIMARY -J PRIMARY TEE FITTING CROSS SECTION NOTES 1. INSTALL ENVIROFLEX TEST DONUT ON PRIMARY LINE PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. 2. AFTER TESTING OF THE SECONDARY LINES, BACK OFF THE TEST DONUT AND LEAVE ON THE PRIMARY FOR FUTURE TESTING. 1' -8 3/4.' re LONGITUDINAL SECTION DISPENSER SUMP LAYOUT NO SCALE SCALES 1/2' a V -0' METAL I 1/2' THK, ASPHALT EXP, JT. MATL, W/ C RESISTANT SEALANT 6' THK. CONCRETE I (U I CANOPY COLUMN DETAIL SCALEo 1' = 1' -0' CANOPY FOUNDATION (SEE CANOPY DWGS.) } 1/2' THK. ASPHALT IMPREGNATED CANOPY COLUMN GASOLINE RESISTANT SEALANT EXPANSION JOINT MATERIAL W/ INTERIOR VENT PIPE % % (SEE CANOPY DRAWINGS) • i �r. :a SELL. ANp MALE Ift • d a • ° FIBERGLASS " AD APlbt, l 2' FIBERGLASS VENT LINE EXPANSION JOINT DETAIL SCALEi 1' = 1' -0' SAWED CONTROL JOINT W/ GASOLINE RESISTANT SEALANT li.o� Ft�li DISPENSER �- ISLAND FORM • s (3f7) -9960, ObK B --16 A�s FOR, OIL EQUIPMENT SUPPLY CORP.- SCALE, AS NOTED. N o. `�' °• TCI DS4221 1 -1/2' ENVIROFLEX PRIMARY -J PRIMARY TEE FITTING CROSS SECTION NOTES 1. INSTALL ENVIROFLEX TEST DONUT ON PRIMARY LINE PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. 2. AFTER TESTING OF THE SECONDARY LINES, BACK OFF THE TEST DONUT AND LEAVE ON THE PRIMARY FOR FUTURE TESTING. 1' -8 3/4.' re LONGITUDINAL SECTION DISPENSER SUMP LAYOUT NO SCALE SCALES 1/2' a V -0' METAL I 1/2' THK, ASPHALT EXP, JT. MATL, W/ C RESISTANT SEALANT 6' THK. CONCRETE I (U I CANOPY COLUMN DETAIL SCALEo 1' = 1' -0' CANOPY FOUNDATION (SEE CANOPY DWGS.) } 1/2' THK. ASPHALT IMPREGNATED CANOPY COLUMN GASOLINE RESISTANT SEALANT EXPANSION JOINT MATERIAL W/ INTERIOR VENT PIPE % % (SEE CANOPY DRAWINGS) • i �r. :a SELL. ANp MALE Ift • d a • ° FIBERGLASS " AD APlbt, l 2' FIBERGLASS VENT LINE EXPANSION JOINT DETAIL SCALEi 1' = 1' -0' SAWED CONTROL JOINT W/ GASOLINE RESISTANT SEALANT li.o� Ft�li CONTROL JOINT DETAIL SCALE, 1' = 140' BOTT, OF ENTRY HOLE 2' STAINLESS STEEL 4' ABOVE BOTT, OF FLEX HOSE COLUMN BASE PLATE ' VENT CONNECTION DETAIL SCALES 11= V -0' N 7� cop 7 SPENCER ENGI ING, INC." SEI CARMELs � (3f7) -9960, ObK B --16 A�s FOR, OIL EQUIPMENT SUPPLY CORP.- SCALE, AS NOTED. N o. `�' °• PROJECTS DA E, s 20751 i CRYSTAL . FLASH - CARMEL - 12 —J -94 STATE OFiv ` �.` �.''� was NO, 4 SF�ET TITLE *;1a1iAL ,E n���' DETAILS CONTROL JOINT DETAIL SCALE, 1' = 140' BOTT, OF ENTRY HOLE 2' STAINLESS STEEL 4' ABOVE BOTT, OF FLEX HOSE COLUMN BASE PLATE ' VENT CONNECTION DETAIL SCALES 11= V -0' N 7� cop 7 SPENCER ENGI ING, INC." SEI CARMELs � (3f7) -9960, ObK B --16 A�s FOR, OIL EQUIPMENT SUPPLY CORP.- SCALE, AS NOTED. N o. `�' °• PROJECTS DA E, s 20751 i CRYSTAL . FLASH - CARMEL - 12 —J -94 STATE OFiv ` �.` �.''� NO, 4 SF�ET TITLE *;1a1iAL ,E n���' DETAILS "F BTS DRAWN CHECKED APPRQVED O 4 BTS ,