Loading...
HomeMy WebLinkAbout0188.95.3;04 MAIN LEVEL FIN. FLR. " TT TOP CF FOUND. HALL @i-A5ONRY GOND. PROVIDE 4"Xb" PSI. 2. FLOOR 5LAE3 AREA5 TO BE all M/` ONR i' LEDDOE PmT RIOID LOAD INSULATION 4" 1 'ERF. FOUND. Q L?RAI, 1 1 "4/ GRAVEL BACK! ',.__l (TO SUMP) 4" F_ ' ISEMENT 5LAf3 L (TYP. ALL) "-)4' DETAIL MAIN LEV1_ i N. FLR. f + 4 "Top OF Fc! 4 HALL j IN50LATI, DETAIL O2 FOUNDATION NOT: 3: I. ALLONABLL .. _11L PRE55JRE PSI. 2. FLOOR 5LAE3 AREA5 TO BE ­fPACTr7r,> TO c15915 PmT MAX. DRY DEN51TY. LOAD 3. STANDARD PASEMENIT AND ,' "AGE SLAB TO BE 5IJf3F 4" CONCRETE ON C? NIL. BAi BARRIER OVER P05T ON 4" GRAVEL FII__L. 14"d. G0%. 4. 5TFaJCTt)FZAl_ e',ONCRETE FCC: 36 TO BE 2500 P51,51LA155 0500 P51. D_ 5. L30TTOM OF /*�!_L FOOTIN6,5 1 "!E 5FT 13ELON kqlOxl2 LOCAL FROST LINE. SEE UT, -5. 6. PROVIDE AN(7,1 le?R BOLTS I' ', A. x 10" STARTING II ® 6" FROM EAGH CORNER t, ;)' 0.(: ANn AT EACH 51VE OF ALL OPENII`4:-,, -.IN. (2) PER PIECE 32 x24 OF!5ILL. -1. GRAVL 5PACE: A. PROVIDE MIN. 4' &RAVFI ER 6 NIL POLY VAPOR BARRIER. B. DEPTH OF CRAWL TO 5!-_ 21--0", BOTTOM Or J015T TO C,1 - _L__L L— — --------- - - - - -- — — — — — — — — — -- 22 PmT POINT !T) LOAD ORT BLOC, TO 7 rz-1, a. "rr/"Irr /')= M&C✓Nt--e LC^"=R LEVE'L "FLOOF. PLAN 5GALE: 1/4'= 1'-0* NOTE- 11 1/4" MH J015T5PAGINC7 TO BE 5PEGIFIED BY THE MANUFAGTURER lit 1 ........... I ............... - — — — — — — — — — — — -- PmT POINT !T) LOAD ORT BLOC, TO 7 5IJf3F c P05T ON 52"H 14"d. G0%. FOOTI H/ #4 BAR5 cl O.C. EACH KAY LL D_ kqlOxl2 II — — — — — — — — — — — > < 32 x24 NOTE- 11 1/4" MH J015T5PAGINC7 TO BE 5PEGIFIED BY THE MANUFAGTURER lit 1 0 0 a 73 (S) Q) D_/ 3 LL O MAR q, Iqq5 QL c O Lu LL D_ 0 0 a 73 (S) Q) D_/ 3 LL O MAR q, Iqq5