HomeMy WebLinkAbout0188.95.3;04
MAIN LEVEL FIN. FLR.
"
TT TOP CF FOUND. HALL
@i-A5ONRY GOND.
PROVIDE 4"Xb"
PSI.
2.
FLOOR 5LAE3 AREA5 TO BE
all M/` ONR i' LEDDOE
PmT
RIOID
LOAD
INSULATION
4" 1 'ERF. FOUND.
Q L?RAI, 1 1 "4/ GRAVEL
BACK! ',.__l (TO SUMP)
4" F_ ' ISEMENT
5LAf3
L
(TYP. ALL) "-)4'
DETAIL
MAIN LEV1_ i N. FLR.
f
+ 4 "Top OF Fc! 4 HALL
j
IN50LATI,
DETAIL O2
FOUNDATION NOT: 3:
I.
ALLONABLL .. _11L PRE55JRE
PSI.
2.
FLOOR 5LAE3 AREA5 TO BE
fPACTr7r,> TO c15915
PmT
MAX. DRY DEN51TY.
LOAD
3.
STANDARD PASEMENIT AND ,'
"AGE SLAB TO BE
5IJf3F
4" CONCRETE ON C? NIL. BAi
BARRIER OVER
P05T ON
4" GRAVEL FII__L.
14"d. G0%.
4.
5TFaJCTt)FZAl_ e',ONCRETE FCC:
36 TO BE 2500
P51,51LA155 0500 P51.
D_
5.
L30TTOM OF /*�!_L FOOTIN6,5 1
"!E 5FT 13ELON
kqlOxl2
LOCAL FROST LINE. SEE UT,
-5.
6.
PROVIDE AN(7,1 le?R BOLTS I' ',
A. x 10" STARTING
II
® 6" FROM EAGH CORNER t,
;)' 0.(: ANn AT
EACH 51VE OF ALL OPENII`4:-,,
-.IN. (2) PER PIECE
32 x24
OF!5ILL.
-1.
GRAVL 5PACE:
A. PROVIDE MIN. 4' &RAVFI
ER 6 NIL
POLY VAPOR BARRIER.
B. DEPTH OF CRAWL TO 5!-_
21--0",
BOTTOM Or J015T TO C,1 -
_L__L
L—
— ---------
- - - - --
— — — — — — — — — --
22
PmT
POINT !T)
LOAD
ORT
BLOC,
TO 7
rz-1, a. "rr/"Irr /')= M&C✓Nt--e
LC^"=R LEVE'L "FLOOF. PLAN
5GALE: 1/4'= 1'-0*
NOTE- 11 1/4" MH J015T5PAGINC7 TO BE
5PEGIFIED BY THE MANUFAGTURER
lit
1
........... I ...............
- — —
— — — — — — — — — --
PmT
POINT !T)
LOAD
ORT
BLOC,
TO 7
5IJf3F
c
P05T ON
52"H
14"d. G0%.
FOOTI
H/ #4 BAR5
cl O.C. EACH KAY
LL
D_
kqlOxl2
II
— —
— — — — — — — — —
> <
32 x24
NOTE- 11 1/4" MH J015T5PAGINC7 TO BE
5PEGIFIED BY THE MANUFAGTURER
lit
1
0
0
a
73
(S)
Q)
D_/
3
LL
O
MAR q, Iqq5
QL
c
O
Lu
LL
D_
0
0
a
73
(S)
Q)
D_/
3
LL
O
MAR q, Iqq5