Loading...
HomeMy WebLinkAbout0203.95.5ROOF 5HEATHIN6 PER SPEC ROOF 5HINOLF-5 W/ MTL DRIP EDGE 5EE ELEVATION5 PER SPEC FOR ROOF PITCH ENGINEERED ROOF TRU55E5 IN5ULATION 12 BAFFLE - 211 MIN. CLEAR 7 SEE CORNICE DETAIL R -30 INSULT 2-20 TOP PLATE 1/2' GYP. BD--- 2xI l RIGID IN5UL. 5HEATHIN6 PER 5PEC HOR 51PINO PER SPEC. 10 STUD 1611 O.C. THERMOPLY 5HEATHING 'T&6 5UBFLOOR (GLUE & SCREW) !x10 FLOOR J5T. AT 1611 O.C. P.T. BOTTOM PLATE 2x10 RIM 411 POURED CONC. ON 411 MIN. SAW F 3 IN5UL IERGLA5 BATT IN5ULATION 3/411 T&G 5UBFLOOR (GLUE & 5CREW ON 2x10 FLOOR J5T. AT 1611 O.C. -20 BOTTOM PLATE -R-13 IN5UL FIBERGLA5 BATT IN5ULATION ,2x4 P.T. 51LL PLATE W/ AB15 PER SPEC. LOCATE PLATE SQUARELY ON TOP OF WALL A5 SHOWN I" MIN. SIDING OVERLAP �11 CONCRETE WALL _FIELD VERIFY POUR HT. --------BITOUMINOU5 WATERPROOFING PER SPEC. ON CEMENTITIOU5 PARGING. _----5EE 5HT 1.1 FOR FURTHER INFO ON FOUNDATION e° o PERFORATED GRAIN TILE 5CHE0.3034 x 2011 CONT. POURED CONCRETE FOOTING 510INi, ONLY WALL 5EGT ION 3/411= 0-011 3 STAIR 5E6TION 3.1 1/4' = P -011 Roof shingles per spec on 151 felt per spec 4/211 Roof sheathing Engineered roof trusses 0 24" O.c. G. M 16HAEL WAN60UR Architects / Consultants 1365 Shenandoah Rochester Hills Michigan 48306 (313) 656-1187 5E6 T ION 13R 16K TO 13ELT OPTION. 1/411= 1(-011 CONT RIDGE 1211 HDR 3611 KNEEWALL 5EE DETAIL PER m FOYER Cli ----fIELO VERIFY — m TRU55 CONFIGURATION FOR VAULT a6. ineuletion per spec II I (R-30) — — — (R -3 0) D �` — — x6 Fascia Master Builder (( cont soffit vent Ff IF —If- — — — -11— — 7 IT — — - x6 5offit I III II II II II II x10 Frieze board MEATH MASTER 5U ITE -2x4 Top plate Project AT BRIDGE siring per spec on tyvek II '� x4 studs, 1611 o.c. IN D IAN A FAM ILY -I I butt insulation II'' Insulated sheathing 0 IV 1 5 I O N II'' -2x4 Bottom plate L L 12220 North Meridian E II'� x10 Floor joist 0 1611 o.c. Suite 1185 V�-2x4`Topplate II'' 1/2n AB 1211 OC THRU 2x10 BOND J015T x10 Rim joist Carmel, Indiana 46032 /411 TW, gkie & screw AND BOTTOM CHORD OF GIRDER TRU55 reds per elevation GARAGE K ITGHEN m 2x4 studs, 1611 o.c. R-I I butt insulation 1/211 Insulated sheathing w/ tyvek per spec 5/811 TYPE 11X° GYP. BD AT WALL5 AND CL I-2x4 Bottom plate COMMOM TO HOUSE 5E6 T ION 13R 16K TO 13ELT OPTION. 1/411= 1(-011 CONT RIDGE 1211 HDR 3611 KNEEWALL 5EE DETAIL PER m FOYER Cli I I — m II II II II I lid 3 --- NOTE - REVERSE FRAMING 5EGTION 1/411= 1(-011 .i0 4r 5A5EMENT CONVENTIONAL FRAMING IN LINE W/ TRU55E5— 13R 19615 15 4 13 —_ —_ 12 I I 13 -- 12- __ II_ 10 8 -- 7- _6 5 4 - - -3 2 12 �7 BASEMENT 13R 16K TO 13ELT OPTION. x10 Rh joist /411 T &6, glue & screw .T. 2X4 mud sip x10 Floor joist 0 1611 o.c. Foundation waterproofing ill Concrete foundation I" Concrete slab w/ 411 min sand under /2° Expansion joint `ooting keyway I" Footing drain ,0"w x 811d CONC. FTC. NOTE= FIELD CHECK ALL APPROPRIATE AN12 CURRENT 12ETAIL5 FOR TH15 PROJECT PRIOR TO START OF CON5TRUCT ION ROOF 5HINGLE5 PER SPEC 1/2° PLYWO ROOF SHEATHING ENGINEERED ROOF TRU55E5 FIBERGLA55 BATT IN5ULATION TRU55 MFR. TO VERIFY CLEAR SPAN TRU55 .iIROER TRU55 OR ML BM.5 PER PLAN FIELD VERIFY €XTEW SOFFIT 5' AT REAR OF FAMILY ROOM 2x6 5TUD5 0 16' OL OUTLINE OF CANT A NOOK BEYOW FLU51i HDR AT NOOK BEYOW FIELD VERIFY BEARING INTER5ECTION 31411 T&G 5UBFLOOR (GLUE & SCREW) ON 2x10 FLOOR J015T PER FRAMING PLAN FIBF-ROLA55 BATT INSULATION 811 CONC. FOUWATION WALL W /5"x1211 BRICK LEDGE Subdivision / Plan 2779 Job No. 2779 Date 155UE 2/25/ Sheet Title MUM 5EGT ION5 SASE HOUSE (510IN6 510155 & REAR) Sheet No. 3 Cn "I 5HT —of_ N (i (.nm irinh+ I QQd Pt ffo G:nmo Lnrnnrn+inn I I — m II II II II I --- NOTE - REVERSE FRAMING AT BRIDGE II '� FAM ILY II'' II'' II'� II'' BASEMENT 13R 16K TO 13ELT OPTION. x10 Rh joist /411 T &6, glue & screw .T. 2X4 mud sip x10 Floor joist 0 1611 o.c. Foundation waterproofing ill Concrete foundation I" Concrete slab w/ 411 min sand under /2° Expansion joint `ooting keyway I" Footing drain ,0"w x 811d CONC. FTC. NOTE= FIELD CHECK ALL APPROPRIATE AN12 CURRENT 12ETAIL5 FOR TH15 PROJECT PRIOR TO START OF CON5TRUCT ION ROOF 5HINGLE5 PER SPEC 1/2° PLYWO ROOF SHEATHING ENGINEERED ROOF TRU55E5 FIBERGLA55 BATT IN5ULATION TRU55 MFR. TO VERIFY CLEAR SPAN TRU55 .iIROER TRU55 OR ML BM.5 PER PLAN FIELD VERIFY €XTEW SOFFIT 5' AT REAR OF FAMILY ROOM 2x6 5TUD5 0 16' OL OUTLINE OF CANT A NOOK BEYOW FLU51i HDR AT NOOK BEYOW FIELD VERIFY BEARING INTER5ECTION 31411 T&G 5UBFLOOR (GLUE & SCREW) ON 2x10 FLOOR J015T PER FRAMING PLAN FIBF-ROLA55 BATT INSULATION 811 CONC. FOUWATION WALL W /5"x1211 BRICK LEDGE Subdivision / Plan 2779 Job No. 2779 Date 155UE 2/25/ Sheet Title MUM 5EGT ION5 SASE HOUSE (510IN6 510155 & REAR) Sheet No. 3 Cn "I 5HT —of_ N (i (.nm irinh+ I QQd Pt ffo G:nmo Lnrnnrn+inn