Loading...
212701 09/12/2012 CITY OF CARMEL, INDIANA VENDOR: 00351732 Page 1 of 1 ONE CIVIC SQUARE MORPHEY CONSTRUCTION INC CHECK AMOUNT: $1,410.23 `. % CARMEL, INDIANA 46032 1499 N SHERMAN DRIVE INDIANAPOLIS IN 46201-1515 CHECK NUMBER: 212701 CHECK DATE: 9/12/2012 DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 203 R4350900 25838 1, 410 .23 STREET LIGHTING/INTER FINAL CONSTRUCTION PROJECT INVOICE j DATE: August 23, 2012 i COMPANY NAME: Morphey Construction, Inc. AND ADDRESS 1499 N. Sherman !� ' Indianapolis, Indiana 46201 TELEPHONE NO.: (317)-356-9250 2 1 FAX NO.: (317)-356-9253 PROJECT NAME: Street Lighting and Signage Improvements Project PROJECT NO.: 11-10 INVOICE NO.: FINAL Construction pay items as per Final Pay Estimate as shown on the attached invoice for work completed between May to August. In addition, acceptance of the Final Pay Estimate by the Contractor shall release the City of Carmel from any further claims, financial, liable or otherwise, by the General Contractor and/or it's sub-contractors, agents, personnel or otherwise. Acceptance of the Final Pay Estimate does not release the Contractor of it's responsibilities as stated in the Contract Documents. t TOTAL PAY THIS ESTIMATE: $0.00 PLUS RETAINAGE DUE: $1,410.23 TOTAL NOW DUE: $1,410.23 r Submitted by Cros Ro n ' ee , 82711 Z_ Project Represen - signed name Date Lance Stahley { Project Representative - printed name j Accepted by "Contractor Name" t Project Representative - signed name Date j ' Project Representative - printed name i i CITY OF CARMEL INTERSECTION STREET LIGHTING AND SIGNAGE IMPROVEMENTS Project BASE and ALTERNATE BID PROJECT NO.11-10 FINAL PROGRESS PAY ESTIMATE NO J 3 thlej n -V IV, :140scri AM 1 otal uantity�.,, U ft 9 h;f --F Ef�di"'' 110 Data" -,,�Price this, r„y MobilizaticV.Demobilization -1000 _LS 1:00 Ls $119.00, $119.00, $11U0. 2 Street SlAn and-Post Remove 4.00 EA 4700 EA -S40.00' - $160.001� $160;00 3- Light Pole Assembly and Foundation.-Remove an 4.001 EA 4.00--EA -$250,00-.- $1,000.001. $1.000,00. Deco rative,StreetiSig7ASSerfibly 4-.00: EA 4.00 EA: $1,200.00 '$4,800,0011 $4,800.00, 5 Concrete Foundation with Grounding,30 in,Diam 8.00 l EA:1 8.00 EA $875,00 $7,000.001 ---$7,000.001,: 6 i ht Plole AMsembly.Street- 8.00 EA, 8= .EA_ , $8:000.00', $64-.000.001 -$64,000.00L L2 - 7- Cable arker 2.001:. EA 2,00, EA $100,00- $200-00- 8 .,Handhole -5.00:-EA 5A0 EA ii $550.00 -12,760.00L $2,750;00 9'.Electric Receotacle' $250.0T -$250.00 1' f00' EKX) $250:00 , .00 � EN 10,11condUlt,Steel;Galvanized,2 ins,, 1 420.00 LFT 420',00 LFT! 518,50 $7,770.00' $7.770.00 11.-Wre,No.4,Copper.In 2 in.Galvanized Steel Co i 646.00',LIFT. 645.001 LFT•Y- $8.00- $6.160.00 $5:160.00 12 11 Conduit PVC,4" LFT' -LFTji i. 13,1Wtre.-No.4,:Copper,In.Plastic Duct,;In-Treneh..4: 280:00"LFT 280.00 LIFT $8;00 $2,240.00 12.240,00 14.JController'Cabinet;P1.Modified ;2.00-,'EA 2,00 EA"' $3.850,00 S7,700.00 $7,700'.00 15,','l Controller Cabinet Foundation,P1.Modified 2.001 EA Z00 EA $950.00- $1,900-00 .$1,900.00 , 16', Mulched Seeding 111.00 ISYS: ---111,0ULSYS; -$1.50, $166.50. $166,50 17i Conduit,PVC,3/4 IN 10.00.LFT- 10.00 LFT,'1 -15.00, -,$60.00; $50.00 rA-11:.Mdbilizatidn'tiDeinbbilizau661. 1-00 G-LS LS: $119,00, .$119.00 $119:00 A-2; Street Sign and Post:Remove 3.00 1 EA' 3.00 EA:, -UZOO $126.00 '-5126:00' A-3,Light Pole-Assembly and Foundation.Remove an 4.00 EA 4:00 EA $250;00 11 $1,000.00 -.$1.000m 1 A-4 Decorative Street Sign Assembly - 3.00 EA 3,001, EA $1,200,00 - $3,600.00 $3,600.00 A-5 Concrete Foundation with Grounding,30 in,Diam:1 3.00 EA, 3.00 I EA $875.00, $2.625:00 $2.625.00 A-6,lLight.Pole Assembly,Street 440 EA 3.00, EA- -$8.000.00 -$24,000.00, $24-.000;00 A,7.Cable Duct Marker EA EA $100:00 1 A-B'lHandhole --- 2.00 EA 2,00 EA' $575.00, $1.160.-00 $1,150,00 'A-9'Conduit.'Steel.Galvanized;2 in- LFT $18.50 A-10 Wire,No,4,Copper,In 2 in.Galvanized Steel-Co f 148.00 'LFT 148,00 LIFT 11 -$8.00 -.$11,1184.001 $1;184:00 A-1,1 Conduit,PVC-41" LIFT .-l-FT` A-12 Wire,No.4,.Gopper,:In Plastic Duct,In Trench,.4. 140.00:LFT 140.00-LFT -S8,00T-- 111,120.00 11,120;00 A=13 Existing Controller Cabinet,Modify 1100%EA 1.00 EA y $5013,00 W0-00 $500,00 K-14 Mulched Seeding- 484,00 66-00 ;SYS 56.00:SYS sl::50 -$84.00. A.-15 Conduit,PVC,3/41N 60.00."LFT. 50,00 $5.00 $260-00. $250,00 3141.023.60 $741,02-3.51 TOTALS AND PAY ESTIMATE CALCULATIONS TOTAL PAY THIS ESTIMATE $141,023.50 TOTAL PAY TO DATE $141,023.60 Release 1% RETAINAGE DEDUCT PREVIOUS NET PAY ESTIMATES $139,613.27 NET FINAL PAY ESTIMATE $1,410.23 CrossRoad Engineers, PC Inspecting Firm By Date Morphey Construction', Inc. Contractor Date Prescribed by State Board of Accounts City Form No.201(Rev 1995) ACCOUNTS PAYABLE VOUCHER CITY OF CARMEL An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc. Payee Morphey Construction Purchase Order No. 1499 N. Sherman Terms Indianapolis, IN 46201 Date Due Invoice Invoice Description Date Number (or note attached invoice(s) or bill(s) Amount 8/23/2012 final Street Lighting and Signage Improvements $ 1,410.23 Total $ 1,410.23 1 hereby certify that the attached invoice(s), or bill(s), is (are)true and correct and I have audited same in accordance with IC 5-11-10-1.6. ,20 Clerk-Treasurer VOUCHER NO WARRANT NO. Morphey Construction ALLOWED 20 1499 N. Sherman IN SUM OF $ Indianapolis, IN 46201 $ 1,410.23 ON ACCOUNT OF APPROPRIATION FOR Board Members PO#or INVOICE NO ACCT#/TITLE AMOUNT DEPT# . I hereby certify that the attached invoice(s), or 25838 final 203-R509 1410.23 bill(s) is (are)true and correct and that the materials or services itemized thereon for which charge is made were ordered and received except 8/27/2012 Signature City Engineer Cost Distribution ledger classification if Title claim paid motor vehicle highway fund