HomeMy WebLinkAboutC200-Site Development Plan-Layout1S: \55960PUL -S1 \DWG \C200 -Site Development Plan.dwg, 9/5/2012 12:31:21 PM, KGilson
RB NLET
= 906.95
=902.05
Tld MI•
907.13
90C.58
389.93
389.93
rye
o Q>
STM NLET
-T.0.- 903.87
NV. W= 900.17
xo
.908 -- o0
_ u
-y06.�
'K M.E-
-906 -S
(26`� -'M.E.
-Cr
EX. STN INLE
�e L- s eT C.. w05c1734�
-0 _g06 ----
M.E
MH
C -907 55
°INV- W- 895.94
907.9
907.0
-906
o
- ; 905.8'
0
147 Lt 6" 55D �o- RISER
10' LI,lt>€. -, T.C.= 908.1
/10' L.M.A.
3t
4
30' R -D.147 L.F. SWALE ®1.83%
id
Vc 1s
MF_F_ SS
rap 909.4
D MFPG =908.0
I1 MLAG =908.8
00
mm
908.4
MFPG =900.7
MLAG =908.7
908.7
VAR. B.
30' R.D.E. 217 L.F. SWALE 01.09%
0 R.D.E. 211 L.F. S
31
17
910.2 P
MFPG =908.8
MLAG 908.8
91 0.0
911.2
910.4
' AR. D.U. &5.5S�
J 91o_4
p MFP0= 910.7
MLAG =- O.7
91 0-.1
910.7 25' Et 129_.>
20' D.0 dsT .E.
22
M.F.F.=
911.2
MF•G =908.6
MLAG =008.0
909.9
910.4
910.4
)9 910.7
910_2
20 D.U. &S.S.E
20
66 L.F. 15"
910.06
MOONSEED DRIVE
MOONSEED
908.30
DR
907.02
0 1.08%
20' D -& 1
910.1
910.7
3 INLET
= 905.79-,
= 900.89 r
VH
i -98
3 -98
126
126
STM MH
=904.96
= 898.46-e
=890.0
=890.L7
910.2
N M LAors, 0.7
m )vlFFO9I�10.7
HAL
909.9
0 MLAG =90825
MF•0=908.5
Mf
10
911_2
910.4'
8
9 M.F.F.=
909.6
911.4
18' R.C.P. ® 041%
n'Lr- e " SSD 41
77 L.F. SWALE 0 1.00%
L_i oR.u.E 'Ps
218 LF.
EX. STM INLET
T C.= 903.92
NV- P- 899.8'_
NV W- 899.75
/
906 xOs
eS9GtI. E.- vS M.T 9-
SWALE
07.3
143 L.F. SWArL•L�
- -908 --
UFB IT ET
r�5 L.F. it R.CP, 00.92 %.
49 L.F. 12' R.C.P. ®092%
899
897
URB INLET
.0. 904.25-.
E- 899 -90
_ET
27---_„
.77
MH
k33
28�
173
173
M MH
304.81
98.56
391.01
91 98
EX
C.. B INLET
T -C.- 904.__
N -- 899.72
V =899 75
I dll
LAKE #2
N.P. = 898.00
2 YEAR ELEV.= 899.16
10 YEAR ELEV. = 899.96
100 YEAR ELEV. = 901.38
BOTTOM ELEV. = 890.00
e.
o
6.42
HATA
o°
78 L.E. 24" R.C.P. 0 0 53%
'R
� 1111.
X
7e h�tl
ealaSragte
891-
893
895
096
897
898
899
STREET
EX. C
T.0 =9,4.
INV W
SLOPE PER
SETBACK -\
SIDEWALK
f
T O.B.
ELEV.= 905.00
DEVELOPMENT GRADE
4
71
FOUNDATION
TOP OF WALL GRADE
FINISHED GRADE
-n7 nn7
BASEMENT SPOILS
SWALE
DEVELOPMENT GRADE
TYPICAL LOT SECTION DETAIL
NO SCALE
EXISTING CRAPE-
OVER EXCAVATE
0.9" FOR SEDIMENT
ACCUMULATION
BOTTOM = 890.00
CROSS SECTION LAKE #2
OPTION 2 (SEE SHEET C801)
NOT- TO-SCALE
T.
TB =905.0
12'
904.0
TB =905.0
SPILLWAY LAKE #2
NOT- TO-SCALE
t
Minimum Flood Protection Grades
From Sections 104.02, 302.06 and 303.07 of the City of Carmel Storm
Water Technical Standards Manual
1. Definitions
a. Minimum Flood Protection Grade of all structures fronting a
pond or open ditch shall be no less than 2 feet above any
adjacent 100 -year local or regional flood elevations,
whichever is greater, for all windows, doors, pipe entrances,
window wells, and any other structure member where
floodwaters can enter o building.
Lowest Adjacent Grade is the elevation of the lowest grade
adjacent to a structure, where the soil meets the
foundation around the outside of the structure (including
structural members such as basement walkout, patios,
decks, porches, support posts or piers, and rim of the
window well.
Standard: Lowest Adjacent Grade
a. General
1. The Lowest Adjacent Grade for residential, commercial,
or industrial buildings shall have two feet of freeboard
above the flooding source's 100 -year flood elevation
under proposed conditions.
b- For areas s outside a Special Flood Hazards Area (SFHA) or
FEMA or IDNR designated floodploin
i. The Lowest Adjacent Grade for all residential,
commercial, or industrial buildings adjacent to ponds
shall be set a minimum of 2 feet above the 100 -year
pond elevation or 2 feet above the emergency overflow
weir elevation, whichever is higher.
n. The Lowest Adjacent Grade for all residential,
commercial, or industrial buildings shall be set a
minimum of 2 feet above the highest noted overflow
path /ponding elevation across the property frontage.
m- In addition to the Lowest Adjacent Grade requirements,
any basement floor must be at least a foot above
the normal water level of any wet- bottom pond.
3. Design Notes:
a. Each lot that is adjacent to a pond, open ditch or flooding
source has a flood protection grade. There are instances
where there are multiple different flooding sources for 1
structure. In this case, there should be a flood protection
grade listed for each side of the structure in the event that
piping from the structure discharge to either flood source.
b. Finished floor elevation or the lowest building entry elevation
shall be no less than 6 inches above finished grade around
the building. Also, the building's lowest entry elevation that
is adjacent to and facing a road shall be a minimum of 15
inches above the road elevation.
EARTHWORK:
L EXCAVATION
DRAINAGE SUMMARY
X, I L
SITE ACREAGE=9.366 AC.
OFFSITE /UPSTREAM ACREAGE =OAC. OFFISTE
ALLOWABLE RELEASE RATE 10 YR =3.14cfs
100 YR.- 7.54cfs
POST DEV. 10 YR.=1.35cfs 100 YR.=7.29cfs
6
A. Excavated material that is suitable may be used for fills. All unsuitable material and
all surplus excavated material not required shall be removed from the site.
B. Provide and place any additional fill material from offsite as may be necessary to
produce the grades required on plans. Fill obtained from offsite shall be of quality as
specified for fills herein and the source approved by the Developer. It will be the
responsibility of the Contractor for any costs for fill needed.
2. REMOVAL OF TREES
A. All trees and stumps shall be removed from areas to be occupied by a road surface or
structure area. Trees and stumps shall not be buried on site.
3. PROTECTION OF TREES
A. The Contractor shall, at the direction of the Developer, endeavor to save and protect
trees of value and worth which do not impair construction of improvements as designed.
B. In the event cut or fill exceeds 0.5 foot over the root area, the Developer shall be
consulted with respect to protective measure to be taken, if any, to preserve such trees.
4. REMOVAL OF TOPSOIL
A. All topsoil shall be removed from all areas beneath future pavements or building.
Topsoil removal shall be to a minimum depth of 6 inches or to the depth indicated in the
geotechnical report provided by the Developer to be excavated or filled. Topsoil should
be stored at a location where it will not interfere with construction operations. The
topsoil shall be free of debris and stones.
5. UTILITIES
A. Rules and regulation governing the respective utility shall be observed in executing all
work under this section.
B. It shall be the responsibility of the Contractor to determine the location of existing
underground utilities 2 working days prior to commencing work. For utility locations to
be marked call Toll Free 1- 800 - 382 -5544 within Indiana or 1- 800 - 428 -5200 outside
Indiana.
6. SITE GRADING
A. Do all cutting, filling, compacting of fills and rough grading required to bring entire
project area to subgrade as shown on the drawing.
B. The tolerance for paved areas shall not exceed 0.05 feet above established subgrade.
All other areas shall not exceed 0.05 feet plus or minus the established grade. Provide
roundings at top and bottom of banks and other breaks in grade.
C. The Engineer shall be notified when the Contractor has reached the tolerance as stated
above, so that field measurements and spot elevations can be verified by the Engineer.
The Contractor shall not remove his equipment from the site until the Engineer has
verified that the job meets the above tolerance.
FORM \EARTH W RK
NOTES TO CONTRACTOR:
ALL PADS SHOULD BE TESTED TO ASSURE A COMPACTION OF AT
LEAST 95 PERCENT OF THE MAXIMUM DRY DENSITY USING THE
STANDARD PROCTOR TEST METHOD.
ANY PRIVATE TILES LOCATED ON THIS SITE WILL NEED TO BE
LOCATED; BREATHERS SET AT THE DOWNSTREAM PROPERTY LINE
AND CRUSHED OR REMOVED ACROSS THIS SITE. IF ANY OF THESE
TILES EXTEND BEYOND THE LIMITS OF THIS PROJECT, THEY WILL
NEED TO BE PROVIDED A POSITIVE OUTLET AND ALLOWED TO
CONTINUE TO FUNCTION, AS IT IS ILLEGAL TO BLOCK OFF A PRIVATE
"MUTUAL" TILE
CONTRACTOR SHALL VERIFY DEPTHS OF ALL EXISTING ONSITE
UTILITIES PRIOR TO CONSTRUCTION TO CONFIRM THERE IS NOT ANY
CONFLICTS WITH OTHER UTILITIES, STORM SEWERS OR STREETS.
CONFLICTS AFTER CONSTRUCTION BEGINS ARE SOLELY THE
CONTRACTOR'S RESPONSIBILITY
CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING
TO SCHEDULE A PRE- CONSTRUCTION MEETING TO REVIEW THE
DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF
NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR
CERTAIN STAGES OF WORK TO REVIEW THE AUTHORITY OF THE
DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND
PROPOSED CITY R/W.
EXISTING PAVEMENT TO BE SAW CUT TO A CLEAN EDGE ADJACENT
TO ANY WIDENING, AUXILIARY LANES, ETC.
NO EARTH DISTURBING ACTIVITY MAY TAKE PLACE WITHOUT AN
APPROVED STORM WATER MANAGEMENT PERMIT.
THERE IS TO BE NO DRIVEWAY ENCROACHMENTS INTO EASEMENTS
BETWEEN LOTS.
UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE
RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS
REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH
PROPOSED DEVELOPMENT SHALL BE THE RESPONSIBILITY OF THE
DEVELOPER TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES
REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED
RIGHT -OF -WAY LINE.
GRAPHIC SCALE
50 0 25 50
( IN FEET )
1 inch = 50 ft.
STORM SEWER FOR THIS PROJECT WILL BE PUBLIC.
ALL STORM SEWERS WITHIN PUBLIC
RIGHT -OF -WAY SHALL BE RCP CLASS 111.
CONTACT:
CARMEL UTILITIES (317) 571 -2648
FOR WATER AND SANITARY SEWER
LOCATES
DRAINAGE SUMMARY
SITE ACREAGE=9.366 AC.
OFFSITE /UPSTREAM ACREAGE =OAC. OFFISTE
ALLOWABLE RELEASE RATE 10 YR.= 3.18cfs
100 YR.=9.54cfs
POST DEV. 10 YR =1.48cfs 100 YR =8.84cfs
870
1848
87
f
LEGEND
EXISTING CONTOUR
EXISTING SANITARY SEWER
EXISTING STORM SEWER
PROPOSED GRADE
PROPOSED CONTOUR
PROPOSED SANITARY SEWER
+ - PROPOSED STORM SEWER
w
25
744.7
MFF =752.6
MFPG =753.0
MLAG =753.0
4" SSD TO LOT
PROPOSED WATER LINE
PROPOSED SWALE
PROPOSED 5' SIDEWALK (BY HOME BUILDER) (DEVELOPER
SHALL INSTALL SIDEWALKS ALONG ALL COMMON AREAS)
LOT NUMBER
PAD ELEVATION
4" SSD LATERAL STUB TO LOTS WITHOUT
REAR YARD UNDERDRAINS (LOTS 4-6)
PROPOSED 6" DUAL WALL HANCOR HI -Q TYPE 4
UNDERDRAINS
MIN. FINISH FLOOR ELEV. IS BASED OFF OF THE BELOW
CRITERIA, WHICHEVER IS HIGHER:
1. (1) FOOT ABOVE THE NEAREST UPSTREAM
OR DOWNSTREAM SANITARY MANHOLE
WHICH EVER IS LOWEST.
2. 15" (1.25') ABOVE THE ROAD ELEVATION
3. 6" (0.5') ABOVE THE M.LA.G
MINIMUM FLOOD PROTECTION GRADE
MINIMUM LOWEST ADJACENT GRADE
RISER TC
6" DUAL WALL
RANCOR HI -Q
TYPE 4 SSD
CONSTRUCTION LIMITS
FLOOD STATEMENT
THIS SITE DOES NOT LIE WITHIN A FLOODWAY OR FLOOD
PLAIN PER FIRM MAP 18057CO205F DATED FEB 19, 2003.
VEGETATIVE COVER
EXISTING SITE CONSIST MOSTLY OF GRASS AND WEEDS
WITH WOODS ON THE SITE.
ADJACENT PROPERTIES
NORTH: RESIDENTIAL
EAST: RESIDENTIAL
SOUTH: RESIDENTIAL
WEST: RESIDENTIAL
IuPPS Digs Safely.
Indiana Underground Plant Protection Service
Know what's below.
CaII before you dig.
REVISED PER TAC COMMENTS
z
LA
0
csi
0)
m
r
0
ALWAYS ON
Lag
co r
co rM
0
o m in a
z
^a
0
z
W
0
0
uuJ
0
L. J
HAMILTON COUNTY, INDIANA
CLAY TOWNSHIP
DRAWN BY:
<RC
CHECKED BY.
BAH
SHEE NO.
C200
5 & A JOB NO,
55960PUL