Loading...
HomeMy WebLinkAbout0451.95.8n MEC,HAN IGAL HEATING, VENTILATING AMID AIR CONDITIONING RPIRP-P FOR THIS WORK SECTION IS INDICATED ON THE DRAWINGS, AND INU.I,DES MX 15 NOT LIMITED TO AIR CONDITIONING UNITS, rILTERS CONTROLS, DUCTS, DAMPE{25, 6RtlLS, REGISTERS, DIrYIn15E`R5, DUCT INSULATION, E (MAUST FANS, GAS RADIANT HEAT SYSTEM, UNIT HF -ATER5 AND OTHER MISC. ITEMS RE0JIRm FOR A COMPLETE J645. EQUIPMENT SUPPLIED AND INSTAL EP TO THE PROJECT SHALL PE OF THE MANUrAGTURP-R MODEL MAAPER AND CAPACITY AS NOTED ON THE PLANS. THE MECt'IANICAL SYSTEM HAS PEEN DESIGNED A5 A COMPLETE PACKAGE; CONTRACTOR SHALL AS LRE AND VERIFY THAT ALL Mi�RUIPMENT, CONTROLS, AND MISC. ITEMS PE SUPPLIED TO PROVIDE A COMPLF7`E AND OPERAPL� HVAC SYSTEM. DUCTWORK SHALL PE INSTA -LE!P IN STRICT ACC. VANCE WITH SMA.G.NA STANDARDS. ALL DUCTWORK SHALL PE OF PROPER GI,IAGE FOR SIZE AND VOL UMN OF AIR HAI'- P . ALL SLPPLY DUCTWORK SHALL PE LINED WITH 1/2" INSI,LATION, AND ALL RETURN AIR DUCTS SHALL PE LINED FOR THE FIRST Id—O" PROM THE AIR HANDLING UNIT. ALL DUCTWORK SHALL PE INSTALLED AS NOTED ON PLANS, AND SHALL NOT INTr-fRPr=JRP- WITH STRUCTURAL SUPPORT SYSrr -MS. ALL DUCTWORK SHALL_ PE SECURELY t1 AND FASTENED FROM PRIMARY AND SECONDARY STRUCTURAL_ MEMPERS ONLY, t-MAN6ER5 SHALL PE PLACED PER SMAGNA STANDARS, AND SHALL NOT VIPRATE DURING OPERATION. PROVIDE ALL NECESSARY SLPPRORT -S, t-tANGERS, ISOLATORS, GONNt= ,TORS, DAMPER AND VOLUv1N CONT ROL_5 FOR A GOMPLFTE AND MECt iANIGAL SYSTEM. FINAL DL, -TWORK SIZING & AIR VOLUvr -S TO PE PY M.G. GRILLES AND PirTIJ5ER5 SHALL PE INSTALLED IN LOCATIONS A5 NOTED ON THE PLANS. ALL UNITS SHALL PE OF MANLrACT PP-R AND MODEL NU MR AS NOTED. PROVIDE ALL NECESSARY SPIN -INS, ADAPTERS, DAMPERS, CONNECTORS, AND MISG. ITEMS TO PROVIDE FOR A COMPLETE INSTALLATION. EXHAUST FANS SHALL PE PROVIDED AND INSTALLED A5 NOTED ON THE PLANS. PROVIDE ALL NECESSARY r1ACHING, PACK-- DRAdrT DAMPERS, CONTROLS AND MISG. ITEMS TO PROVIDE A 6OMPL1= INSTALLATION. CONNECTIONS AND COORDINATION WITH ALL TRADES SHALL PE Tt-1E RESPONSIPILITY OF THE CONTRACTOR. VERIFY CURD LOCATIONS, GAS PIPING, ELECTRICAL LOCATIONS ANP ELECTRICAL GAPAPILII'IES FOR A COMPLETE INSTALLATION. START-UP AND PALANGING SHALL PE IMNt2PIATLE_.Y AFTER OR DURING OWNERS MOVING INTO THE FACILITY. PiZOVIDE ALL NECESSARY EQUIPMENT FILTERS AS REQUIRED. CONDENSING UNIT MF,tiANICAL Mo:RUIPME 4r: A TON COOLING 5Y571 =M W/ 15 KW I°URNACE UNIT ® LIMA - SERIES 50 24" X Zh" tJ W 74"1 C �=4 oi�14N1 f G o14 SCALE: 1/4.!* - 1 ' -Q" II 1 I o � OH H U U l� Q to z PLASTIC EGGI.RATE I /2�� X I /2" (SIZE AS SHOWN) i=L0�14Nl z R E V I S I O N FILE 4196 -N* DRAWN BY RR CHECKED BY RRi DATE 07.29.3 COMM NO '341 SHEET \MAE OF O tJ W Z In (n N r to 3 UL 3 Z dN� V V) Z Q Q w cn �- W 0 U) z z w L z PLASTIC EGGI.RATE I /2�� X I /2" (SIZE AS SHOWN) i=L0�14Nl z R E V I S I O N FILE 4196 -N* DRAWN BY RR CHECKED BY RRi DATE 07.29.3 COMM NO '341 SHEET \MAE OF