HomeMy WebLinkAbout0451.95.8n
MEC,HAN IGAL
HEATING, VENTILATING AMID AIR CONDITIONING RPIRP-P FOR THIS WORK
SECTION IS INDICATED ON THE DRAWINGS, AND INU.I,DES MX 15 NOT
LIMITED TO AIR CONDITIONING UNITS, rILTERS CONTROLS, DUCTS,
DAMPE{25, 6RtlLS, REGISTERS, DIrYIn15E`R5, DUCT INSULATION, E (MAUST
FANS, GAS RADIANT HEAT SYSTEM, UNIT HF -ATER5 AND OTHER MISC. ITEMS
RE0JIRm FOR A COMPLETE J645.
EQUIPMENT SUPPLIED AND INSTAL EP TO THE PROJECT SHALL PE OF THE
MANUrAGTURP-R MODEL MAAPER AND CAPACITY AS NOTED ON THE PLANS.
THE MECt'IANICAL SYSTEM HAS PEEN DESIGNED A5 A COMPLETE PACKAGE;
CONTRACTOR SHALL AS LRE AND VERIFY THAT ALL Mi�RUIPMENT, CONTROLS,
AND MISC. ITEMS PE SUPPLIED TO PROVIDE A COMPLF7`E AND OPERAPL�
HVAC SYSTEM.
DUCTWORK SHALL PE INSTA -LE!P IN STRICT ACC. VANCE WITH
SMA.G.NA STANDARDS. ALL DUCTWORK SHALL PE OF PROPER GI,IAGE
FOR SIZE AND VOL UMN OF AIR HAI'- P . ALL SLPPLY DUCTWORK SHALL PE
LINED WITH 1/2" INSI,LATION, AND ALL RETURN AIR DUCTS SHALL PE
LINED FOR THE FIRST Id—O" PROM THE AIR HANDLING UNIT. ALL
DUCTWORK SHALL PE INSTALLED AS NOTED ON PLANS, AND SHALL NOT
INTr-fRPr=JRP- WITH STRUCTURAL SUPPORT SYSrr -MS. ALL DUCTWORK SHALL_ PE
SECURELY t1 AND FASTENED FROM PRIMARY AND SECONDARY
STRUCTURAL_ MEMPERS ONLY, t-MAN6ER5 SHALL PE PLACED PER SMAGNA
STANDARS, AND SHALL NOT VIPRATE DURING OPERATION. PROVIDE ALL
NECESSARY SLPPRORT -S, t-tANGERS, ISOLATORS, GONNt= ,TORS, DAMPER AND
VOLUv1N CONT ROL_5 FOR A GOMPLFTE AND MECt iANIGAL
SYSTEM.
FINAL DL, -TWORK SIZING & AIR VOLUvr -S TO PE PY M.G.
GRILLES AND PirTIJ5ER5 SHALL PE INSTALLED IN LOCATIONS A5 NOTED ON
THE PLANS. ALL UNITS SHALL PE OF MANLrACT PP-R AND MODEL NU MR AS
NOTED. PROVIDE ALL NECESSARY SPIN -INS, ADAPTERS, DAMPERS,
CONNECTORS, AND MISG. ITEMS TO PROVIDE FOR A COMPLETE
INSTALLATION.
EXHAUST FANS SHALL PE PROVIDED AND INSTALLED A5 NOTED ON THE
PLANS. PROVIDE ALL NECESSARY r1ACHING, PACK-- DRAdrT DAMPERS,
CONTROLS AND MISG. ITEMS TO PROVIDE A 6OMPL1= INSTALLATION.
CONNECTIONS AND COORDINATION WITH ALL TRADES SHALL PE Tt-1E
RESPONSIPILITY OF THE CONTRACTOR. VERIFY CURD
LOCATIONS, GAS PIPING, ELECTRICAL LOCATIONS ANP ELECTRICAL
GAPAPILII'IES FOR A COMPLETE INSTALLATION.
START-UP AND PALANGING SHALL PE IMNt2PIATLE_.Y AFTER OR DURING
OWNERS MOVING INTO THE FACILITY. PiZOVIDE ALL NECESSARY
EQUIPMENT FILTERS AS REQUIRED.
CONDENSING UNIT
MF,tiANICAL Mo:RUIPME 4r:
A TON COOLING 5Y571 =M W/
15 KW I°URNACE UNIT
®
LIMA -
SERIES 50
24" X Zh"
tJ W
74"1 C �=4 oi�14N1 f G o14
SCALE: 1/4.!* - 1 ' -Q"
II
1
I
o
� OH
H
U
U
l�
Q
to z
PLASTIC EGGI.RATE I /2�� X I /2" (SIZE AS SHOWN)
i=L0�14Nl
z
R E V I S I O N
FILE 4196 -N*
DRAWN BY RR
CHECKED BY RRi
DATE 07.29.3
COMM NO '341
SHEET
\MAE
OF
O
tJ W
Z
In (n N
r to
3
UL 3
Z
dN� V
V) Z
Q Q w cn
�- W 0
U) z
z
w
L
z
PLASTIC EGGI.RATE I /2�� X I /2" (SIZE AS SHOWN)
i=L0�14Nl
z
R E V I S I O N
FILE 4196 -N*
DRAWN BY RR
CHECKED BY RRi
DATE 07.29.3
COMM NO '341
SHEET
\MAE
OF