Loading...
HomeMy WebLinkAbout0516.95.16 5 4 3 0 u BASEMENT AND FOUNDATION PLAN 1/4! = 1' -0" li 7DRAWING INDEX J C A200 BASEMENT NMID FOUNDATION PLAN A201 FIRST FLOOR PLAN; SCHEDULES A202 SECOND FLOOR PLAN A301 FRONT AND REAR ELEVATIONS A302 SIDE ELEVATIONS; WALL SECTION E201 FIRST FLOOR ELECTRICAL PLAN E202 BASEMENT AND SECOND FLOOR ELEC. PLANS O LL U GENERAL NOTES 1. CONTRACTOR COMPLY WITH ALL APPLICABLE CODES, REGULATIONS, COVENANTS, AND RESTRICTIONS. 2. NOTIFY ARCHITECT OF ANY DISCREPANCIES PRIOR TO CONTINUING WORK. 3. DIMENSIONS ARE NOMINAL TO FACE OF EXTERIOR WALL AND CENTERLINE OR FACE OF INTERIOR WALLS. 4. VERIFY CLEAR DIMENSIONS REQUIRED AT ALL FIXTURES AND EQUIPMENT. I.E.: BATHTUBS 5. ALL GYPSUM BOARD TO BE 1/2' ATTACH ALL DRYWALL USING DRYWALL SCREWS — DO NOT USE NAILS. 6. INSTALL FIBER REINFORCED CEMENT BOARD BEHIND TILE WAILS AT BATHTUBS AND SHOWERS. 7. INSTALL SOFFIT AND ROOF VENTS AS REQUIRED BY CODE. PROVIDE INSECT SCREENS ON ALL SOFFIT, ROOF, AND GABLE END VENTS. DO NOT INSTALL ROOF VENTS ON FRONT SIDE OF HOUSE. 8. DO NOT INSTALL PLUMBING VENTS OR FLUES ON FRONT SIDE OF HOUSE. 9. INSTALL STEEL LINTELS ABOVE ALL OPENINGS WHICH SUPPORT MASONRY ABOVE — SIZE PER CODE. 10. GLUELAM BEAMS AND I— JOISTS, IF USED, TO BE SIZED BY SUPPLIER /MANFACTURER. DESIGN PER LOADING REQUIREMENTS INDICATED BY CODE AND ACTUAL WEIGHT OF MATERIALS. 11. SIZE ALL RAFTERS, JOISTS, HEADERS, ETC. PER FIBER STRESS/ MODULAS OF ELASTICITY OF WOOD USED AND SPAN TABLES /LOADS /REQUIREMENTS PER CODE. 12. INSTALL GUTTERS AND DOWNSPOUTS ON ALL FASCIAS FROM ALL ROOFS. PROVIDE CONCRETE SPLASH BLOCKS AT ALL DOWNSPOUTS. 13. ALL ROOF OVERHANGS ARE 14' FROM FACE OF STUD, 14. INSTALL DRAINAGE PIPING AROUND ALL BASEMENT WALLS AND AND BASEMENT SLAB. ROUTE TO SUMP PIT, AND INSTALL PUMP IN BASEMENT MECHANICAL ROOM. ___ Byrum Archftec 8888 Keystone Cross Su to 770 A Indianapois, Irdana 46240 317/574 -3302 FAX 317 /574 -3303 Use of Documents The prongs, 4.d -t-s. and a - dx ss by the kctutecl for this Project are mstrunwds kch` Vs sense for use sokgy eith respect b and shag not be used m oche pojecls p oddi Project eilhoul wrAtm permmoon and due cane lM Mctk.t. Scope Drawings Then draeings m6cate the goal scope of N tem,e of achileclural design concept, the diner baiWq, the major orchdeclurd elweenta M. i the 't—turd, mecfgrucd, and /w 6-t-al "ye The bra 9, do nor — ssarily i d sate a dew required 1a Lag perlamwnce and completion d —1. nl the Conlroct. N the basis d the gm indicated a described, the trade cadradon sk items requirad Ip the papa —Aim and can the +ork. Drawn By I Checke CADD I JWB Date 06 -01 -95 Revisions: A06-09-Kg; Certified By M DL j sheet No. 20 OF Sheets Z J C O U Q a: � (L Z O LL U Q Q z (L w J M < W Q M DL j sheet No. 20 OF Sheets