HomeMy WebLinkAbout0516.95.16 5
4
3
0
u
BASEMENT AND FOUNDATION PLAN
1/4! = 1' -0"
li
7DRAWING
INDEX
J
C
A200
BASEMENT NMID FOUNDATION PLAN
A201
FIRST FLOOR PLAN; SCHEDULES
A202
SECOND FLOOR PLAN
A301
FRONT AND REAR ELEVATIONS
A302
SIDE ELEVATIONS; WALL SECTION
E201
FIRST FLOOR ELECTRICAL PLAN
E202
BASEMENT AND SECOND FLOOR ELEC. PLANS
O
LL
U
GENERAL NOTES
1. CONTRACTOR COMPLY WITH ALL APPLICABLE CODES,
REGULATIONS, COVENANTS, AND RESTRICTIONS.
2. NOTIFY ARCHITECT OF ANY DISCREPANCIES PRIOR TO
CONTINUING WORK.
3. DIMENSIONS ARE NOMINAL TO FACE OF EXTERIOR WALL AND
CENTERLINE OR FACE OF INTERIOR WALLS.
4. VERIFY CLEAR DIMENSIONS REQUIRED AT ALL FIXTURES AND
EQUIPMENT. I.E.: BATHTUBS
5. ALL GYPSUM BOARD TO BE 1/2'
ATTACH ALL DRYWALL USING DRYWALL SCREWS — DO NOT USE
NAILS.
6. INSTALL FIBER REINFORCED CEMENT BOARD BEHIND TILE
WAILS AT BATHTUBS AND SHOWERS.
7. INSTALL SOFFIT AND ROOF VENTS AS REQUIRED BY CODE.
PROVIDE INSECT SCREENS ON ALL SOFFIT, ROOF, AND GABLE
END VENTS. DO NOT INSTALL ROOF VENTS ON FRONT SIDE
OF HOUSE.
8. DO NOT INSTALL PLUMBING VENTS OR FLUES ON FRONT
SIDE OF HOUSE.
9. INSTALL STEEL LINTELS ABOVE ALL OPENINGS WHICH
SUPPORT MASONRY ABOVE — SIZE PER CODE.
10. GLUELAM BEAMS AND I— JOISTS, IF USED, TO BE SIZED BY
SUPPLIER /MANFACTURER. DESIGN PER LOADING REQUIREMENTS
INDICATED BY CODE AND ACTUAL WEIGHT OF MATERIALS.
11. SIZE ALL RAFTERS, JOISTS, HEADERS, ETC. PER FIBER STRESS/
MODULAS OF ELASTICITY OF WOOD USED AND SPAN
TABLES /LOADS /REQUIREMENTS PER CODE.
12. INSTALL GUTTERS AND DOWNSPOUTS ON ALL FASCIAS FROM
ALL ROOFS. PROVIDE CONCRETE SPLASH BLOCKS AT ALL
DOWNSPOUTS.
13. ALL ROOF OVERHANGS ARE 14' FROM FACE OF STUD,
14. INSTALL DRAINAGE PIPING AROUND ALL BASEMENT WALLS AND
AND BASEMENT SLAB. ROUTE TO SUMP PIT, AND INSTALL
PUMP IN BASEMENT MECHANICAL ROOM.
___
Byrum
Archftec
8888 Keystone Cross
Su to 770
A Indianapois, Irdana
46240
317/574 -3302
FAX 317 /574 -3303
Use of Documents
The prongs, 4.d -t-s. and a - dx ss
by the kctutecl for this Project are mstrunwds
kch` Vs sense for use sokgy eith respect b
and shag not be used m oche pojecls p oddi
Project eilhoul wrAtm permmoon and due cane
lM Mctk.t.
Scope Drawings
Then draeings m6cate the goal scope of N
tem,e of achileclural design concept, the diner
baiWq, the major orchdeclurd elweenta M. i
the 't—turd, mecfgrucd, and /w 6-t-al "ye
The bra 9, do nor — ssarily i d sate a dew
required 1a Lag perlamwnce and completion d
—1. nl the Conlroct. N the basis d the gm
indicated a described, the trade cadradon sk
items requirad Ip the papa —Aim and can
the +ork.
Drawn By I Checke
CADD I JWB
Date 06 -01 -95
Revisions:
A06-09-Kg;
Certified By
M
DL j
sheet No.
20
OF Sheets
Z
J
C
O
U
Q
a:
�
(L
Z
O
LL
U
Q
Q
z
(L
w
J
M
<
W
Q
M
DL j
sheet No.
20
OF Sheets