Loading...
HomeMy WebLinkAboutFinal Inspection Report/Intersection Street lighting and Sign ImprovementsCITY OF CARMEL REPORT OF CONTRACT FINAL INSPECTION AND RECOMMENDATION FOR ACCEPTANCE Contract: #2201 - 50080, 2200 - 2000,203 -509, P.O. Project: #25838 INTERSECTION STREET LIGHTING AND SIGNAGE IMPROVEMENTS 11 -10 # Date Construction Substantially Complete: May 30th, 2012 (The date all items were completed, except punch list and removal of traffic control devices.) Intermediate Completion Date: N/A Preliminary Inspection made by: Lance Stahley, CrossRoad Engineers, P.C. # Date Punch List Items Completed: May 30 2012 Sod Maintenance Expired on: n/a # Date Sod Repaired, if necessary: N/A # Date Failed Material Replaced:n /a Final Inspection made by: Lance Stahley, CrossRoad Engineers satisfactory from Station on May 30, 2012 Entire project to Station Date: Mav 30, 2012 and all work was found to be # Date Construction Signs and Temporary Traffic Control Devices Removed: May 30, 2012 Pavement Smoothness N/A comply with Specifications. Pavement Markings N/A been placed in accordance with the IMUTCD manual or as directed by the District Traffic Engineer. Right -of -Way (is) clear of all encroachments. Date of Last Work May 30, 2012 RECOMMEND ACCEPTANCE Project Representative CrossRoad Engineers, P.C. By: City of Carmel Engineer City of Carmel Engineering Dept. Representative * By: * By: * By: City of Carmel, Hamilton County LOCAL PUBLIC AGENCY nod /1r�se CERTIFICATE OF SUBSTANTIAL COMPLETION Project No.: 11 -10 Project Name: INTERSECTION STREET LIGHTING. AND SIGNAGE IMPROVEMENTS Contractor: - -- .Morohev Construction. Inc. Requisition No.: #2201 - 50080, 2200 - 2000,203 -509, P.O. #25838 The Work is described as the. Tl e remova;l of 'existing street lighting:,and "iitst�hllation of new street signage, new street: lights 'and foundations, ,steel;and.PVC con luit:and'wi ing;. -and electrical cabinet. receptacle.and� meter':for:the 96` -r'' Street and;Dttch- .R'oad,:and' 1.16`"`` Street: and: Ditch'; Road. roundabouts.- Also; the= installation of new street l hts and lfoundations steel and PV6conduits >'and "wiring and; electric. cabinet and meter-for the 106th Street and:1o.wne Road'-tnteiiection, The Work performed under this contract has been reviewed and found to be substantially complete. The date of Substantial Completion is hereby established as May 30, 2012 SUBSTANTIAL COMPLETION DEFINED The stage of construction where, in the opinion of OWNER, all items of the Work (or specified portion thereof) necessary to enable the asset to be utilized without significant restrictions for the purpose for which the asset was constructed have been completed. All pay items shall be completely installed and all necessary testing as required by the Laws and Regulations and/or Contract Documents shall be completed. A list of items to be completed or corrected, prepared by the CONTRACTOR and verified and amended by the ENGINEER has been performed: The failure to include any items on such list does not -alter the responsibility of the CONTRACTOR to complete all work in accordance with the Contract Documents. The CONTRACTOR has completed or 'corrected the punch out work since the date of Substantial Completion. If not specified in an attachment or in the Contract Documents the CONTRACTOR is responsible for maintenance, heat, utilities, and insurance. Morphey Construction Inc. CONTRACTOR (d BY RECOMMENDED FOR ACCEPTANCE DATE CrossRoad Engineers, P.C. July 20, 2012 . ENGINEER/ARCHITECT BY DATE The OWNER accepts the work or designated portion whereof as Substantially Complete. City of Carmel Department of Engineering OWNER ATE