HomeMy WebLinkAboutFinal Inspection Report/Intersection Street lighting and Sign ImprovementsCITY OF CARMEL
REPORT OF CONTRACT FINAL INSPECTION
AND RECOMMENDATION FOR ACCEPTANCE
Contract: #2201 - 50080, 2200 - 2000,203 -509, P.O. Project:
#25838
INTERSECTION STREET LIGHTING
AND SIGNAGE IMPROVEMENTS
11 -10
# Date Construction Substantially Complete: May 30th, 2012
(The date all items were completed, except punch list and removal of traffic control devices.)
Intermediate Completion Date: N/A
Preliminary Inspection made by:
Lance Stahley, CrossRoad
Engineers, P.C.
# Date Punch List Items Completed: May 30 2012
Sod Maintenance Expired on: n/a
# Date Sod Repaired, if necessary: N/A
# Date Failed Material Replaced:n /a
Final Inspection made by:
Lance Stahley, CrossRoad Engineers
satisfactory from Station
on May 30, 2012
Entire project to Station
Date: Mav 30, 2012
and all work was found to be
# Date Construction Signs and Temporary Traffic Control Devices Removed: May 30, 2012
Pavement Smoothness N/A comply with Specifications.
Pavement Markings N/A been placed in accordance with the IMUTCD manual or as directed by the
District Traffic Engineer.
Right -of -Way (is) clear of all encroachments.
Date of Last Work May 30, 2012
RECOMMEND ACCEPTANCE
Project Representative
CrossRoad Engineers, P.C.
By:
City of Carmel Engineer
City of Carmel Engineering Dept. Representative
* By:
* By:
* By:
City of Carmel, Hamilton County
LOCAL PUBLIC AGENCY
nod /1r�se
CERTIFICATE OF SUBSTANTIAL COMPLETION
Project No.: 11 -10
Project Name: INTERSECTION STREET LIGHTING. AND SIGNAGE IMPROVEMENTS
Contractor: - -- .Morohev Construction. Inc.
Requisition No.: #2201 - 50080, 2200 - 2000,203 -509, P.O. #25838
The Work is described as the. Tl e remova;l of 'existing street lighting:,and "iitst�hllation of new street
signage, new street: lights 'and foundations, ,steel;and.PVC con luit:and'wi ing;. -and electrical cabinet.
receptacle.and� meter':for:the 96` -r'' Street and;Dttch- .R'oad,:and' 1.16`"`` Street: and: Ditch'; Road. roundabouts.-
Also;
the= installation of new street l hts and lfoundations steel and PV6conduits >'and "wiring and; electric.
cabinet and meter-for the 106th Street and:1o.wne Road'-tnteiiection,
The Work performed under this contract has been reviewed and found to be substantially complete. The
date of Substantial Completion is hereby established as May 30, 2012
SUBSTANTIAL COMPLETION DEFINED
The stage of construction where, in the opinion of OWNER, all items of the Work (or specified portion
thereof) necessary to enable the asset to be utilized without significant restrictions for the purpose for
which the asset was constructed have been completed.
All pay items shall be completely installed and all necessary testing as required by the Laws and
Regulations and/or Contract Documents shall be completed.
A list of items to be completed or corrected, prepared by the CONTRACTOR and verified and amended
by the ENGINEER has been performed: The failure to include any items on such list does not -alter the
responsibility of the CONTRACTOR to complete all work in accordance with the Contract Documents.
The CONTRACTOR has completed or 'corrected the punch out work since the date of Substantial Completion. If not
specified in an attachment or in the Contract Documents the CONTRACTOR is responsible for maintenance, heat,
utilities, and insurance.
Morphey Construction Inc.
CONTRACTOR
(d
BY
RECOMMENDED FOR ACCEPTANCE
DATE
CrossRoad Engineers, P.C. July 20, 2012 .
ENGINEER/ARCHITECT BY DATE
The OWNER accepts the work or designated portion whereof as Substantially Complete.
City of Carmel
Department of Engineering
OWNER
ATE