HomeMy WebLinkAboutUnited Consulting/Addl Serv 6/ENG/$89,400/Cool Creek MitigationUnited Consulting
Engineering - 2012
Appropriation 2006 Bond; P.O. #26550
Contract Not To Exceed 889,400.00
ADDITIONAL SERVICES AMENDMENT TO
AGREEMENT FOR PURCHASE OF GOODS AND SERVICES
THIS AMENDMENT TO THE GOODS AND SERVICES AGREEMENT (°Agreement°) entered into by and
between the City of Carmel and United Consulting Engineers (the 'Vendor), as City Contract number 060210.02
dated June 2, 2010 shall amend the terms of the Agreement by adding the additional services to be provided by
Vendor consistent with the Scope of Work attached hereto and incorporated herein as Exhibit "A ". Furthermore, the
terms of the Agreement shall be amended to include the E- verify requirement as stated in Indiana Code § 22 -5-1.7 et
seq., which is attached hereto and incorporated herein as Exhibit "B ", as well as the required E- verify Affidavit,
attached hereto and incorporated herein as Exhibit "C °. The terms and conditions of the Agreement shall not
otherwise be affected by this Additional Services Amendment and shall remain in full force and effect.
IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment as follows:
CITY OF CARMEL, INDIANA
by and through its Board of Public
Works and Safety
By:
Y)(5±
James Brainard, Presiding Officer
Dat
ary
Date:
We
Lori S. , T atson, Memb r
Date: il 4 i
ATT ST:
S
Diana Cordra
Date:
Clerk- Treasurer
9 -ice
UNITED CONSULTING
Authorized Signature
IvfI14 O. At(
Printed Name
V ee PrerrI¢J.71
Title
FID/TIN: 1 /® 64!5
Last Four of SSN�if Sole Proprietor:
Date: fep 6 /0l Zm12
(NL:v.ainatma &I.. edwmUaW■Aoai■rd■v k Goads $c AEagesaam512012∎111ME000NSULTING EMMECRS A ARCHITECTS • ASA$6da:$7no11 MI AM
August 22, 2012
Mr. Dave Richter, P.E., L.S.
United Consulting Engineers & Architects
1625 N. Post Road
Indianapolis, IN 46219 -1995
JAMES BRAINARD, MAYOR
RE: Additional Service Amendment #6, PO # 26550
Dear Mr. Richter:
As we discussed, the City of Carmel has a need for additional professional services and pursuant to our current
contract with United, Contract #060210.02, dated June 2, 2010, I have requested and received from you the
proposed scope of services and fee estimates for the following work task:
Additional Service Amendment #6—
10 -10; Illinois Street Extension, Spring Mill to 106th
Environmental Mitigation Design
Not to Exceed: 89,400.00
Per our contract procedural requirements, 1 hereby approve these Additional Professional Services estimates, and
request that the Board of Public Works ratify the above referenced Contract Amendment.
PLEASE NOTE
Please be advised that "Additional Services" performed on City contracts must be billed separately from the original
contract and other additional services. More importantly, the invoice must reference the appropriate Additional
Service # and P.O. # shown above. Invoices received without the Additional Service # referenced will be returned
for proper identification. Thank you for your continued assistance in providing the City of Carmel with your
professional, quality services. If you should have any questions, please give me a call.
Sincerely,
Michael T. McBride, P.E.
City Engineer
99
Rev'
approve
by:
. C. ngelkin
Director of Adrninistrati
DEPARTMENT OF ENGINEERING
ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439
EMAIL engineering @carmeLin.gov
r
UNITE
1/0"—Consulting=
ENGINEERING'
ENVIRONMENTAL
INSPECTION
LAND SURVEYING
LAND ACQUISITION
PLANNING
WATER &
WASTEWATER
SINCE 1965
OFFICERS
INZia n Hdi. PE
Dave Richter, PE, PIS
Steven W. Jones
Christopher R Pope. PE
B. KO Bryant PE
pfkcha Rout, PE
PROFESSIONAL STAFF
Jerry D. Riche, PE
Andrew T. Woka PE
Devil) L Seater. A4CP
Darryl P.'*Mrhe nger. PE
Adan C. Post PE
M gel S. aphant AICP
E. Ra there Pemberton. PE
TcrnihyJ. Ceares.PLS
Brian W. crag, PE
Jon E. Ocdletxr. PE
Siren R Passey, PE
Howard A Uberioh . PE
KonC.0 4ney.PE
Brian J. Pierson. PE
Christopher L Ham d. PE
Paul D. Gbazbadr, PE
Brian S. Frederick, PE
Jay N. Rides, PE
Chrisbpha J. Dyer, PE
Mathew R tee, PE
Joseph A Rupp. PE
Christopher J. Whr eler. PE
Man R Cults, PE
Jemmy A Rchardson, PE
John P. Sprague. PE
Heather E. Kdgour, PE
Adam J. Greu6ch. PIS
Miley D. Neukam, PE
Key J. laVatey, PE
Mathew A Taybr, PE
Josh 0. Betz. PtS
Darn C. Barret PE
Scott G. Mich, PE
June 20, 2012
Mr. Michael McBride, P.E.
City Engineer - City of Carmel
One Civic Square
Carmel, Indiana 46032
RE: STREAM MITIGATION SUPPLEMENT REQUEST
For reconstruction of Illinois Street from Spring Mill Road to 106th Street
Cool Creek Mitigation Site at Brookshire Golf Course
Dear Mr. McBride:
We have prepared this Supplement Request based on the proposed Illinois Street
relocation and roundabout at 106t Street causing greater than 1,500 lineal feet of stream
impact to Cool Creek. The proposed mitigation site is along another reach of Cool Creek
as it meanders through the city -owned Brookshire Golf Course. We are providing the
attached information related to our request for a supplemental agreement for the
referenced project for your review and approval. It contains the following items:
> Project Location Map
> Description of the Project
> Project Budget Estimate
> Project Manhour Justification spreadsheets
If you have any questions or comments, please contact our office at your convenience.
Sincerely,
ED CONSUL
, P.E.,
enclosures
: File pending (11 -408)
"EXHIBIT _Lilt."
Christopher L. Hammond, P.E.
Transportation Department Manager