Loading...
HomeMy WebLinkAbout0568.95.1l A J A•3 O nC D E E.7 F FIVE STORY PORTION REFERENCE POINT -- -- - - - - - -- -- -- H W COFFEE U Q 21'! OFFICE OFFICE OFFICE Z D 222 1 221 220 I 4 4 A2 Z A 1 . - — - - -- -- - -- o - - - -- - - -- - -- - ELECTRICAL OFFICE Q rc-c 18 17 16 218 15 � 216 F W 13 U 20 RRIDOR = Q LU TM R. �-� l D A;F 223 O PEN AREA 219 MEN WOMEN 225 JANITOR 22"1 ALIGN OFFICE 226 215 lL ) - - - -- - - - - -- - -- - - - - - -- - - - -- - - - - -- -- - - - - -- - -- - 24 a---- 3.7 0 SECOND FLOOR PLAN NORTH SCALE: 1 /8' = 1 ' -0" NOTES OI REMOVE d RELOCATE OLA55 WALL a FRAME AT DOOR #01 IF P055115LE. ONEW WALL, DOOR AND FRAME CONSTRUCTION BY GENERAL CONTRACTOR AT BUILDING OWNER'S C05T. OALL PATCHING OF CARPET AND REFINISHING WALLS, CEILING, RELOCATION OF SPRINKLER HEADS d SUPPLY / RETURN AIR DUCTS DONE BY GENERAL CONTRACTOR AT BUILDING OWNER'S EXPEN5E. Meridian Street VAI A I I I EXISTING WALL TO REMAIN EXISTING WALL TO BE REMOVED NEW WALL CONSTRUCTION SEE SHEET A.2 FOR WALL TYPES NEW 2HR FIRE SEPARATION WALL CONSTRUCTION SEE SHEET A.2 FOR WALL TYPES (CONSTRUCTION BY CONTRACTOR AT BUILDING OWNER'S COST.) NEW 2HR FIRE SEPARATION WALL CONSTRUCTION SEE SHEET A.2 FOR WALL TYPES (CONSTRUCTION BY CONTRACTOR AT BUILDING OWNER'S COST) O 0 APPROVAL FOR CONSTRUCTION THE TENANT AGREES THAT THESE DRAWINGS AND SPECIFICATIONS REPRESENT THE ENTIRE SCOPE OF WORK FOR THE IMPROVEMENTS TO BE PROVIDED. THE TENANT'S SIGNATURE BELOW REPRESENTS ACCEPTANCE OF THE FINAL DESIGN, ANY CHANGES TO THIS SCOPE OF WORK INITIATED BY THE TENANT WILL CAUSE CHANGES IN THE TOTAL COST TO THE TENANT AND IN THE COMPLETION DATE FOR THE PROJECT. DATE imu �w H ;� W oa c� c T O F-' COO) �w H A. LA4 I �� a, OIIMPL� Issue Date ' o� c� c T A. LA4 I �� a, OIIMPL� Issue Date '