HomeMy WebLinkAbout0683.95.9�i��i��u�ii���uin�iiu�iiiin�i���iiuiiu IlllllllullillllllllullNllHllull
I -
PARTIAL FRONT ELEVATION
1/411 = 11-011
5EGON9 FLOOR
1/411 - 11-011
1
0
R 16HT ELEVATION
1/411 = 11-011
Lu
to
NZ
Q
CO
FIRST FLOOR
1/411 = 11-011
17
BUILPIN6 5EGTION
1/411 = 11-011
FOUNDATION
1/411: 11-011
NOTE : ALL 01MEN5IONS ARE FROM FACE OF 5TU0 TO
FACE OF STUD. ALL 5TU05 ARE 3 1/211 UNLE55 NOTED.
ALL 01MEN510N5 PRESENTED HERE ARE FRAM
01MEN51ONS ONLY - 5EE 54T. 1.1 FOR FOUNDATION
FOOTPRINT.
ALL FIR5T FLOOR WINDOW HDR. HT5 TO BE 7' -10"
VERIFY W/ ELEVATION5 AND CORNICE DETAIL5
NOTE:
ERROR5 AND OM15510N5 WF}ICH MAY OCCUR IN THE CONTRACT
DOCUMENT5 SHALL BE BROUGHT TO THE ATTENTION OF THE
ARCHITECT, IN WRITING, AND WRITTEN INSTRUCTION SHALL
BE OBTAINED PRIOR TO PROCEEDIN6 WITH CON5TRUCTION.
THE CONTRACTOR 5HALL 8E HELP R65PON51BLE FOR ANY
ERROR5, 015GREPANCIE5 OR OM15510N5 FOR WHICH THE
CONTRACTOR FAILED TO NOTIFY THE ARCHITECT PRIOR
TO C0145TRUCTION AND/OR FABRICATION OF THE WORK.
G. M I6HAI
WANGOI
Architects / Consul
1365 Shenandoah
Rochester Hib
Michigan 48306
PULT.
MasterBuilc
Project
IND IAN
PIV151(
12220 North Merl
Suite 1185
Carmel, Indiana 4
Subdivision / Plan
2612
Job No.
2612
Date
155UE
Sheet Title
3 GAR
FRONT
ENTRY
OPTION
(REVERSE
N
�O
N