Loading...
HomeMy WebLinkAboutTraffic Memorandum A&F1/4%A of ENGINEERING Transportation & Site Engineering Creating Order Since 1966 WILLIAM J. FEHRIBACH, P.E. OF COUNCIL STEVEN J. FEHRIBACH, P.E. PRESIDENT JOSEPH T. RENGEL, P.E. VICE PRESIDENT R. MATTHEW BROWN, P.E. VICE PRESIDENT RICHARD J. KELLY, P.E. VICE PRESIDENT TRANSPORTATION ENGINEERING STUDIES • TRAFFIC IMPACT ANALYSES STREET DESIGN • HIGHWAY DESIGN • TRAFFIC ENGINEERING PARKING LOT DESIGN • TRANSPORTATION PLANNING STUDIES CONSTRUCTION OBSERVATION • SITE ENGINEERING REGISTRATION INDIANA ILLINOIS IOWA KENTUCKY MICHIGAN OHIO MISSOURI FLORIDA MEMORANDUM DATE: 9/26/12 TO: Steve Pittman Pittman Partners FROM: R. Matt Brown, PE, PTOE A &F Engineering Co., LLC RE: Aramore Project — Westfield Blvd, Carmel A &F Engineering has conducted a cursory site plan review and analysis for the proposed Aramore project as it relates to future traffic impacts within the near -by area. This review included the collection of existing traffic data along Westfield Boulevard, estimates of traffic that will be generated by the proposed Aramore project and the impacts of this traffic on Westfield Boulevard and Maple Lane. The following summarizes the results of the review and analysis: • Based on existing daily commuter patterns and the characteristics of the proposed land use, it is anticipated that approximately 15% to 20% of all traffic generated by the proposed development will utilize Maple Drive. • Current traffic count data and analysis shows that Westfield Boulevard operates with a volume to capacity (v /c) ratio of 0.44 during the weekday peak hour. A v/c of 1.0 represents a roadway that is at capacity and theoretically would not be able to accommodate additional traffic. The current conditions (0.44) indicate that the roadway is at 44% capacity. Traffic projections show that when the traffic from the proposed Aramore project is added the v/c will only slightly increase to 0.50 (50% capacity) during the peak hour. 8365 KEYSTONE CROSSING, SUITE 201 - INDIANAPOLIS, INDIANA 46240 TELEPHONE (317) 202-0864 - FACISMILE (31 7) 202 -0908 • The proposed access drive design along Westfield Boulevard and the proposed addition of a southbound left -turn lane along Westfield Boulevard at the proposed access drive will provide for safe and efficient movements to /from the site. As summarized above, based on the existing traffic data and the traffic projections for the proposed development, the Aramore project will not have a significant traffic impact on the local area roadway network. If you have any questions regarding the information in this memorandum please feel free to contact me. 2