HomeMy WebLinkAbout0684.95.1t
x
J
L1,J
U �
0Q
>- Z
U�
0
_m
161 -611
t NOTE:
SOME COLUMN 17IMEN510N5 ARE FROM CENTER OF COLUMN
TO EXTERIOR FACE OF BA5EMENT WALL.
ERROR5 AND OM15510N5 WHICH MAY OCCUR IN THE CONTRACT
DOCUMENT5 5HALL BE BROUGHT TO THE ATTENTION OF THE
ARCHITECT, IN WRITING, AND WRITTEN IN5TRUGTION 514ALL
Be OBTAINED PRIOR TO PROCEEDING WITH GON5TRUCTION.
THE CONTRACTOR SHALL BE HELP RE5PON51BLE FOR ANY
ERRORS, 015GREPANGIE5 OR OM155IONS FOR WHICH THE
CONTRACTOR FAILED TO NOTIFY THE ARCHITECT PRIOR
TO CONSTRUCTION AND /OR FABRICATION OF THE WORK.
0
co
OPTI ON:
CANTILEVER DECK ABOVE
(UNDER FIREPLACE)
AND BEAR BEAM ON
FOUNDATION WALK
161-611
321-211
CIN
o
`° w
m
I —PHIS BEAM TO BE x
FLUSH TO U.5 OF
11-1011
I�
3o
z
3
I
m
111-i°
�'
N
d-
PLYWD DECK ABOVE
TO CARRY BRG WALL `� n
LOA125 FROM ABOVE IS-I
T--
U-1
"N
OPTI ON:
CANTILEVER DECK ABOVE
(UNDER FIREPLACE)
AND BEAR BEAM ON
FOUNDATION WALK
161-611
321-211
CIN
o
`° w
m
I —PHIS BEAM TO BE x
FLUSH TO U.5 OF
011 THICK N —
WALL HERE
oil
/- TYP BEAM POCK
611 WIDE, ,.
-�-
=� 8° HIGH T PG
FOUNDATION PLAN ' FULL M5EMEN ;
1/411 = 11-011 d
56
42 x 42 x IB GONG. PAD FOOTING
W/ 311 PIA 5TL. COL. CENTERED
F 8x21 5TL BEAM
r W,
M
L- -J
1011 THICK
WALL HEF
321-211
1110
1-31
N K
N
V1 M
I d-
I _ o
o �
I o —
II
311
�I3
w° I
w _°C
lf) —
N K
` cV
K'1 �
� SUMP
UJ
81-011
11-1011
I�
3o
z
3
I
m
111-i°
�'
-
d
I
PLYWD DECK ABOVE
TO CARRY BRG WALL `� n
LOA125 FROM ABOVE IS-I
T--
U-1
"N
° 0
3611 x 3611 x 1611 GONG. PAD FOOTING
P.F�-
=K
W/ 311 PIA 51L. COL. CENTERED
N
I
FLU51-1 TO U.5. OF
W8x21 5TL BEAM
PLYWD DECK ABOVE
7 PG
T PG
�o
TO CARRY BRG PALL
3011 x 3011 x 1211 GONG. PAD FOOTING
W/ 311 DIA 5TL. COL. LEUTERED
I
ui
6A5EMENT
LOAP5 FROM ABOVE
a
u�
_
_1
m
g I
4° GONG. 5LAB ON MIN
11_101
° o
°i
91 -0n
411 COMP. 5AND FILL
N
BLEEDER
L
o v,
I
i
O
3
II II II
011 THICK N —
WALL HERE
oil
/- TYP BEAM POCK
611 WIDE, ,.
-�-
=� 8° HIGH T PG
FOUNDATION PLAN ' FULL M5EMEN ;
1/411 = 11-011 d
56
42 x 42 x IB GONG. PAD FOOTING
W/ 311 PIA 5TL. COL. CENTERED
F 8x21 5TL BEAM
r W,
M
L- -J
1011 THICK
WALL HEF
321-211
1110
1-31
N K
N
V1 M
I d-
I _ o
o �
I o —
II
311
�I3
w° I
w _°C
lf) —
N K
` cV
K'1 �
� SUMP
UJ
81-011
— I— — — — — — �— w WATER ANP SEWER
5EE ELEVATION5 FOR I I OI UJ ENTRANCE LOCATION
FOUNDATION LAYOUT m
IN THI5 AREA NOTE:
w PROVIPE (2) 04 REBAR, TEN FT.
21 -611 161 -411 2'-611 121 -811 81 011 141-8° LONG TO 5PAN UTILITY TRENCH
m
211-411 351-411
FOUNPAT I ON PLAN
1/411 - 11 -011
G. M IGH
WANG(
Architects / Go
1365 5henandc
Rochester Hill
MicFagm 483(
Master BL
Project
INDIA
0IV15
12220 North N
Suite 1185
Carmel, Indian
Subdivision / Pia
2612
Job No.
2612
Dote
155UE
REV I
REV 2
REV 3
Sheet No.
I • I
N 5HT
N
I�
T--
HI5 BEAM TO BE
FLU51-1 TO U.5. OF
PLYWD DECK ABOVE
�o
TO CARRY BRG PALL
I
LOAP5 FROM ABOVE
a
11_101
8i -In
91 -0n
�
11 -611 �1_�e
L
I
i
J
♦Y °
° x 8° x 16° CMU
2 0 I
GOUR5E5 ON
30"x3011x12"
°o
X
GONG PAP FTG
"'
W8x15 51L BEAM
°
>-
-�
-J
2x4 FRAME
CRAWL 5PAGE
FOR ACCE55 PNL
3 -Zx10 HDR
m
m
SEE DETAIL PER SPEC
2 -2x4 P05
�o
`n
I
o
o
LEAD WALL PAST
OVER DIG
I
PG
6011 x 2411 CRAWL
3
6
ti
`O
I
( IIIZ ACCE56 AND HVAC
GHA5E OPENIN
N
41-1011
I
°
oc SUMP
_
LEAD WALL PAST
w
w
`O
OVER DIG
1
I 1
EARNG WALL 811 X 1611
I
THICKENED 5LAB BELOW
1
I I
' d
Kpc
O
PL
p
3
1
;` Qd
®
%`d
oo
°
0� III
v > c
° 11' III N
m "'
-
3
p -
�
TYP BEAM POCKET:
61 WIPE,
5° DEEP.
w
�--
`r4 -
14 REBAR 0 24" O.G., T' LONG
B EEDER
- - -
0
°
°
811 HIGH
TO SPAN OYER-DI
'
'
'_ '
121 311
S 81 -I I II211
WBxlB 5TL Bf
1 /2°
I
–
�
_ _
I 1
N
30 °X30 °XIZII
BLEEDER
UNEXGAVATE�
N
"
- - -
5A5EMENT 44 LOCATTION5
I
411 GONG. SLAB ON MIN
I
i
12O 411 CONC. 5LA13 W/
I
_
411 COMP. 5AND FILL
MIN. 411 GLEAN COMP. 5AND FILL
N
I
I
o
0
T PG
o
v
' PG
PG
- --
0
0
E STEM WALL DETAIL
PER SPEC
1
1 102 c
°o
0
g
1
1 i
N
W/ 50URBRICK LEDGE
FrI
84° POURED HT ON
w
I _
811 x 20° CONT. 5PREAP
LEAP OV R 1216 PAST
- - -
I
—1 I
ffF
F00T1
I 'O
-
o L
— -
-��
W
I I
N
Lr-
- - - - -
- -
- -
-
— I— — — — — — �— w WATER ANP SEWER
5EE ELEVATION5 FOR I I OI UJ ENTRANCE LOCATION
FOUNDATION LAYOUT m
IN THI5 AREA NOTE:
w PROVIPE (2) 04 REBAR, TEN FT.
21 -611 161 -411 2'-611 121 -811 81 011 141-8° LONG TO 5PAN UTILITY TRENCH
m
211-411 351-411
FOUNPAT I ON PLAN
1/411 - 11 -011
G. M IGH
WANG(
Architects / Go
1365 5henandc
Rochester Hill
MicFagm 483(
Master BL
Project
INDIA
0IV15
12220 North N
Suite 1185
Carmel, Indian
Subdivision / Pia
2612
Job No.
2612
Dote
155UE
REV I
REV 2
REV 3
Sheet No.
I • I
N 5HT
N