Loading...
HomeMy WebLinkAbout0685.95.11I 51PE ENTRY GARAGE 1/4" = I1-0" COURSE SILL W P5 0 95 PARTIAL LEFT ELEVATION 1/411 = 11-0" 1860 3660 1860 ALIGN WINDOWS W/ BELOW - SEE FRONT ELEVATION El PARTIAL 5EGONO FLOOR PLAN 1/4" = I' -e - 4 6'-6" 4254 8' -611 4254 71-111 0 SEE CORNICE DETAIL PER SPEC SOLDIER COURSE -----,,, Ix6 TRIM ----- Ix TRIM PER 51"EC Ix6 TRIM ON MDO BD PANELS PER 5PE - - 1x6 TRIM ON ADD BD PANELS PER 5PEC.- .v 1 n11v1 1 VV V1\ 1 V / %19 1/4" = 11-011 - 14'-0" L----- NOTE •1•/ WTLINE 15 THE SAME AT SLAB OWATION AND BASEMENT OPTIONS. PARTIAL FOUNPAT ION PLAN 1/4" = 1' -0" n JII 'CONT. RIDGE VENT PER SPEC ROOF SHINGLES PER SPEC 12 Zx LAYON TRIM 2xb TRIM E30XOUT AT ENTRY SEE DETAIL PE MEMO DETAIL PER 5F-- - - -- - ■■■■ ■ ■E■ ■■■■ MEMO CORNER ■E■■ IMMEM ■ 1• r 11111111111Ila1 ■■■■■ _ MEN ■ E■ ■E ■■■■■ �I - -- ■■■■■ ■■■■■ ■■ ■■■ Nil AN np IN ow IN SO IN Illlnllllli� �111111!111�I IN - - - ■ice ■G: it I r i I r 1 i/ 05 AT WALL BEYOND FRONT ELEVATION 1140 = I' -OR COURSE ROWLOCK Ix STACKED TR11 V V PARTIAL RIGHT ELEVATION 1/411 = 11_011 G. M WAN Architect 1365 5h4 Rochest Michigan n Project I N P 0IV 12220 Nc Suite f18 Carmel, 5ubdvwm 225 Job No. 225 Date 155UE REV I y ��Ii1r ON E E-3 A TA Shut No. 7 N N N 1'-0 1/211, 'CONT. RIDGE VENT PER SPEC ROOF SHINGLES PER SPEC 12 Zx LAYON TRIM 2xb TRIM E30XOUT AT ENTRY SEE DETAIL PE MEMO DETAIL PER 5F-- - - -- - ■■■■ ■ ■E■ ■■■■ MEMO CORNER ■E■■ IMMEM ■ 1• r 11111111111Ila1 ■■■■■ _ MEN ■ E■ ■E ■■■■■ �I - -- ■■■■■ ■■■■■ ■■ ■■■ Nil AN np IN ow IN SO IN Illlnllllli� �111111!111�I IN - - - ■ice ■G: it I r i I r 1 i/ 05 AT WALL BEYOND FRONT ELEVATION 1140 = I' -OR COURSE ROWLOCK Ix STACKED TR11 V V PARTIAL RIGHT ELEVATION 1/411 = 11_011 G. M WAN Architect 1365 5h4 Rochest Michigan n Project I N P 0IV 12220 Nc Suite f18 Carmel, 5ubdvwm 225 Job No. 225 Date 155UE REV I y ��Ii1r ON E E-3 A TA Shut No. 7 N N N