Loading...
HomeMy WebLinkAbout0724.95.18SUPERVISOR WORKSHEET I RYLAND FOUNDATION CHECKLIST FRAME PUNCH -OUT CHECK LIST 1. GARAGE BASEMENTGARAGE SLAB GARAGE DOOR OPENING FRAMED TO CORRECT SIZE: I' HT., 8' OR 16' WIDE. _ ATTIC ACCESS FRAMED TO CORRECT SIZE AND LOCATION. PROJECT INFORMATION PROJECT INFORMATION _ NAILER5 AT ALL CORNERS OF GARAGE AND CEILING. GARAGE STEP FRAMED AND KICK PLATE UNDER DOOR BOW STUDS STRAP ANCHOR NAILED CORRECTLY LUMBER RACK BUILT 4 EXTRA MATERIAL STACKED ON HOUSE NAME / ELEV. HOUSE NAME / ELEV. 2. HOUSE CHECK FOR BOW STUDS SET NUMBER SET NUMBER _______ CHECK FOR HAILERS MARK DOOR SWING DIRECTION AND SIZE PLAN / JOB NUMBER PLAN / JOB NUMBER ___ ____ CHECK FOR CAS!NG ROOI`! (MIN. 2" ON EACH SIDE) CHECK CENTERLINE OF KITCHEN WINDOW CHECK BULKHEAD DIMENSIONS STANDARD OR REVERSED STANDARD OR REVERSED _ .___ HECK WALL SIZES IN RELATION TO CABINET SPACE CHECK VANITY 5iZE5 !N RELATION TO WALL SPACE ANY NON -STD. CHANGES? ANY NON -STD. CHANGES? - - - - - -- CHECK VANITY DEPTH TO DOOR OPENING (MIN. 241/2") CHECK DOOR OPERATION AND INSTALLATION FRONT OR SIDE LOAD FRONT OR SIDE LOAD - - -- - CHECK WINDOW OPERATION AND INSTALLATION -- - - - - -- CHECK BASEMENT STAIR AND 2nd FLOOR STAIR INSTALLATION PITCH RAIL WALL !N51ALL_ED 1/2" BELOW STRINGER STD., ENLARGED, OR FULL BSMT. ALL SIDING OR BRICK FRONT __________ HALF -WALL 42" FROM FLOOR AND SAME PITCH 45 STAIRS (BOTH STAIRWAYS) (IN SET w) (OPT. 293) (OPT. 295) (IN SET Mi (OPT. 490) HALF -WALL. AT STAIRS PAST 57RINGER 1 1!2" TUB F'LATFOR­t BUILT CORRECTLY Ito 1/2" HT., 39" X 51" INSIDE ALL SIDING OR BRICK FRONT _ ______ NO STUDS 0 24'1 O.G. AT CERAMIC AREAS. (16" O.G. MAX.) (IN SET 0) (OPT. 490) MASONRY TUB BLOCKS INSTALLED AT CERAMIC AREAS. FIREPLACE OPT. PRE -FAB NAILER5 FOR FIBERSLA55 TUBS INSTALLED BSMT. WINDOW OPT. QTY. NOTE: INSTALL BRICK LEDCsE ON MASONRY KiREPLACE5 _- MEASURE VINYL AREAS FOR SQUARE (MARK LOCATION(5) ON PRINT CB PANELS HAVE BLOCKS ON ENDS BUILDING PERMIT NUMBER _ CHECK FOR LOAD - BEARING POINTS IN HOUSE AND PROPER LOAD TRANSFER FRONT PORCH WALL HT. T O B E _- - STRAP ANCHORS SECURED IN HOUSE ABOVE TOP OF F T N . WALL - - - - - - -- CRAWL SPACE AND BASEMENT CLEANED OUT FLUSH W/ 9 1/4" let FLR. T.J.f.'s / 2" ABOVE W/ 11 1/8" let FLR TJ.!.'s / Co' ABOVE W/ 14" tat FLR. TJ.L`a — - -- 57AIR'WAY SHIMMED (MAX. 1/2" GAP EACH SIDE) let AND 2nd FLOORS LINE UP IN STAIR WELL MASONRY _ _.__ NO GAPS ABOVE STAIRWAY DRAFTSTOP FIREPLACE OPT. PRE -FAB —____— STAIRWAY DROP CEILING DONE CORRECTLY (CHECK PRINTS) RISER INSTALLED AT TOP BASEMENT STEP NOTE: INSTALL BRICK LEDGE ON MASONRY FIREPLACES HANDRAIL BLOCKS INSTALLED 32" FROM STAIR NOSING BUILDING PERMIT NUMBER CHECKLIST __ SAFETY BOOTS AND RAILS INSTALLED STRONGBACK IN FLOOR TRUSSES BLOCKED AND NAILED TIGHT CHECKLIST _____.__ ^,ARK OUT ALL HAUNCHES NOT L46ED _ ____ FLOOR 5HEATHiNG NAILED PER SPEC.'S MARK 'N FRONT PORCH WALLS IF NOT ON PRINTS - -- FALL PROTECTION INSTALLED AT STAIR WALL OPENINGS SUMP PUMP LOCATION MARKED WATER SLEEVE LOCATION MARKED —_ ^_ EYEBOLT AND ANCHOR POINT IN PLACE 5UMP PUMP SLEEVE LOCATION ►"LARKED ALL DRAFT STOP INSTALLED ON CHASE AND BAND JOISTS MARK OUT ALL HAUNCHES NOT USED - - - HIGHL +CsNT ALL TH GKENED SLAB FOOTINGS _�. ALL TYVEGJG STAPLED IN-PLACE EXTERIOR MARK IN FRONT PORCH WALL IF NOT ON PRINTS - -- H!G4- +LIGHT ALL PAD FOOTING LOCATION5 ALL HOLES PATCHED IN INSULATION BOARD SEWER AND WATER SLEEVE LOCATIONS MARKED _— _ ALL TRIM INSTALLED PER PRINT (3'W/ 4" SEWER COUPLER, 5' W/ 1 1/2" SLEEVE) 3 1!2" RIPS 1./2 SHEATHING INSTALLED ON CORNERS HIGHLIGHT ALL BEAM POCKETS ALL WINDOWS TAPED ON TOP AND GLUED ON FOUR SIDES HIGHLIGHT ALL PAD FOOTING LOCATIONS ALL DOORS TAPED ABOVE PRINT HUNG ON NAIL IN GARAGE DO NOT REMOVE BLUEPRINTS FROM JOBSITE — PERIMETER AND PANELS GLUED INTERIOR WALLS GLUED DOWN INTERIOR AND EXTERIOR WALLS NAILED INTO TRUSSES BELOW 1. EXCAVATOR PLACE PRINT TUBE INSIDE OF EXCAVATION. SET TUBS INTO ROOM AND WIPE -OUT ATTIC ACCESS INSTALLED IN HOUSE PER PRINT, 12" SIDES 2. WALL CONTRACTOR LEAVE ON TOP OF WALL. __ _ ALL WINDOWS INSTALLED PER PRINT, ELEVATION AND STACK 3. PLUMBING CONTRACTOR LEAVE ON TOP OF WALL. 3/4" BLOCK UNDER CENTER OF DOUBLE WINDOWS FRONT AND 51DES JOIST HANGERS NAILED 4. CONCRETE CONTRACTOR LEAVE ON TOP OF WALL. SITE PICKED AND PUT PILE DAY 2X4 AROUND TOP OF CHIMNEY, l 1/2 PAST CHIMNEY FLAT T 21' PA ALL GIRDER TRUSSES NAILED PER ENGINEERING