HomeMy WebLinkAbout0727.95.5SQUARE FOTTAaE
FIRST FLOOR 1962 S.F.
SECOND FLOOR 833 S.F,
UNFIN. BASEMENT 1111 S.F,
GARAGE 609 S.F.
TOTAL LIVING 2195 S.F.
PURLINS REQID AS NOTED BELOW
PURLIN BRACING 6 I11-6" MAX
HORIZONTAL, PURLIN TO BE
2 -2X6, WI 2X4 VERTICAL SUPPORTS
648 a O.C. 6 MIN. ANGLE 45 DEGREES
DOWN TO BEARING WALL.
2X4 NAILER W/ IX BRICK BOX
4' BRICK VENEER
I
I
1° ° I
BLOCK FOUNDATION
1/2" NIGH R SHEATHING
BATT INSUL
2'X4' STUDS 0 16" O/C
CRAWL SPACE
6MIL POLY VAPOR BARRIER
OVER 4" MIN. PEA GRAVEL
2 "X10" RIDGE BOARD
SHINGLES AS SPECIFIED ON 15*
FELT PAPER ON 1/2' ROOF SHEATHING
2'X6" RAFTERS 9 16' O/X
–1 "X4" COLLAR TIES
•
2 "X4" JOIST TIES 9 12' O/C
k 11 — 21X6' CEILING JOISTS 6 16" O/C
2X10 FLOOR JOIST 0 Ib" OZ,
OR AS REQUIRED
2X4 TREATED PLATE W/ 1/1' dIL -�
ANCHOR BOLTS 6 48" O.C. I °
OR AS REQUIRED
a
°
3' die POST BURIED °
IN WALL ON 36 "X36'X12" PAD °
a
°
-- 4" CONC, SLAB OVER
- -- 4" MIN. GRAVEL FILL ! °
°
TYPICAL SECTION
SCALE' 1 /4" -- 11-011
R- VALUES - SIVNG
1/2" DRYWALL R- 45
INSIDE AIR FILM R- b8
BATT INSULATION R- 13DO
R -BOARD R- 4.60
OUTSIDE AIR FILM R- .1l
3/4" WOOD SIDING R- 1,05
TOTAL R -VALUE R- 19.95
0
I
- VALUES= - BRICK
111" DRYWALL
R-
A5
INSIDE AIR FILM
R-
b8
BATT INSULATION
R-
13DO
R -BOARD
R-
41p0
OUTSIDE AIR FILM
R-
.11
3/4" AIR SPACE
R-
!AI
4" BRICK VENEER
R_.13
TOTAL R -VALUE
R-
20,64
I
1X6 GUTTER OVER 2X6 SM FASCIA
3/8" SOFFIT W/ VENT
i
1X6 FRIEZE BOARD Q
8 "X9' POURED CONCRETE
FOUNDATION WALL
8" X 16" CONTINUOUS REINFORCED
CONCRETE FOOTING
tA
� p u
_ cA
� m
s�
L
{r
L
DATE= 6 -26
DRAWN BY: JJ40
SCALE= AS I
REVISIONS:
OF
w
}
r a
L u
Q
m
w
u
Lu
� n
1 K-
Z
10
Q
"'
a-
w
-A
N
LL
�
W
U
d)
cv
z
�
1
DATE= 6 -26
DRAWN BY: JJ40
SCALE= AS I
REVISIONS:
OF
w
}
r a
L u
Q
m
� n
Z
ul
U
w
LL
U
d)
cv
z
�
o
dP
DATE= 6 -26
DRAWN BY: JJ40
SCALE= AS I
REVISIONS:
OF