Loading...
HomeMy WebLinkAbout0737.95.2c n r i w� nn FOUNDATION BASEMENT F----'LAN G/ AI C I /A "— p—,.y. J � N - FIN. FLR, 22' -3" 12'- I " 4" BRIGK LEDGE BLOCK 2q' -8" GONG. FOOTING GARAGE SLAB 0 GONT. GONG. BLOCK 5' -6" II' -4" 5' -5" 3' -O" 61_1" 3' -0" GONG. FOOTING 8' -8" W/ (2) #5 BARS 21' -0" GONT. PROOFING WATER PROOFING 14' -0" PERIMETER DRAIN --1 4" GANG f- SLAB DRAIN F- 4" GONG. SLAB ` 14'x 10' - - - - -- = GONG. PATIO O-------- m EASY -BUCK ALUM. EASY -BJGK ; GR1�1L SPGE WINDOW �AREAWELL WINDOW I i PEA GRAVEL BED I I -- - - - - -- - -- - - - -- - - - --- ----- - - - - -- I I -- - -- --i L-------------------- - - - - -J I L---- - - - - -- -- - -- - -` - -- - - - -- f� - ------------------------------------------ I - I _ r----------------------------------------------------------- ---------------- - - - - -- -- - - - - -- ---------------------- - - - - -- -- - - - - -- 32 "X 24 "------------ - - - - -- ------ - - - --I r--------------------- - - - - ------- - - - - -- ------ - - - --I GRAWL ACCESS I I I I I I I I I I I I I ; O I I I tr _ _ I I m® I I (no Q -7 I 1 I 1 I 7' -2 I12" N ; I I I ' i --- - I I - - - -- t ; I I I I I I I I I GRAINL c� I I I ' PEA GRAVEL BED - - - - - -- 14' -7" i — — — = I Iq' -10 1/2" I I 20' -4" 7' -3 I12" 7' -3 I12" I — — -I I r 10' -O 3 -2 I /4" q' -10 14" i 10. -4" - (- FRAME LAM BEAM I I I FOR 2/4 DOOR I = - - r LAM BEAt1 I I - -LAM BEAM i i - LAN1 BEAM ; ;_ - I -LAM BEAM - - I r I 16" x SII L J — — — ' GONG. — — — 5 1/2" LA L — J GOL.ON 36" ; I I - -- - 16" X 16" PILASTER ; I THIGKENED PILASTER 5 1/2" LAM.COL. SLAB 50. A2" GONG. PADS I GAS ; 8x8 1 BEAM BLOCK PIER ON 3OX30 ' I CON PADS __ -- - -- - -_ 2/6 FUR. ; I �� ij�l POCKET t =UJ PAD I I - _ _ � 1 5' 1 /2.I -1 7 t CATER I i; it %J - I( f_ ROUGH -IN I ry BATH cm UNFINISHED - v H T 1 c(� - I I F ENE 1 _� 1 r_ < N 4" GONG. SLAB W/ 4" PEA GRAVEL BED m ® E T R SUMP I I (3 d) -7 j GFF I i U I I I I = I 1 -- --- - - - - -- -' ----------- - - - - -- --------- I - - - - -� L - - - - -- I I i , - t s) ---- - - - - -- - -- _ I 12' -I" r 5' -q" i i i I 4" BRICK LEDGE j I PROVIDE LEAD WALLS I t sn AS REQUIRED I , I u� I I I I I I L - - - -- - - -- - ' -------------------- - - - - -- - -- ,; I / __ _ 7 / I / _ ------------ -------------------------------------- i I I I I 1 i I I I I I I I I m I i I I ; SLOPE GONG. SLAB ABOVE 1 /8" PER FT TOWARDS GARAGE DOOR OPENINGS ABOVE I I I ; i wZ I mz I i I Q� N UNEXGAVATED Q m ; IL 0 I 4" GONG. SLAB ON i i w O I ; b m 4" COMP. SAND FILL I m I I I I I m I IT I 1 I r I I I I I I N I , I I I I OUO I i I I I LZCQ I I O _ _ I'------ I - - - - -- ---------------- - - - - - -- -------------- - - -- -1-7 , ------------------------------------------ --------------- - - - - -� I Lj - - - - -- 24'-6" 64' -O" L f v FOUNDATION BASEMENT F----'LAN G/ AI C I /A "— p—,.y. J � N - FIN. FLR, CV - 4" GARAGE FIN. FLR. 4" BRIGK LEDGE BLOCK SLAB GONG. FOOTING GARAGE SLAB 0 GONT. GONG. BLOCK 16 "xb" DEEP GONG. FOOTING WATER W/ (2) #5 BARS GONT. PROOFING WATER PROOFING PEP IMETER PERIMETER DRAIN --1 4" GANG f- SLAB DRAIN F- 4" GONG. SLAB 16" WIDE x 8" DEEP GONG. FTG. W/ (2) #5 BARS CONT. N = FIN. FLR. PORCH SLAB OGONG. BLOCK 16 "xb" DEEP GONG. FOOTING GARAGE SLAB c�I GONT. GONG. BLOCK 16 "xb" DEEP GONG. FOOTING W/ (2) #5 BARS GONT. 16' WIDE x b" DEEP GONG. FOOTING W/ (2) #5 BARS GONT. N = FIN. FLR. PORCH SLAB OGONG. BLOCK 16 "xb" DEEP GONG. FOOTING N (2) #5 BARS GONT. FOUNDATION DETAILS 36" TALL HALF WALL w/ GAP MOOD PLANK FLOORING Ix TREAD MATERIAL 11 7/8" FL F-. JST. _ 2x12 --- STRINGER-,\'l HAND _ RAILS - rc) N 6 WALL 9 / �1 \-GARRIGE BD. (14) q" TREADS = 10' -6" TOTAL RUN (14) 7 7/8" RISERS q' -2 1/4" = TOTAL RISE STAIR DETAIL SCALE: 1/4"=I'-0" 2x12 LANDING FOUNDATION NOTES: 1. ALLOWABLE SOIL PRESSURE 2000 PSF. 2. FLOOR SLAB AREAS TO BE COMPACTED TO c115% MAX. DRY DENSITY. 3. STANDARD BASEMENT AND GARAGE SLAB 'TO BE 4" CONCRETE ON 6 MIL. VAPOR BARRIER OVER 4" GRAVEL FILL. 4. 5TRUGTURAL CONCRETE FOOTING TO BE 2500 P51, 5LAB5 3500 PSI, 5. BOTTOM OF ALL FOOTINGS TO BE SET BELOW LOCAL FROST LINE. SEE DETAIL5. 6. PROVIDE ANCHOR BOLTS 1/2" PIA. x10" STARTING 9 b" FROM EACH CORNER @ b' -O" O.G AND AT EACH SIDE OF ALL OPEPlilNGS, MIN. (2) PER PIECE OF SILL. Design Loads: FLOOR 40 PSF LIVE LOAD 10 PSF DEAD LOAD ROOF 30 PSF LIVE LOAD 10 PSF DEAD LOAD Design Loads: I. THE CARPENTER SHALL GAREFULLY LAY OUtT AND ERECT ALL STRUCTURAL MEMBERS OF ROUGH CARPENTRY, FRAMING, SHEATHING, AND BRIDGING. ALL MEMBERS SHALL BE PROPERLY PLUMBED, LEVELED, AND BRACED UNTIL ALL STRUCTURAL CONNECTIONS ARE IN PLACE. A SUFFICIENT NUMBER OF NAILS, SGREW5, AND BOLTS SHALL BE USED TO INSURE THE RIGIDITY OF THE CONSTRUCTION. e 2. FRAMING LUMBER SHALL CONFORM WITH NATIONAL DESIGN SPECIFICATIONS FOR STRESS GRADE LUMBER AND I1-5 FASTENINGS. JOISTS AND ALL OTHER: NO.2 DOUGLAS FIR LARCH OR YELLOW PINE Fb = 1450 psi F( = 1000 p51 E = 1,160,000 pal 3. ALL FIRST FLOOR SILL PLATES, CRAWL SPACE FRAMING, A10 STRUCTURAL MEMBERS EXPOSED TO WEATHER SHALL BE WOLMANIZED PRESSURE TREATED. 4. ROOF TRUSS DESIGN, SPECIFICATION, AND ERECTION PROCEDURE TO BE SUPPLIED BY THE TRUSS MANUFACTURER. 5. MICRO -LAM BEAM STRUCTURAL PROPERTIES, Fb = 2b00 psi Fc = 2-100 p51 E = 2,000,000 psi 6. PROVIDE DIAGONAL BRACING AT ALL EXTERIOR CORNERS. -1. FRAMING OVER GIRDER AND BEARING PARTITIONS. JOISTS MAY BE BUTTED TOGETHER OVER THE CENTER BEARING, PROVIDE JOISTS ARE TIED TOGETHER, OR JOISTS MAY BE LAPPED AND NAILED TOGETHER. MINIMUM LAP, 4 INGHE5; MAX. OVERHANG, 12" 5. FLOOR JOISTS SHALL BE DOUBLE UNDER EACH PARALLEL PARTITION. q. BRIDGING. MAXIMUM SPACING 10'. BRIDGING SHALL BE GROSSBRIDGING USING 1x3 INCH BOARDS OR SOLID BRIDGING OF JOIST DIMENSION. SET SOLID BRIDGING IN AN OFFSET FASHION. 10. WALL $ PARTITION FRAI -LING. UNLESS OTHERWISE SHOWN 5PAGE STUDS @ 16" O.G. DOUBLE STUDS AT OPENINGS. CONSTRUCT PARTITION GORNERS WITH NO LESS THAN 3 FULL MEMBERS. WALLS AND BEARING PARTITIONS 5HALL HAVE DOUBLE TOP PLATES. PLATES RESTING ON MASONRY OF GONGRETE SHALL BE ANCHORED WITH BOLTS. II. GLUE SUB -FLOOR USING RECOMMENDED ADHESIVE, APPLY GLUE BEAD TO FRAMING AND ALONG PANEL GROVE EDGES, NAIL W/ 100 NAILS @ 12" O.G. 12. PROVIDE NAILER5, NAILING STRIPS, AND GROUNDS AS NECESSARY AND RIGIDLY SECURE IN PLACE FOR ATTACHMENT OF TRIM, FINISH, AND OTHER WORK. 13. JOIST HANGERS ® ALL FLUSH BEAMS SHALL BE MIN. 16 GALV. STEEL, AND PROPERLY SIZED TO ACCEPT JOISTS. O u`� Q_ Q� 1 7as Olt 0 T n� V 1 r OIW D` u`� Q_ Q� 1 7as Olt 0 T n� V 1 r OIW D`