HomeMy WebLinkAbout0738.95.24SUPERVISOR WORKSHEET I ItYLAN D
FOUNDATION CHECKLIST
FRAME PUNCH -OUT CHECK LIST
II
1. GARAGE
BASEMENTGARAGE
SLAB
GARAGE DOOR OPENING FRAMED TO CORRECT SIZE- 1' HT., 8' OR I6' WIDE.
ATTIC ACCESS FRAMED TO CORRECT SIZE AND LOCATION.
PROJECT INFORMATION
PROJECT INFORMATION
_NAILERS AT ALL CORNERS OF GARAGE AND CEILING.
GARAGE STEP FRAMED AND KICK PLATE UNDER DOOR
BOW STUDS
STRAP ANCHOR NAILED CORRECTLY
LUMBER RACK BUILT t EXTRA MATERIAL STACKED ON
HOUSE NAME / ELEV.
HOUSE NAME / ELEV.
2. HOUSE
CHECK FOR BOW STUDS
SET NUMBER
SET NUMBER
CHECK FOR NAILERS
MARK DOOR SWING DIRECTION AND SIZE
PLAN / JOB NUMBER
PLAN / JOB NUMBER
_- CHECK FOR CASING ROOM (MIN. 2" ON EACH SIDE)
KITCHEN WINDOW
CHECK CENTERLINE OF
_ CHECK BULKHEAD DIMENSIONS
STANDARD OR REVERSED
STANDARD OR REVERSED
CHECK WALL SIZES IN RELATION TO CABINET SPACE
_ CHECK VANITY SIZES IN RELATiON TO WALL SPACE
ANY NON -STD. CHANGES?
ANY NON -STD. CHANGES?
—_—CHECK VANITY DEPTH TO DOOR OPENING (MIN. 241/2")
CHECK DOOR OPERATION AND INSTALLATION
FRONT OR SIDE LOAD
FRONT OR SIDE LOAD
._CHECK WINDOW OPERATION AND INSTALLATION
STAIR INSTALLATION
-- CHECK BASEMENT STAIR AND 2nd FLOOR
PITCH RAIL WALL INSTALLED 1/2" BELOW STRINGER
STD., ENLARGED, OR FULL BSMT.
ALL SIDING OR BRICK FRONT
________ HALF -WALL 42" FROM FLOOR AND SAME PITCH AS STAIRS (BOTH STAIRWAYS)
(IN SET °) (OPT. 293) (OPT. 295)
(!N SET "% (OPT. 4c3O)
—` -- HALF -WALL AT STAIRS PAST STR!NGER 1 1/2"
TUB PLATFORM BUILT CORRECTLY 16 1/2" HT., 39" X 51" INSIDE
ALL SIDING OR BRICK FRONT
MASONRY
______ NO STUDS m 24" O,C. AT CERAMIC AREAS. (I6" O.C. MAX.)
(IN SET •) (OPT. 490)
_ TUB BLOCKS INSTALLED AT CERAMIC AREAS.
FIREPLACE OPT. PRE -FAB
NAILERS FOR FIBERGLASS TUBS INSTALLED
BSMT. WINDOW OPT. QTY.
NOTE: INSTALL BRICK LEDGE ON "ASONR`!" FIREPLACES
MEASURE VINYL AREAS FOR SQUARE
(MARK LOCATION(5) ON PRINT
—_.___ GB PANELS HAVE BLOCKS ON ENDS
BUILDING PERMIT NUMBER
CHECK FOR LOAD - BEARING FONTS IN HOUSE AND PROPER LOAD TRANSFER
�._____
FRONT PORCH WALL HT. TO BE
STRAP ANCHORS SECURED IN HORSE
ABOVE TOP OF F T N ■ WALL
- — CRAWL SPACE AND BASEMENT CLEANED OUT
FLUSH W/ 9 1/4" let FLR. T-11's / 2" ABOVE W/ 11 1/8" let FLR. TJ.I.'e / 6" ABOVE W/ 14" let FLR. T.J.I, s
— STAIRWAY SHIMMED (MAX. 1/2" GAP EACH SIDE)
18t AND 2nd FLOORS LINE UP IN STAIR WELL
MASONRY
_. _. NO GAPS ABOVE STAIRWAY DRAFT5TOP
FIREPLACE OPT. PRE -FAB
_ _ STAIRWAY DROP CEILING DONE CORRECTLY (CHECK PRINTS)
RISER INSTALLED AT TOP BASEMENT STEP
NOTE: INSTALL BRICK LEDGE ON MASONRY FIREPLACES
HANDRAIL BLOCKS INSTALLED 32" FROM STAIR NOSING
BUILDING PERMIT NUMBER
CHECKLIST
--- -- - 5AFEn- BOOTS AND RAILS INSTALLED
STRONGBACK IN FLOOR TRUSSES BLOCKED AND NAILED TIGHT
CHECKLIST
MARK OJT 4"L HAUNCHES NOT USED
FLOOR SHEATHING NAILED PER SPEC.'S
_
MARK !N FRONT PORCH WAL4_5 IF NOT ON PRINTS
FALL PROTECTION INSTALLED AT STAIR WALL OPENINGS
SUMP PUMP LOCATION MARKED
- - -- M
WATER SLEEE � ty OGAT!OARKED
W '✓
E`Y'EBOLT AND ANCHOR POINT IN PLACE
SUMP PUMP SLEEVE LOCATION MARKED
ALL DRAFT STOP INSTALLED ON CHASE AND BAND JOISTS
MARK OUT ALL HAUNCHES NOT USED
v _ >- ►�GHLi�sHT ALL THICKENED SLAB FOOTINGS
_ ALL TYVECK STAPLED IN -PLACE EXTERIOR
MARK IN FRONT PORCH WALL IF NOT ON PRINTS
- - - - -- HIGHL!GLiT ALL PAD FOOTING LOCATIONS
ALL HOLES PATCHED IN INSULATION BOARD
—`
SEWER AND WATER SLEEVE LOCATIONS MARKED
ALL TRIM INSTALLED PER PRINT
(3' W/ 4" SEWER COUPLER, 5' W/ 1 1/2" SLEEVE)
--3 1/2" RIPS 1!2 SHEATHING INSTALLED ON CORNERS
HIGHLIGHT ALL BEAM POCKETS
_�_
ALL WINDOWS TAPED ON TOP AND GLUED ON FOUR SIDES
HIGHLIGHT ALL PAD FOOTING LOCATIONS
ALL DOORS TAPED ABOVE
PRINT HUNG ON NAIL N GARAGE
D 0 NOT REMOVE BLUEPRINTS FROM JOBSITE
PERIMETER AND PANELS GLUED
INTERIOR WALLS GLUED DOWN
INTERIOR AND EXTERIOR WALLS NAILED INTO TRUSSES BELOW
1. EXCAVATOR PLACE PRINT TUBE INSIDE. OF EXCAVATION.
SET TUBS INTO ROOM AND WIPE -OUT
ATTIC ACCESS INSTALLED IN HOUSE PER PRINT, 12" SIDES
2. WALL CONTRACTOR LEAVE ON TOP OF WALL.
ALL WINDOWS INSTALLED PER PRINT, ELEVATION AND STACK
3. PLUMBING CONTRACTOR LEAVE ON TOP OF WALL.
3/4" BLOCK UNDER CENTER OF DOUBLE WINDOWS
JOIST HANGERS NAILED FRONT AND SIDES
4. CONCRETE CONTRACTOR LEAVE ON TOP OF WALL.
SITE PICKED UP AND PUT N PILE EACH DAY
AROUND 2X4 AROUND TOP OF CHIMNEY, 1 1/2" PAST CHIMNEY FLAT
ALL GIRDER TRUSSES NAILED PER ENGINEERING
II