Loading...
HomeMy WebLinkAbout0745.95.23P E R V I S 0 R W 0 R K H E E T ItYLAND FOUNDATION CHECKLIST FRAME PUNCH -OUT CHECK LIST 1. GARAGE GARAGE DOOR OPENING FRAMED TO CORRECT SIZE: '1'14T, 8' OR 16'=e. BASEMENTSLAB _ GARAGE ATTIC ACCESS FRAMED TO CORRECT 51ZE AND LOCATION RMATION PROJECT INFORMATION NAILERv° AT ALL CORNERS OF GARAGE AND CEILING. PROJECT INFO GARAGE STEP FRAMED AND KICK PLATE UNDER DOOR BOW STUDS STRAP ANCHOR NAILED CORRECTLY LUMBER RACK BUILT 4 EXTRA MATERIAL STACKED ON HOUSE NAME / ELEV. HOUSE NAME / ELEV. z. HOUSE CHECK FOR BOW STUDS GHE SET NUMBER SET NUMBER - GK FOR NA!LERs MARK DOOR SWING DIRECTION AND SIZE PLAN /JOB NUMBER _ _ CHECK FOR CASING ROOM (!"!iN. 2" ON EAG+ -1 SIDE) PLAN / JOB NUMBER CHECK CENTERLINE OF KITCHEN WINDOW CHECK BULKHEAD DIMENSIONS STANDARD OR REVERSED STANDARD OR REVERSED CHECK WALL SIZES IN RELATION TO CABINET SPACE CHECK VANITY 5iZES IN RELATION TO WALL SPACE ANY NON -STD. CHANGES? ANY NON-STD. CHANGES? _ __ CHECK VANITY DEPTH TO DOOR OPENING (MIN. 24 1/2 ") GHEGK DOOR OPERATION AND INSTALLATION FRONT O R SIDE LOAD -- — CHECK WINDOW OPERATION AND INSTALLATION FRONT OR SIDE LOAD -- CHECK BASEMENT STAIR AND 2nd FLOOR STAIR INSTALLATION PITCH RAIL LUALL INSTALLED 1/2" BELOW STRINGER ENLARGED, OR FULL BSMT. ALL SIDING OR BRICK FRONT _ _- HALF -WALL 42" FROM FLOOR AND SAME PITCH AS STAIRS (BOTH STAIRWAYS) STD., E ____ T T (IN SET ") (OPT. 293) (OPT. 295) (IN 5ET "% (OPT. 490) HALF -WALL A STAIRS AIRS PAST STRINGER 1 1/2" TUB PLATFORM BUILT CORRECTLY 16 i /2" HT., 39" X 51" INSIDE ALL SIDING OR BRICK FRONT MASONRY _! NO sTuDS 0 24" D.G. AT CERAMIC AREAS. C16" O.C. MAX.) TUB BLOCKS INSTALLED AT CERAMIC AREArv-. (IN SET •) (OPT. 490) FIREPLACE OPT. PRE -FAB HAILERS FOR FIBERGLASS TUBS INSTALLED BSMT. WINDOW OPT. QTY• ! M Y FIREPLACES -- - MEASURE VINYL AREAS FOR SQUARE NOTE: INSTALL BRICK LEDGE ON � ASONR CB PANELS HAVE BLOCKS ON ENDS (MARK LOGATION(S) ON PRINT BUILDING PERMIT NUMBER CHECK FOR LOAD - BEARING POINTS IN HOUSE AND PROPER LOAD TRANSFER FRONT PORCH WALL HT. TO BE -- STRAP ANCHORS SECURED IN HOUSE ABOVE TOP OF F T N ■ WALL -- - --- -- CRAWL 5PACE AND BASEMENT CLEANED OUT -- STAIRWAY SHIMMED (MAX. 1172" GAP EACH SIDE) FLUSH W/ 9 1/4 lat FLR. TJ.I.'e / 2" ABOVE W/ 11 1/8" let FLR. T.J.I.'e / 6" ABOVE W/ 14" let FLR. TJ.I.s " � let AND 2nd FLOORS LINE UP IN STAIR WELL MASONRY _ _ NO GAPS ,45OVE STAIRWAY DRAFTSTOP FIREPLACE OPT. PRE -FAB STAIRWAY DROP CEILING DONE CORRECTLY (GHEGK PRINTS) �. RISER INSTALLED AT TOP BASEMENT STEP NOTE- INSTALL BRICK LEDGE ON MA50NRY FIREPLACES HANDRAIL BLOCKS INSTALLED 32" FROM STAIR NOSIW3 BUILDING PERMIT NUMBER CHECKLIST - - -` SAFETY BOOTS AND RAILS INSTALLED STRONGSACK IN FLOOR TRUSSES BLOCKED AND NAILED TIGHT FLOOR SHEATHING NAILED PER SPEC.'S CHECKLIST _____._ MARK OUT ALL HAUNCHES NOT USED MARK IN FRONT PORGN WALLS IF NOT ON PRINTS -- FALL PROTECTION INSTALLED AT STAIR WALL OPENINGS EYEBOLT AND ANCHOR POINT IN PLACE SUMP PUM LOCATION MARKED _ — WATER SLEEVE LOCATION MARKED -- P SUMP PUMP SLEEVE LOCATION MARKED - -- — _- _ — ALL DRAFT STOP INSTALLED ON CHASE AND BAND JOISTS MARK OUT ALL HAUNCHES NOT USED HIGHLIGHT ALj_ THICKENED SLAB FOO''INGS — _ ALL TY✓EGK STAPLED (N -PLACE EXTERIOR MARK IN FRONT PORCH WALL IF NOT ON PRINTS HIGHLIGHT ALL PAD FOOTING L-OCATIONS - _ ALL HOLES PATCHED IN INSULATION BOARD SEWER AND WATER SLEEVE LOCATIONS MARKED _ ALL TRIM INSTALLED PER PRINT (3'W/ 4" SEWER COUPLER, 5'W/ 1 1/2" SLEEVE) 3 1/2" RIPS 1/2 SHEATHING INSTALLED ON CORNERS HIGHLIGHT ALL BEAM POCKETS _ ALL WINDOWS TAPED ON TOP AND GLUED ON FOUR SIDES HIGHLIGHT ALL PAD FOOTING LOCATIONS ALL DOORS TAPED ABOVE PRINT HUNG ON NAIL IN GARAGE D ONOT REMOVE BLUEPRINTS FROM JOBSITE PERIMETER AND PANELS GLUED INTERIOR WALLS GLUED DOWN INTERIOR AND EXTERIOR WALLS NAILED INTO TRUSSES BELOW 1. EXCAVATOR PLACE PRINT TUBE INSIDE OF EXCAVATION. SET TUBS INTO ROOM AND WIPE -OUT ATTIC ACCESS INSTALLED IN HOUSE PER PRINT, 12" SIDES 2. WALL CONTRACTOR LEAVE ON TOP OF WALL. ALL WINDOWS INSTALLED PER PRINT, ELEVATION AND STACK 3/4" BLOCK UNDER CENTER OF DOUBLE WINDOWS 3. PLUMBING CONTRACTOR LEAVE ON TOP OF WALL. J015T HANGERS NAILED FRONT AND SIDES SITE PICKED UP AND PUT IN PILE EACH DAY 4. CONCRETE CONTRACTOR LEAVE ON TOP OF WALL. 2X4 AROUND TOP OF CHIMNEY: 1 1/2" PAST CHIMNEY FLAT ALL GIRDER TRUSSES NAILED PER ENCsiNEERING pr