FOUNDATION CHECKLIST
-1
FRAME PUNCH -OUT CHECK LIST
1. GARAGE
BASEMENT
SLAB
GARAGE DOOR OPENING FRAMED TO CORRECT SIZE: -I' HT., 8' OR I6 WIDE.
GARAGE ATTIC ACCESS FRAMED TO CORRECT SIZE AND LOCATION
PROJECT INFORMATION
PROJECT INFORMATION
_ NAILERS AT ALL CORNERS OF GARAGE AND CEiLINCs.
GARAGE STEP FRAMED AND KICK PLATE UNDER DOOR
_ — BOW STUDS
STRAP ANCHOR NAILED CORRECTLY
LUMBER RACK BUILT t EXTRA MATERIAL STACKED ON
HOUSE NAME / ELEV.
HOUSE NAME / ELEV.
2. HOUSE
CHECK FOR BOW STUDS
SET NUMBER
SET NUMBER
__ _ CHECK FOR NAILERS
MARK DOOR SWING DIRECTION AND SIZE
PLAN / JOB NUMBER
PLAN / JOB NUMBER
CHECK FOR CASING ROOM (MIN. 2" ON EACH SIDE)
CHECK CENTERLINE OF KITCHEN WINDOW
STANDARD OR REVERSED
STANDARD OR REVERSED
CHECK BULKHEAD D IMEN51ONS
- CHECK WALL SIZES IN RELATION TO CABINET SPACE
CHECK VANITY SIZES IN RELATION TO WALL SPACE
ANY NON -STD. CHANGES?
ANY NON -STD. CHANGES?
- - -- CHECK ✓ANjTY DEPTH TO DOOR OPENING (MIN. 241/2")
CHECK DOOR OPERATION AND INSTALLATION
FRONT OR SIDE LOAD
FRONT OR SIDE LOAD
- -- CHECK WINDOW OPERATION AND INSTALLATION
--- -- CHECK BASEMENT STAIR AND 2nd FLOOR STAIR INSTALLATION
- - - -- PITCH RAIL WALL INSTALLED 1/2" BELOW STRINGER
STD., ENLARGED, OR FULL BSMT.
ALL SIDING OR BRICK FRONT
_______ HALF -WALL 42" FROM FLOOR AND SAME PITCH AS STAIRS (BOTH STAIRWAYS)
(IN SET •) (OPT. 293) (OPT. 295)
C11 5ET ") (OPT. 490;'
_- -_ -_ -_ HALF -WALL AT STAIRS PAST 5"'R!NGER 1 12"
TUB RLATFOR"'1 BUILT CORRECTLY 16 1/2" HT., 39° X 57" INSIDE
ALL SIDING OR BRICK FRONT
________ NO STUDS B 24" O.C. AT CERAMIC AREAS. (Ifa' O.C. MAX.)
(IN SET M) (OPT 4W)
MASONRY
TUB BLOCKS INSTALLED AT CERAI"!;C AREAS.
FIREPLACE OPT. PRE -FAB
_________ NAiLER5 FOR FIBERCxLA55 TUBS INSTALLED
BSMT. WINDOW OPT. QTY •
r M
NOTE; .N5 � ALL BRICK LEDGE ON ASONR`�' FIREPLACES
___ —�_ MEASURE VINYL AREAS FOR SQUARE
(MARK LOCATIONS) ON PRINT
- - -_ —_ CB PANELS HAVE BLOCKS ON ENDS
BUILDING PERMIT NUMBER
-� CHECK FOR LOAD - BEARING POINTS IN HOUSE AND PROPER LOAD TRANSFER
FRONT PORCH WALL HT. TO BE
— STRAP ANCHORS SECURED IN HOUSE
ABOVE TOP OF F T N. WALL
-- - -- CRAWL SPACE AND BASEMENT CLEANED OUT
FLUSH W/ 9 1/4" let FLR TJ.I.'e / 2" ABOVE W/ Il 118" let FLR TJ.i.'e / 6" ABOVE W/ 14" 'et FLR �.J.1.`a
— — STAIRWAY SHIMMED (MAX. 112" GAP EACH SIDE)
let AND 2nd FLOORS LINE UP IN STAIR WELL
MASONRY
-_ NO GAPS ABOVE STAIRWAY DRAFTSTOP
FIREPLACE OPT. PRE -FAB
STAIRWAY DROP CEILING DONE CORRECTLY (CHECK PRINTS)
RISER INSTALLED AT TOP BASEMENT STEP
NOTE- INSTALL BRICK LEDGE ON MASONRY FIREPLACES
HANDRAIL BLOCKS INSTALLED 32" FROM STAIR NOSING
BUILDING PERMIT NUMBER
CHECKLIST
__._.____ SAFETY BOOTS AND RAILS INSTALLED
STRONGBACK IN FLOOR TRUSSES BLOCKED AND NAILED TIGHT
CHECKLIST
MARK OJT ALL HAUNCHES NOT JSED
_ FLOOR SHEATHING NAILED PER SPEG.'8
^� MARK IN FRONT PORCH WALLS IF NOT ON PRINTS
__ — FALL PROTECTION INSTALLED AT STAIR WALL OPENINGS
-- SUMP PUMP LOCATION MARKED
- ___ —_ -- WATER SLEEVE LOCATION MARKED
- EYEBOLT AND ANCHOR POINT IN PLACE
SUMP PUMP SLEEVE LOCATION MARKED
_ ALL DRAFT STOP INSTALLED ON CHASE AND BAND J015TS
MARK OUT ALL HAUNCHES NOT USED
- - - -- HIGHLIGHT ALL THICKENED SLAB FOOTINGS
ALL TYVEGK STAPLED IN-PLACE EXTERIOR
MARK IN FRONT PORCH WALL IF NOT ON PRINTS
- - - - -- HIGHLIGHT ALL PAD FOOTING LOCATIONS
ALL HOLES PATCHED .N INSULATION SON BOARD
SEWER AND WATER SLEEVE LOCATIONS MARKED
--ALL TRIM INSTALLED PER PRINT
(3' W/ 4" SEWER COUPLER, 5' W/ 1 1/2" SLEEVE)
3 I -'2° RIPS 'sl2 SHEATHING INSTALLED ON CORNERS
HIGHLIGHT ALL BEAM POCKETS
-�
HIGHLIGHT ALL PAD FOOTING LOCATIONS
_ ALL WINDOWS TAPED ON TOP AND GLUED ON FOUR SIDES
ALL DOORS TAPED ABOVE
PRINT HUNG ON NAIL IN GARAGE
--
DO NOT REMOVE BLUEPRINTS FROM JOBSITE
PERIMETER AND PANELS GLUED
INTERIOR WALLS GLUED DOWN
_ INTERIOR AND EXTERIOR WALLS NAILED INTO TRUSSES BELOW
1. EXCAVATOR PLACE PRINT TUBE INSIDE OF EXCAVATION.
SET TU55 INTO ROOM AND WIPE -OUT
ATTIC ACCESS INSTALLED IN HOUSE PER PRINT, 12" SIDES
2. WALL CONTRACTOR LEAVE ON TOP OF WALL.
ALL WINDOWS INSTALLED PER PRINT, ELEVATION AND STACK
3. PLUMBING CONTRACTOR LEAVE ON TOP OF WALL.
— 3/4" BLOCK UNDER CENTER OF DOUBLE WINDOWS
JOIST HANGERS NAILED FRONT AND SIDES
4. CONCRETE CONTRACTOR LEAVE ON TOP OF WALL.
SITE PICKED UP AND PUT IN PILE EACH DAY
2X4 AROUND TOP OF CHIMNEY, 1 1/2 PAST CHIMNEY FLAT
ALL GIRDER TRUSSES NAILED PER ENGINEERING