HomeMy WebLinkAbout0757.95.21S U P E R V I S 0 R W 0 R K H E E T RYLAND FOUNDATION CHECKLIST -1 FRAME PUNCH -OUT CHECK LIST 1. GARAGE BASEMENT SLAB GARAGE DOOR OPENING FRAMED TO CORRECT SIZE: -I' HT., 8' OR I6 WIDE. GARAGE ATTIC ACCESS FRAMED TO CORRECT SIZE AND LOCATION PROJECT INFORMATION PROJECT INFORMATION _ NAILERS AT ALL CORNERS OF GARAGE AND CEiLINCs. GARAGE STEP FRAMED AND KICK PLATE UNDER DOOR _ — BOW STUDS STRAP ANCHOR NAILED CORRECTLY LUMBER RACK BUILT t EXTRA MATERIAL STACKED ON HOUSE NAME / ELEV. HOUSE NAME / ELEV. 2. HOUSE CHECK FOR BOW STUDS SET NUMBER SET NUMBER __ _ CHECK FOR NAILERS MARK DOOR SWING DIRECTION AND SIZE PLAN / JOB NUMBER PLAN / JOB NUMBER CHECK FOR CASING ROOM (MIN. 2" ON EACH SIDE) CHECK CENTERLINE OF KITCHEN WINDOW STANDARD OR REVERSED STANDARD OR REVERSED CHECK BULKHEAD D IMEN51ONS - CHECK WALL SIZES IN RELATION TO CABINET SPACE CHECK VANITY SIZES IN RELATION TO WALL SPACE ANY NON -STD. CHANGES? ANY NON -STD. CHANGES? - - -- CHECK ✓ANjTY DEPTH TO DOOR OPENING (MIN. 241/2") CHECK DOOR OPERATION AND INSTALLATION FRONT OR SIDE LOAD FRONT OR SIDE LOAD - -- CHECK WINDOW OPERATION AND INSTALLATION --- -- CHECK BASEMENT STAIR AND 2nd FLOOR STAIR INSTALLATION - - - -- PITCH RAIL WALL INSTALLED 1/2" BELOW STRINGER STD., ENLARGED, OR FULL BSMT. ALL SIDING OR BRICK FRONT _______ HALF -WALL 42" FROM FLOOR AND SAME PITCH AS STAIRS (BOTH STAIRWAYS) (IN SET •) (OPT. 293) (OPT. 295) C11 5ET ") (OPT. 490;' _- -_ -_ -_ HALF -WALL AT STAIRS PAST 5"'R!NGER 1 12" TUB RLATFOR"'1 BUILT CORRECTLY 16 1/2" HT., 39° X 57" INSIDE ALL SIDING OR BRICK FRONT ________ NO STUDS B 24" O.C. AT CERAMIC AREAS. (Ifa' O.C. MAX.) (IN SET M) (OPT 4W) MASONRY TUB BLOCKS INSTALLED AT CERAI"!;C AREAS. FIREPLACE OPT. PRE -FAB _________ NAiLER5 FOR FIBERCxLA55 TUBS INSTALLED BSMT. WINDOW OPT. QTY • r M NOTE; .N5 � ALL BRICK LEDGE ON ASONR`�' FIREPLACES ___ —�_ MEASURE VINYL AREAS FOR SQUARE (MARK LOCATIONS) ON PRINT - - -_ —_ CB PANELS HAVE BLOCKS ON ENDS BUILDING PERMIT NUMBER -� CHECK FOR LOAD - BEARING POINTS IN HOUSE AND PROPER LOAD TRANSFER FRONT PORCH WALL HT. TO BE — STRAP ANCHORS SECURED IN HOUSE ABOVE TOP OF F T N. WALL -- - -- CRAWL SPACE AND BASEMENT CLEANED OUT FLUSH W/ 9 1/4" let FLR TJ.I.'e / 2" ABOVE W/ Il 118" let FLR TJ.i.'e / 6" ABOVE W/ 14" 'et FLR �.J.1.`a — — STAIRWAY SHIMMED (MAX. 112" GAP EACH SIDE) let AND 2nd FLOORS LINE UP IN STAIR WELL MASONRY -_ NO GAPS ABOVE STAIRWAY DRAFTSTOP FIREPLACE OPT. PRE -FAB STAIRWAY DROP CEILING DONE CORRECTLY (CHECK PRINTS) RISER INSTALLED AT TOP BASEMENT STEP NOTE- INSTALL BRICK LEDGE ON MASONRY FIREPLACES HANDRAIL BLOCKS INSTALLED 32" FROM STAIR NOSING BUILDING PERMIT NUMBER CHECKLIST __._.____ SAFETY BOOTS AND RAILS INSTALLED STRONGBACK IN FLOOR TRUSSES BLOCKED AND NAILED TIGHT CHECKLIST MARK OJT ALL HAUNCHES NOT JSED _ FLOOR SHEATHING NAILED PER SPEG.'8 ^� MARK IN FRONT PORCH WALLS IF NOT ON PRINTS __ — FALL PROTECTION INSTALLED AT STAIR WALL OPENINGS -- SUMP PUMP LOCATION MARKED - ___ —_ -- WATER SLEEVE LOCATION MARKED - EYEBOLT AND ANCHOR POINT IN PLACE SUMP PUMP SLEEVE LOCATION MARKED _ ALL DRAFT STOP INSTALLED ON CHASE AND BAND J015TS MARK OUT ALL HAUNCHES NOT USED - - - -- HIGHLIGHT ALL THICKENED SLAB FOOTINGS ALL TYVEGK STAPLED IN-PLACE EXTERIOR MARK IN FRONT PORCH WALL IF NOT ON PRINTS - - - - -- HIGHLIGHT ALL PAD FOOTING LOCATIONS ALL HOLES PATCHED .N INSULATION SON BOARD SEWER AND WATER SLEEVE LOCATIONS MARKED --ALL TRIM INSTALLED PER PRINT (3' W/ 4" SEWER COUPLER, 5' W/ 1 1/2" SLEEVE) 3 I -'2° RIPS 'sl2 SHEATHING INSTALLED ON CORNERS HIGHLIGHT ALL BEAM POCKETS -� HIGHLIGHT ALL PAD FOOTING LOCATIONS _ ALL WINDOWS TAPED ON TOP AND GLUED ON FOUR SIDES ALL DOORS TAPED ABOVE PRINT HUNG ON NAIL IN GARAGE -- DO NOT REMOVE BLUEPRINTS FROM JOBSITE PERIMETER AND PANELS GLUED INTERIOR WALLS GLUED DOWN _ INTERIOR AND EXTERIOR WALLS NAILED INTO TRUSSES BELOW 1. EXCAVATOR PLACE PRINT TUBE INSIDE OF EXCAVATION. SET TU55 INTO ROOM AND WIPE -OUT ATTIC ACCESS INSTALLED IN HOUSE PER PRINT, 12" SIDES 2. WALL CONTRACTOR LEAVE ON TOP OF WALL. ALL WINDOWS INSTALLED PER PRINT, ELEVATION AND STACK 3. PLUMBING CONTRACTOR LEAVE ON TOP OF WALL. — 3/4" BLOCK UNDER CENTER OF DOUBLE WINDOWS JOIST HANGERS NAILED FRONT AND SIDES 4. CONCRETE CONTRACTOR LEAVE ON TOP OF WALL. SITE PICKED UP AND PUT IN PILE EACH DAY 2X4 AROUND TOP OF CHIMNEY, 1 1/2 PAST CHIMNEY FLAT ALL GIRDER TRUSSES NAILED PER ENGINEERING It [A