FOUNDATION CHECKLIST FRAME PUNCH -OUT CHECK LIST
1. GARAGE
GARAGE DOOR OPENING FRAMED TO CORRECT SIZE: I' HT., 8' OR Ito' WIDE.
BASEMENT SLABGARAGE ATTIC ACCESS FRAMED TO CORRECT SIZE AND LOCATION.
PROJECT INFORMATION NAILERS AT ALL CORNERS OF GARAGE AND CEILING.
PROJECT INFORMATION GARAGE STEP FRAMED AND KICK PLATE UNDER DOOR
BOW STUDS
STRAP ANCHOR NAILED CORRECTLY
LUMBER RACK BUILT t EXTRA MATERIAL STACKED ON
HOUSENAME I ELEV. HOUSE NAME / ELEV. _ 2. HOUSE
CHECK FOR BOW STUDS
SET NUMBER -
CHECK FOR HAILERS
SET NUMBER MARK DOOR SWiW -s DIRECTION AND SIZE
PLAN /JOB NUMBER _�__ GHEGK FOR CASING ROOM (MIN. 2" ON EACH SIDE)
PLAN / JOB NUMBER _ _ CHECK CENTERLINE OF KITCHEN WINDOW
CHECK BULKHEAD DIMENSIONS
STANDA
RD OR REVERSED STANDARD OR REVERSED _ CHECK WALL 51ZF-S IN RELATION TO CABINET SPACE
_
_
CHECK VANITY SIZES IN RELATION t0 WALL SPACE
Y NON -STD. CHANGES? ANY NON -STD. CHANGES? - - -- CHECK VANITY DEPTH TO DOOR OPENI (MIN. 241/2")
AN NG CHECK DOOR OPERATION AND INSTALLATION
FRONT OR SIDE LOAD - __ --
CHECK WINDOW OPERATION AND INSTALLATION
FRONT OR SIDE LOAD CHECK BASEMENT STAIR AND 2nd FLOOR STAIR INSTALLATION
PITCr -1 RAIL WALL INSTALLED 112" BELOW STRINGER
STD., ENLARGED, OR FULL BSMT. ALL SIDING OR BRICK FRONT __- - HALF -WALL 42" FROM FLOOR AND SAME PITCH AS STAIRS (BOTH 5TAIRWAYS)
- HALF -WALL AT STAIRS PAST STRINGER i 1/2"
(IN SET ') (OPT. 293) (OPT. 295) (IN SET r j (OPT, 490)
TUB PLATFORM BUILT CORRECTLY 16 1,12" HT., 39" X 51" INSIDE
NO STUDS 0 24" O.C. AT CERAMIC AREAS. (16" O.G. MAX.)
ALL SIDING OR BRICK FRONT MASONRY TUB 51_00K5 INSTALLED AT CERAMIC AREAS.
(IN SET 1) (OPT. 490) FIREPLACE OPT. PRE -FAB --
HAILERS FOR FIBERGLASS TUBS INSTALLED
-
MEASURE VINYL AREAS FOR SQUARE
BSMT■ WINDOW OPT. QTY■ NOTE: INSTALL BRICK LEDGE ON MASONRY ASRY FIREPLACES _
CB PANELS HAVE BLOCKS ON ENDS
(MARK LOCATION(5) ON PRINT
BUILDING PERMIT NUMBER __ CHECK FOR LOAD - BEARING POINTS IN HOUSE AND PROPER LOAD TRANEFER
FRONT PORCH WALL HT. TO BE __ _ __ STRAP ANCHORS SECURED IN HOUSE
ABOVE TOP OF F T N. WALL __CRAWL SPACE AND BASEMENT CLEANED OUT
—__ STAIRWAY SHIMMED (MAX. 1/2" GAP EACH SIDE)
FLUSH W/ 9 1/4" let FLR. TJ.!.'a / 2" ABOVE W/ 11 1/8" let FLR. TJ.I.'e / 6" ABOVE W/ 14" let FLR. TJ.I.'e —� let AND 2nd FLOORS LINE UP IN STAIR WELL
MASONRY NO GAPS ABOVE 5TAIRWAY DRAFTSTOP
STAIRWAY DROP CEILING DONE CORRECTLY (CHECK PRINTS)
FIREPLACE OPT. PRE -FAB
RISER INSTALLED AT TOP BASEMENT STEP
NOTE: INSTALL BRICK LEDGE ON MASONRY FIREPLACES __ —_ —_ HANDRAIL BLOCKS INSTALLED 32" FROM STAIR NOSING
BUILDING PERMIT NUMBER CHECKLIST -�- J SUETY BOOTS AND RAILS INSTALLED
BUILD _ 5TRONG5AGK IN FLOOR TRUSSES BLOCKED AND NAILED TIGHT
FLOOR SHEATHING NAILED PER SPEG.'s
CHECKLIST __ MARK OUT ALL HAUNCHES NOT JSED
-- MARK !N RNT PORCH WAILS IF NOT ON PRINTS — FAIFALL PROTECTION INSTALLED At STAIR WALL OPENINGS
FC7
--- - -- _ EYEBOLT AND ANCHOR POINT IN PLACE
SUMP PUMP LOCATION MARKED WATER SLEE'/E LOCATION MARKED
- - -- ALL DRAFT STOP INSTALLED ON CHASE AND BAND JOISTS
SUMP PUMP SLEEVE LOCATION MARKED _
MARK OUT ALL HAUNCHES NOT USED - - - - -- HIGHLIGHT ALL THICKENED SLAB FOOTINGS ALL TYVEGK STAPLED IN -PLACE EXTERIOR
HIGHLIGHT ALL PAD FOOTING LOCATIONS ALL HOLES PATCHED IN INSULATION BOARD
MARK IN FRONT PORCH WALL IF NOT ON PRINTS - - -�`
ALL TRIM INSTALLED PER PRINT
SEWER AND WATER SLEEVE LOCATIONS MARKED
(3' W/ 4" SEWER COUPLER 5' W/ 1 1/2" SLEEVE) 3 1/2" RIPS 112 SHEATHING INSTALLED ON CORNERS
HIGHLIGHT ALL BEAM POCKETS ALL WINDOWS TAPED ON TOP AND GLUED ON FOUR SIDES
_ HIGHLIGHT ALL PAD FOOTING LOCATIONS ALL DOORS TAPED ABOVE
PRINT kk4G ON NAIL IN GARAGE
E BLUEPRINTS FROM JOBSITE _ PERIMETER AND PANELS GLUED
DO NOT REMOV IN TERIOR WALLS GLUED DOWN
INTERIOR AND EXTERIOR WALLS NAILED INTO TRUSSES BELOW
1. EXCAVATOR PLACE PRINT TUBE INSIDE OF EXCAVATION■ SET TUBS INTO ROOM AND WIPE-OUT
ATTIC ACCESS INSTALLED IN HOUSE PER PRINT, 12" SIDES
2. WALL CONTRACTOR LEAVE ON TOP OF WALL. ALL WINDOWS INSTALLED PER PRINT, ELEVATION AND STACK
3/4" BLOCK UNDER CENTER OF DOUBLE WINDOWS
3. PLUMBING CONTRACTOR LEAVE ON TOP OF WALL. —� JOIST HANGERS NAILED FRONT AND SIDES
51TE PICKED UP AND PUT IN PILE EACH DAY
4. CONCRETE CONTRACTOR LEAVE ON TOP OF WALL. _ 2X4 AROUND TOP OF CHIMNEY, 1 1n" PAST CHIMNEY FLAT
ALL GIRDER TRUSSES NAILED PER ENGINEERING