Loading...
HomeMy WebLinkAbout0341.95.10C6NN1 -1.T TO EXISTING GAS LINES r4olEG�- +�NIG4L i=L�41�1 MEGt iAN IGAL t- rATINb, VENT-L -ATIN6 ANP AIR CONDITIONING REL2UIREP POR THIS WORK SECTION IS INDICATED ON THE DRAWINGS, AND I CL 15155 15UT IS NOT LIMITED TO AIR CONDITIONING UNITS, I°ILTERS CONTRAS, DUCTS, pAMPERS, GRILLS, REGISTERS, pII•T'It'115ERS, DUCT IIVSILATION, EXHAUST I'aANS, GAS RADIANT HEAT SYSTEM, UNIT I'eATP -?5 AND OTI-MR MISG. ITEMS REQUIRED F-OR A COMPLETE .1015. f TOR r- �'tALL A55LJRE Aim VERIr'Y THAT ALL_ IPMENT, GONTROL_5, AND MISC. ITEMS DE 5l�'Pl -tf=D TD PROVIDE A AND OPERA15LE HVAG SYSTEM. DUCTWORK SHAD_ M INSTALL rP IN STRICT A -C. PANCf'_ WITH 51v1AG.NA. STANDARDS. ALL pUGTWORK SHALL M 01` PROP7*'R GUA6E FOR SIZE A.ND VOLLIMN OF AIR HAtNP gyp. ALL SIJPK-Y DUCTWORK SMALL 15E LINED WITH I/2" INSU-ATION AND ALL R rrUPN AIR DUGT5 SHALL bE LINED FOR THE FIRST jd-4s, FROM THE AIR HANDLING UNIT. ALL DUCTWORK SHALL 15E INSTALIZP AS NOTED ON PLANS, AND 5HALL NOT I� WITH STRLJ(.TURAL_ SORT 5`rSTPSriS. ALL DUCTWORK SHALL 15E SECURELY HUNG A.ND FASTED PROM PRIMARY AND 6MCONDARY STRUGTbRAL MEM15ER5 ONLY, HAN6ER5 SHALL_ 15E PLX.ED PER SMACNA STANPARS, AND SHALL NOT V115RATE DURING OPERATION. PROVIDE ALL NECESSAfZY SUPPRORTS, HAI- a 19, ISOLATORS, 60t, F TORS, PAMPER AND VOLU MN CONTROLS FOR A COMPLETE. AND MPI�HANICAL SYSTEM. GRILLES ANp p1 5 5t-1ALL 15E INSTALLPP IN LOCATIONS AS NOTED ON THE PLANS. ALL_ UNITS SHALL_ 15E OF MANUFACTURER AND MODEL NUM15ER AS NOTFP. PROVIDE ALL NECE55ARY SPIN -INS, ADAPTERS, PAMPERS, C.O�TORS, AND MISC. ITEMS TO PROVIDE FOR A 60 'ATE INSTALLATION. ED0-tAUST 1"ANS SHALL 15E PROVIDED AND INSTAL.LEP AS NOTED ON THE PLANS. PROVIDE ALL N1245ESSARY FLACIIING, PACK -PRA -r PAMPERS, CONTROLS ANp MISC. IT -MS TO PROVIDE A COMPLETE INSTALLATION. jt,n RED GAS FIFVP HMATIN6 SYSTEM SHALL 15E PROVIDED AND INSTALLED AS NOTED ON PLANS. 5YSTEM SHALL 15E A5 SFr -C -TIED. CONTRACTOR MAY VOLUNT-ER AN AL-T -RNATE SYSTEM AS EITHER A DEDUCT OR App TO THE BASE DID. CONNECTIONS AND COORDINATION WITH ALL TRADES ISMALL 15E THE RESPONSIflILITY OF THE MECHANICAL CONTRACTOR VERIFY CUR15 L 06.ATIONS, GAS PIPING, EL.PLTRICAL LOCATIONS AND ELPLTRICAL GAPAJ5I1-17IE15 f OR A COMPEL' -TE INSTALLATION. STAIN -UP AND 15ALANCING SHALL. 15E C�OM !=P IMMEDIATELY AFTER OR OWI,412-SiS MOVING INTO THE FACILITY. PROVIDE ALL t- l SSAPY EQUIPMENT FILTERS AS RF- 4RUIRED. I