HomeMy WebLinkAboutFInal Inspection Report/Hazel Dell Resurface WIC 639 Page P-2
Indiana Department Of Transportation
Report of Contract Final Inspection and
Recommendation for Acceptance
Contract SRS-32650 Project 0901163
Date Construction Substantially Completed: 10/01/2010 •
(The date all items were complete,except punch list and removal of traffic control devices.)
Intermediate Completion Date /t///A
Primary Inspection made by gob Voictur M11u A. � grit. Cnalckf At Scot%01/10n,
Trent New1et+1 !Anti Stwilt7 ) knot AnJrt a 1.4 lc
on 10/12/2010--
Date Punch List Items Completed: 05/06/2011
Sod Maintenance Expired on: 12/03/2010-
Date Sod Repaired,if necessary: 05/06/2011
Final Inspection made by: 3 6A D;!!o„t er . E..(1Ic�S: ? 14Aco f e )
aknat Andn■ X014
on 05/06/2011
and all work was found to be satisfactory from Station 531+Sy to 4914.S6
Date Construction Signs and Temporary Traffic Control Devices Removed: 11/60010—
Pavement Smoothness(0 ) {does not)comply with the Specifications.
Pavement Markings have (have not)been placed in accordance with the IMUTCD manual or as
directed by the District Traffic Engineer.
Right-of-Wayt {is not)clear of all encroachments.
Date of Last Work: 05/06/2011
RECOMMEND ACCEPTANCE
*CAL PUBLIC AGENCY
DISTRICT CONSTRUCT' ENGINEER
By: A
*County of City signatures *By: / /,L l
when required(at least two). �% •�i r
Slate Form 1865(R318-92 n■ Mw-
INDIANA DEPARTMENT OF TRANSPORTATION
=_ry Driving Indiana's Economic Growth
u i U ham' b3 i f' E c
Greenfield District Construction PHONE;(317)462-7751
op.r►t 32 S.Broadway Street FAX:(317)467-3956 Mitchell E. Daniels,Jr., Governor
Greenfield,IN 46140-2247 Michael B. Cline, Commissioner
September 21, 2012
Mike McBride
One Civic Square
Carmel, IN 46032
Contract: SRS-32650
Asphalt resurface
On Hazel Dell Parkway
Dear City/County Official,
Attached is form IC-639, recommending acceptance of the above referenced contract.
If you agree,please obtain at least two (2)signatures and return the form to the
Greenfield District Office. We appreciate your attention to this matter so that we may.
final out this contract.
Yours truly,
Roland L. Fegan,Ji.
District Construction Engineer
RLF:dal
Cc: File
LI
www.in.gov/dotl
An Equal Opportunity Employer