Loading...
HomeMy WebLinkAbout0670.97.3'oof 1� MA'-A' tj w z TND f z 0 V-S 1/2' ol ICL a 0Q 0 tj) Z aL w al to (Y- VENT VENT LIJ 3: = J) (p — 0) w ^1L,, Ul =3 CD 3) uj o VENT VENT z co z F — — — — — — - — — — — — — — — — — — - — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — I j 1 j � 117 j 11— 1 4 COURSE CONCRETE BLOCK ON 16' x S' CONT. CONCRETE FOOTING I I I � j � I I I i I� I � .4 - — — — — — — — — — --- ...-I LJ-J r -j — ----- - - - - - L J L -J CRAWL SPACE (o MIL VAPOR BARRIER ON 4' GRANULAR FILL MINIMUM 16' x IW CONCRETE BLK PIER ON 30' x 30' x 12' CONCRETE PAD (TYPICAL) L J L -J 4 COURSE CONCRETE BLOCK ON IW x 6' CONT, CONCRETE FOOTING I r — —I ( I I i i PO \NIMUM\ I I i I 4' ';ON CONCRETE N\ CONCRETE &L-45 0 L a oi� TE F L + -J L 4- GRANULAR FILL MINIMU UL R IL M I COURSE CONCRETE L BLOCK ON — — — — — — — — —� I ' 3 COURSE CONCRETE BLOCK ON I(o' x 6' CONT. CONCRETE FOOTING e loe L---------- - - - --J L — — — — — — — — — — — -- — — — — — — — — — — — — — — — — — — — — — %I — — — — — — — — — — — — — — — — F 4- GARAGE 4' CONCRETE SLAB ON 4' GRANULAR FILL MINIMUM FRAMING NOTE 7R-EFER TO TRUSS MANUFACTURERS DRAWINGS FOR ALL FLOOR F F RAMING INFORMATION II I i c -------------------------— 3'-2 1/2' SQUARE FOOTAGES lo lo ol GARAGE SLAB 456 SP, 50'43' FIRST FLOOR 2150 SP. t=nl I k I n A T I nkl 1=1 AM 11 A II SECOND FLOOR N/A tj w z TND f z 0 cf) O Z 4 r- ICL a 0Q 0 tj) Z aL w al to (Y- W LIJ 3: = J) (p — 0) w ^1L,, Ul =3 CD 3) uj o z co z — z tj w z TND f z 0 cf) O Z 4 r- ICL We kn THE PONOP ELEVATION PLUM CQEE LOT **55 T UN INK RESIDENCE z TND f z 0 cf) O Z 4 r- ICL a 0Q 0 tj) Z aL w al to (Y- W LIJ 3: = J) (p — 0) ^1L,, THE PONOP ELEVATION PLUM CQEE LOT **55 REVISED DATE: 05/14/95 08/22/ 05/21/95 05/30, 07/31/95 SHEET NO n T UN INK RESIDENCE —2 FI L E NAME: PC55 PLOT DATE. 0 5/3C REVISED DATE: 05/14/95 08/22/ 05/21/95 05/30, 07/31/95 SHEET NO n