FOUNDATION CHECKLIST
FRAME PUNCH -OUT CHECK LIST
BASEMENT
SLAB
I. GARAGE
GARAGE DOOR OPENING FRAMED TO CORRECT SIZE: l' HT„ 8' OR Ib' WIDE.
PROJECT INFORMATION
PROJECT INFORMATION
GARAGE ATTIC ACCESS FRAMED TO CORRECT SIZE AND LOCATION.
NAILERS AT ALL CORNERS OF GARAGE AND CEILING.
GARAGE STEP FRAMED AND KICK PLATE UNDER DOOR
HOUSE NAME / ELEV.
HOUSE NAME / ELEV■
BOW STUDS
_ STRAP ANCHOR NAILED CORRECTLY
SET NUMBER
SET NUMBER
2. HOUSE
PLAN / JOB NUMBER
PLAN / JOB NUMBER
CHECK FOR BOW STUDS
CHECK FOR NAILERS
MARK DOOR SWING DIRECTION AND SIZE
STANDARD OR REVERSED
STANDARD OR REVERSED
_ CHECK FOR CASING ROOM (MIN. 2" ON EACH SIDE)
CHECK CENTERLINE OF KITCHEN WINDOW
ANY NON -STD. CHANGES?
ANY NON -STD. CHANGES
---- CHECK BULKHEAD DIMENSIONS (2" LONGER AND 2" WIDER THAN CABINETS)
CHECK WALL SIZES IN RELATION TO CABINET SPACE
FRONT OR SIDE LOAD
FRONT OR SIDE LOAD
CHECK /ANITY SIZES IN RELATION TO WALL SPACE
TO
CHECK VANITY DEPTH DOOR OPENING (MIN. 241/2")
CHECK DOOR OPERATION AND INSTALLATION
STD., ENLARGED, OR FULL BSMT.
ALL SIDING OR BRICK FRONT
- - CHECK WINDOW OPERATION AND INSTALLATION
(IN SET r) (OPT. 293) (OPT. 295)
(IN SET M) (OPT 490)
— CHECK BASEMENT STAIR AND 2nd FLOOR STAIR INSTALLATION
— — PITCH RAIL WALL INSTALLED 1/2" BELOW STRINGER AND 1 112" SNORT
ALL SIDING OR BRICK FRONT
� _HALF-WALL 42" FROM FLOOR AND SAME PITCH As STAIRS (BOTH STAIRWAYS) -
-
(IN SET 11) (OPT. 4W)
MASONRY
HALF -WALL AT STAIRS PAST STRINGER 1 112"
FIREPLACE OPT. PRE -FAB
- TUB PLATFORM BUILT CORRECTLY 16 1/2" HT., 39" X 51" INSIDE F
BSMT. WINDOW OPT. QTY■
— NO STUDS A 24" O.C. AT CERAMIC AREAS. (16" O.C. MAX.)
NOTE: INSTAL'" BRICK LEDGE ON (" tASONRY FIREPLACES
—V—TUB BLOCKS INSTALLED AT CERAMIC AREAS.
(MARK LOCATIONS) ON PRINT
BUILDING PERMIT NUMBER
HAILERS FOR FIBERGLASS TUBS INSTALLED
FRONT PORCH WALL HT. TO BE
_ MEASURE VINYL AREAS FOR SQUARE
ABOVE TOP OF FTN■ WALL
_ GB PANELS HAVE BLOCKS ON ENDS
LOT ADDRESS
-- HECK FOR LOAD - BEARING POINTS IN HOUSE AND PROPER LOAD TRAM FER
FLUSH W/ 9 I/4" 1st FLR T.J.I.'e 2" ABOVE W/ 11 1/8" 1st FLR T.J.I.'6 b" ABO'✓E W/ 14" 1st FLR TJ.�.'s
STRAP ANCHORS SECURED IN HOUSE
MASONRY
CRAWL SPACE AND BASEMENT GLEANED OUT
FIREPLACE OPT. PRE -FAB
TOWNSHIP
STAIRWAY SHIMMED (MAX. 1r2" GAP EACH SIDE)
e let AND 2nd FLOORS LINE UP IN STAIR WELL
NOTE: INSTALL BRICK LEDGE ON MASONRY FIREPLACES
NO GAPS ABOVE STAIRWAY DRAFTSTOP
BUILDING PERMIT NUMBER
_� STAIRWAY DROP CEILING DONE CORRECTLY (CHECK PRINTS)
HANDRAIL BLOCKS INSTALLED 32" FROM STAIR NOSING
LOT ADDRESS
SAFETY BOOTS AND RAILS INSTALLED 3 1/2" FROM STRINGER
CHECKLIST
SQUASH BLOCKS INSTALLED PER PLAN AND T.J.(. DETAIL SHEET
FLOOR SHEATHING NAILED PER SPEC.'S
TOWNSHIP
T
MARK OUT ALL }- iAUNGHES NOT USED
—�__ FALL PROTECTION INSTALLED AT STAIR WALL OPENINGS
CHECKLIST
-- _ MARK IN FRONT PORCH WALLS IF NOT ON PRINTS
EYEBOLT AND ANCHOR POINT IN PLACE
DAFT STOP INSTALLED ON CHASE AND BAND JOISTS
DR
WATER SLEEVE LOCATION MARKED
— -AFT
�
5UI"SP PUMP LOCATION MARKED SEWER AND WATER SLEEVE
_.. __ HIGHLIGHT ALL Tu GKENED SLAB FOOTINGS
^_ ALL TYVECK STAPLED IN -PLACE EXTERIOR
ALL HOLES PATCHED IN INSULATION BOARD
SUMP PUMP SLEEVE LOCATION MARKED LOCATIONS MARKED (3'W/ 4" SEWER
COUPLER, 5 W/ 1 1/2 SLEEVE.
-- HIGHLIGHT ALL PAD FOOTING LOCATIONS
ALL TRIM INSTALLED PER PRINT
MARK OUT ALL HAUNCHES NOT USED HIGHLIGHT ALL BEAM POCKETS
-- SEAM TAKEOFF SHEET COMPLTE AND TURNED IN
TO FOUNDATION SUPERVISOR
3 1/2" RIPS 1/2 SHEATHING INSTALLED ON COf;a,IERS ,
MARK IN FRONT PORCH WALL HIGHLIGHT ALL PAD FTG. LOCATIONS
IF NOT ON PRINTS
(TO BE COMPLTED EVEN IF NO BEAMB REQUIRED)
ALL WINDOWS TAPED ON TOP AND GLUED ON FOUR SIDES .. .
ALL DOORS TAPED ABOVE?
BEAM TAKE -OFF SHEET CZ)MPLTE AND TURNED IN
TO FOUNDATION SUPERVISOR
PRINT HUNG ON NAIL IN GARAGE
5= �
(TO BE COMPLTED EVEN IF NO BEAMS REQUIRED)
PERIMETER AND PANELS GLUED
INTERIOR WALLS GLUED DOWN
DONOT REMOVE BLUEPRINTS FROM JOBSITE
INTERIOR AND EXTERIOR WALLS NAILED INTO TR�SSI`s BELOW
SET TU55 INTO ROOM AND WIPE -OUT
1. EXCAVATOR PLACE PRINT
TUBE INSIDE OF EXCAVATION,
ATTIC ACCESS INSTALLED IN HOUSE PER PRINT, 12" SIDES
ALL WINDOWS INSTALLED PER PRINT, ELEVATION AND STACK
2. WALL CONTRACTOR LEAVE
ON TOP OF WALL.
— JOIST HANGERS NAILED FRONT AND SIDES'``Y
SITE PICKED UP AND PUT M PILE EACH DAY
3. PLUMBING CONTRACTOR LEAVE ON TOP OF WALL.
2X4 AROUND TOP of CHIMNEY, 1 1J2" PAST GNIrtiNEY FLAT
ALL GIRDER TRUSSES NAILED PER ENGINEERING
4. CONCRETE CONTRACTOR
LEAVE ON TOP OF WALL.
REVISED 34119
: `'