Loading...
HomeMy WebLinkAbout0683.97.12.�._ -. S U P E R V R W 0 R K S H E E T MnAN D FOUNDATION CHECKLIST FRAME PUNCH -OUT CHECK LIST BASEMENT SLAB I. GARAGE GARAGE DOOR OPENING FRAMED TO CORRECT SIZE: l' HT„ 8' OR Ib' WIDE. PROJECT INFORMATION PROJECT INFORMATION GARAGE ATTIC ACCESS FRAMED TO CORRECT SIZE AND LOCATION. NAILERS AT ALL CORNERS OF GARAGE AND CEILING. GARAGE STEP FRAMED AND KICK PLATE UNDER DOOR HOUSE NAME / ELEV. HOUSE NAME / ELEV■ BOW STUDS _ STRAP ANCHOR NAILED CORRECTLY SET NUMBER SET NUMBER 2. HOUSE PLAN / JOB NUMBER PLAN / JOB NUMBER CHECK FOR BOW STUDS CHECK FOR NAILERS MARK DOOR SWING DIRECTION AND SIZE STANDARD OR REVERSED STANDARD OR REVERSED _ CHECK FOR CASING ROOM (MIN. 2" ON EACH SIDE) CHECK CENTERLINE OF KITCHEN WINDOW ANY NON -STD. CHANGES? ANY NON -STD. CHANGES ---- CHECK BULKHEAD DIMENSIONS (2" LONGER AND 2" WIDER THAN CABINETS) CHECK WALL SIZES IN RELATION TO CABINET SPACE FRONT OR SIDE LOAD FRONT OR SIDE LOAD CHECK /ANITY SIZES IN RELATION TO WALL SPACE TO CHECK VANITY DEPTH DOOR OPENING (MIN. 241/2") CHECK DOOR OPERATION AND INSTALLATION STD., ENLARGED, OR FULL BSMT. ALL SIDING OR BRICK FRONT - - CHECK WINDOW OPERATION AND INSTALLATION (IN SET r) (OPT. 293) (OPT. 295) (IN SET M) (OPT 490) — CHECK BASEMENT STAIR AND 2nd FLOOR STAIR INSTALLATION — — PITCH RAIL WALL INSTALLED 1/2" BELOW STRINGER AND 1 112" SNORT ALL SIDING OR BRICK FRONT � _HALF-WALL 42" FROM FLOOR AND SAME PITCH As STAIRS (BOTH STAIRWAYS) - - (IN SET 11) (OPT. 4W) MASONRY HALF -WALL AT STAIRS PAST STRINGER 1 112" FIREPLACE OPT. PRE -FAB - TUB PLATFORM BUILT CORRECTLY 16 1/2" HT., 39" X 51" INSIDE F BSMT. WINDOW OPT. QTY■ — NO STUDS A 24" O.C. AT CERAMIC AREAS. (16" O.C. MAX.) NOTE: INSTAL'" BRICK LEDGE ON (" tASONRY FIREPLACES —V—TUB BLOCKS INSTALLED AT CERAMIC AREAS. (MARK LOCATIONS) ON PRINT BUILDING PERMIT NUMBER HAILERS FOR FIBERGLASS TUBS INSTALLED FRONT PORCH WALL HT. TO BE _ MEASURE VINYL AREAS FOR SQUARE ABOVE TOP OF FTN■ WALL _ GB PANELS HAVE BLOCKS ON ENDS LOT ADDRESS -- HECK FOR LOAD - BEARING POINTS IN HOUSE AND PROPER LOAD TRAM FER FLUSH W/ 9 I/4" 1st FLR T.J.I.'e 2" ABOVE W/ 11 1/8" 1st FLR T.J.I.'6 b" ABO'✓E W/ 14" 1st FLR TJ.�.'s STRAP ANCHORS SECURED IN HOUSE MASONRY CRAWL SPACE AND BASEMENT GLEANED OUT FIREPLACE OPT. PRE -FAB TOWNSHIP STAIRWAY SHIMMED (MAX. 1r2" GAP EACH SIDE) e let AND 2nd FLOORS LINE UP IN STAIR WELL NOTE: INSTALL BRICK LEDGE ON MASONRY FIREPLACES NO GAPS ABOVE STAIRWAY DRAFTSTOP BUILDING PERMIT NUMBER _� STAIRWAY DROP CEILING DONE CORRECTLY (CHECK PRINTS) HANDRAIL BLOCKS INSTALLED 32" FROM STAIR NOSING LOT ADDRESS SAFETY BOOTS AND RAILS INSTALLED 3 1/2" FROM STRINGER CHECKLIST SQUASH BLOCKS INSTALLED PER PLAN AND T.J.(. DETAIL SHEET FLOOR SHEATHING NAILED PER SPEC.'S TOWNSHIP T MARK OUT ALL }- iAUNGHES NOT USED —�__ FALL PROTECTION INSTALLED AT STAIR WALL OPENINGS CHECKLIST -- _ MARK IN FRONT PORCH WALLS IF NOT ON PRINTS EYEBOLT AND ANCHOR POINT IN PLACE DAFT STOP INSTALLED ON CHASE AND BAND JOISTS DR WATER SLEEVE LOCATION MARKED — -AFT � 5UI"SP PUMP LOCATION MARKED SEWER AND WATER SLEEVE _.. __ HIGHLIGHT ALL Tu GKENED SLAB FOOTINGS ^_ ALL TYVECK STAPLED IN -PLACE EXTERIOR ALL HOLES PATCHED IN INSULATION BOARD SUMP PUMP SLEEVE LOCATION MARKED LOCATIONS MARKED (3'W/ 4" SEWER COUPLER, 5 W/ 1 1/2 SLEEVE. -- HIGHLIGHT ALL PAD FOOTING LOCATIONS ALL TRIM INSTALLED PER PRINT MARK OUT ALL HAUNCHES NOT USED HIGHLIGHT ALL BEAM POCKETS -- SEAM TAKEOFF SHEET COMPLTE AND TURNED IN TO FOUNDATION SUPERVISOR 3 1/2" RIPS 1/2 SHEATHING INSTALLED ON COf;a,IERS , MARK IN FRONT PORCH WALL HIGHLIGHT ALL PAD FTG. LOCATIONS IF NOT ON PRINTS (TO BE COMPLTED EVEN IF NO BEAMB REQUIRED) ALL WINDOWS TAPED ON TOP AND GLUED ON FOUR SIDES .. . ALL DOORS TAPED ABOVE? BEAM TAKE -OFF SHEET CZ)MPLTE AND TURNED IN TO FOUNDATION SUPERVISOR PRINT HUNG ON NAIL IN GARAGE 5= � (TO BE COMPLTED EVEN IF NO BEAMS REQUIRED) PERIMETER AND PANELS GLUED INTERIOR WALLS GLUED DOWN DONOT REMOVE BLUEPRINTS FROM JOBSITE INTERIOR AND EXTERIOR WALLS NAILED INTO TR�SSI`s BELOW SET TU55 INTO ROOM AND WIPE -OUT 1. EXCAVATOR PLACE PRINT TUBE INSIDE OF EXCAVATION, ATTIC ACCESS INSTALLED IN HOUSE PER PRINT, 12" SIDES ALL WINDOWS INSTALLED PER PRINT, ELEVATION AND STACK 2. WALL CONTRACTOR LEAVE ON TOP OF WALL. — JOIST HANGERS NAILED FRONT AND SIDES'``Y SITE PICKED UP AND PUT M PILE EACH DAY 3. PLUMBING CONTRACTOR LEAVE ON TOP OF WALL. 2X4 AROUND TOP of CHIMNEY, 1 1J2" PAST GNIrtiNEY FLAT ALL GIRDER TRUSSES NAILED PER ENGINEERING 4. CONCRETE CONTRACTOR LEAVE ON TOP OF WALL. REVISED 34119 : `'