Loading...
HomeMy WebLinkAbout0717.97.4.. _ .. + '- � 2 r � I 15 p 4 d) - r d) r I6IS AS SCHEDULED ! ! IX6 WINDOW 5TO \ _ - -- - - - -- - - - -- -- -- — Ix8 1 -- 1 1/2" 6YP. ARD I X4 ' O _ 4mll POLY VAPOR - - - 3 3 1/ WOOD BASE BARRIER \ -- - - -- -- ---- - - - - -- - -- - 2x4 5TUDS 0 16" O.G. ' 14 VIA. ANCHOR BOLT — — 13 12 It 10 q =p 8 N i _T � 6 5 0 4 � 2 r � I 15 p 4 d) - r d) r 12 2ND FLOORLINE IST FLOORLINE 9 I O 8 I r 6 w 4 m C'S 3 w. s^n #:2 ---------- 1 - - - \ -- BASEMENT FLOORLINE SCALE: NONE f I +I I t IL- I- 51DIN6 AS 5PEG1 i tV \ 1X8 IXIO FRIEZE Ixb I X4 CONCRETE BLOCK r � ROOF SHINGLES ^/ I5# FELT 1/2" 0515 !' I INSULATION BAFFLE R -38 BATT INSULATION AIR SPACE 2X6 ;' (2) 2x4 TOP PLATE METAL FLA5HIN6 (2) 2x4 TOP r-A r I T R II +! (2)2X12 HEADER ! 2X4 Ix8 FASCIA 1/2" GYP. BOARD X 3/8" EXT GRADE PLYWOOD W/ SOFFIT VENTS (2)2X6 HEADER 1x10 4 1/2" / / I WINDOW AS SCHEDULED ! ! IX6 WINDOW 5TO I 1/2" SHEATH ! r f M Ix8 1 1 1/2" 6YP. ARD I X4 2x4 OM PLATE 12 2ND FLOORLINE IST FLOORLINE 9 I O 8 I r 6 w 4 m C'S 3 w. s^n #:2 ---------- 1 - - - \ -- BASEMENT FLOORLINE SCALE: NONE f I +I I t IL- I- 51DIN6 AS 5PEG1 i tV \ 1X8 IXIO FRIEZE Ixb I X4 CONCRETE BLOCK r � ROOF SHINGLES ^/ I5# FELT 1/2" 0515 !' I INSULATION BAFFLE R -38 BATT INSULATION AIR SPACE 2X6 ;' (2) 2x4 TOP PLATE METAL FLA5HIN6 (2) 2x4 TOP r-A r I T R II +! (2)2X12 HEADER ! 2X4 Ix8 FASCIA 1/2" GYP. BOARD X 3/8" EXT GRADE PLYWOOD W/ SOFFIT VENTS (2)2X6 HEADER 1x10 4 1/2" / / I WINDOW AS SCHEDULED ! ! IX6 WINDOW 5TO I 1/2" SHEATH ! ! f f M Ix8 1 1 1/2" 6YP. ARD I X4 2x4 OM PLATE 4mll POLY VAPOR - - - 3 3 1/ WOOD BASE BARRIER 2x4 5TUDS 0 16" O.G. ' VIA. ANCHOR BOLT I/2" EXP. MATERIAL � -T ti ti _ FINISH 6RAVE _ - f ; 2;_ 4" CONCRETE SLAB FO►,1NDATION FORM 4" MIN. PEA GRAVEL I G. U. I" THICK RI61D INSULATION- EXTEND MIN. 2' -0" BENEATH SLAB 2'-0 _T/811 2' -O l /8" , i - 8" G.M.U. 12 "x24" CONCRETE 2' -1 1/8" 4' -1 3/4" 2' -1 1/8" FOOTING (2,500 PSI F) WaLwmoUV o AV M 3 5GALE: 3/6 "m 1' -0" SID oOMIn Eccnom SCALE= 5/4 "= I' -O" 8 1x10 j I li I I I; i II I I I I FRIEZE I - -- ` - J - J -,' �' L am_ _ -T Ixb AS 5PEGIFIED Ix8 I 51DIN AS 5PE I ED i \ 4�. C t� mr i 2' -0 '7/8" 2' -0 -7/8" 1/8" 4' -1 3/4" 2' -1 1/8" v ROOF SHINGLES W/ 15# FELT INSULATION BAFFLE ��.� R -38 BATT INSULATION AIR 5PAGE 2X6 / �; (2) 2x4 TOP PLATE- METAL FLASHING (2) 2x4 TOP PLATE �i��� (2)2X12 HEADER 2X4 1' Ix8 FASCIA � I/2" G'r'P. BOARD 3/8" EXT- GRADE PLYWOOD yjK Al SOFFIT VENTS (2)2X6 HEADER IXIO 41/2" i i i I WINDOW i A5 SCHEDULED f IX6 OR IX8 /2" OSB 1/2" BG PLYWOOD 2x4 4mli POLY VAPOR BARB! ER 2x4 5TUD5 ® 16 " O.G. 1 "X4" TRIM 1/2" INSULATED 5HEATHIN6 1/4" R5 SHEATHING I "X4" TRIM a,y WOHD ��oHgo SCALE: FINISH GRADE FOUNDATION G.M.U. n i O in 2x4 BOTTOM PLATE `\+ I 3 1/2" WOOD BASE �. 1/2' VIA. ANCHOR BOLT ' 16" LONG 0 6' -0" Or, OR STRAPS A5 RLO'D \\ 1/2" EXP. MATERIAL 4" WW RET'!; SLAB -- - 4" MIN. PEA GRAVEL I -- - - - -i" THICK RIGID INSULATION- EXTEND MIN. 2' -0" BENEATH 5LA5 =TE SCALE, 5/4 " -1'-0" ENGINE ENGINEERING GAD DRAF 6350 Westha Indianapolis, I c C T LL U c I*- L�m r X Lf C, u �l 1.69.41 ARCH!? HEbISiC