Loading...
HomeMy WebLinkAbout0876.97.7n ELEVATION 7.6-6 FULL 5RIGK FRONT 1/811 = I,-Ou 510E "Y/6ARME ELEVATIO 6 -G 011:: 11-0" PARTIAL LEFT ELEVATION 1/411 = I1 -011 W71 CONT. RIP6E VENT ROOF 5HIN6LE5 PER SPEC —_ LOUVERED VENT PER 5MC ---- BOX RAKE - 5EE DETAIL PER 5MC FLA5HIN6 A5 REQUIRED --- 1x3 FLAT ON 8 ( � Ix3 ON Ixl CORNICE TRIM - PETAIL PER 5MC PARTIAL FIR5T FLOOR PLAN 1/411 = 11-0" PARTIAL FOUNDATION PLAN 1/411 = I'-0'l FRONT ELEVATION 7.6-A 1/4° = I'-0° 2-2x8 HPR 3056 AL16N W/ BELOW 2-2x8 HPR 3056 ALIGN W/ BELOW 0A0'rIAI Gctrikin n MC? Dt Am APJU5T FOUNDATION 611 FOR 6° 130XOUT ABOVE AT SLAB 22x8 HPR ALIGN W/ BELOW 2-2x8 HPR 3056 ALIGN W/ BELOW 2-2x8 NPR 3056 ALIGN W/ BELOW 51PE ENTRY . 6ARME OPTION 7.6-A 1/4":: 11-01' \ CONT. RID6E VENT ROOF 5NIN6LE5 PER SPEC -CORNICE TRIM - PETAIL PER 5MC M aI5 PARTIAL RRONT ELEVATION 1/4' = 0 -00 G. M IC WANG Architects I 1365 Sher Rochester Michigan 4 (810)656-1 pu Master Project I N 17 DIVI 12220 Nor Suite #185 Carmel, In 5ub&Asion L *A F A' Job No. 235 Pate 155UE Sheet Ti6 FROI ELE' 1151XI PEI Sheet No ,o A ON c�1 N