Loading...
HomeMy WebLinkAbout0908.97.3N d N a� I f I 1/411 = 11.011 ., " Iy 161_1" � � 366??+,r 2-2x10 HOR 1 { '-1" III-0" 13R 3 1 -- IN 81-0" ac,. k 1i I CARPET " Iy 161_1" � � 366??+,r 2-2x10 HOR 1 { '-1" III-0" 13R 3 1 -- i a N 0 0 N 11 6' -21/2" N 0 VAULTED GLG i CARPET TB AFF CL �i 2 ( /� /� a�O 1 I � V d 6'-3 i /2" 24'-8" 151-9" BASE HOUSE 55'-0" 16411 SEE ELEVATIONS FOR TRAN501A SIZE AND HT 13'-8" 7'-4 3/4" 0 2 -2x12 CONT HDR ?7�A I ?7�� 3-3660 { I 17'-10 1/2" 1 161_1" � � 366??+,r 2-2x10 HOR 1 { '-1" III-0" 13R 3 IN 81-0" ac,. 1i I CARPET 1 6" H KNEEWALL SEE DETAIL �� o ��� I PER SPEC _ 81-0" 0.6. 2x6 BALLOON = VAULTEDCLG 1 - - -- ---- - - - - -- — — — — CARPET FRAME WALL CARPET 1 2" HDR DROP -- N I 12" OG. o _ � 714" 2/4 REF ELEV.5 I -5 1/2 L — — — — — H54 I REF ELEV.5 11 2 -7 1/4 I 11PbL 2/0 RETUR OTTER LINE SWW5 EXTENT OF TRIM d SEE ELEVATIONS FOR WINDOW REF ELEV.5 4'-0° 4' 3 I/2° 21.1111 I 3'-4" 12' 1" ", 5' 3 I/ 2x4 BOXOUT 51ZE5 IN THIS AREA 71.9" 2/8 32" WADE FACE OF 5TU0. ALL 5TUD5 ARE 3 1/2" UNLF-55 NO ALL DIMEN51ON5 PRESENTED HERE ARE FRAME DIMENSIONS ONLY - SEE 5147. 1.1 FOR FOUNDATION FOOTPRINT. REVIEW ALL WINDOW WR HEI6HT5 PER PLATE HT. AND 00 z VERIFY W/ ELEVATIONS AND CORNICE DETAIL5 DBL 1/6 I I uWiav 1 II 12 13 I AN/R 15 1 NOTES � I. ALL CASED OPENIN65 GREATER THAN 4811 WIDE BE OBTAINED PRIOR TO PROCEEDING WITH CON5TRUCTI HOLD HEADER TIGHT TO PLATE THE CONTRACTOR SHALL Be HELD RESPONSIBLE FOR AN s 6 BALUS E S 4211 H TO CONSTRUCTION AND /OR FABRICATION OF THE WORK. o HEADER HT = 83" AFF 4. 2x BLOCKING UNDER ALL EXTERIOR SWING DOOR5 1 PER SPEC I� KNEE4�ALL 6. TOWEL BARS (TB) OVER CABINETS AND TOILETS � _o 7. TOWEL BARS (TB) NOT OVER CABINETS AND TOILETS 3 5 6 8 9 10 11-811 I 111 0" d `_ 21-9 I /4" 2-TB I i- TILE AU FL 2/ tn 11 A i VINYL ° o 2/4 I �, r- ACCESS I o — — — J M 39" AFF 3 TH 24" AFF - I I `.k m 17 x oc VAULTED GLG CARPET N i 2/8 I v 41-0" I II 21'3" 11 61-8" I 1 204 1/2" i 5E60NP FLOOR PLAN 1/411 = I'-0" I N 4 13R 3 81-0" ac,. 1i I CARPET 1 v' I CARPET — 2x6 BALLOON FRAME WALL I 12" OG. 714" 2' -111 121.3u REF ELEV.5 L — — — — — — — I REF ELEV.5 REF ELEV.S SEE ELEVATIONS FOR WINDOW REF ELEV.5 SIZES, LOCATIONS AND HDR REF ELEV.5 51ZE5 IN THIS AREA 71.9" NOTE = ALL DIMEN51011,15 ARE FROM FACE OF STUD TO FACE OF 5TU0. ALL 5TUD5 ARE 3 1/2" UNLF-55 NO ALL DIMEN51ON5 PRESENTED HERE ARE FRAME DIMENSIONS ONLY - SEE 5147. 1.1 FOR FOUNDATION FOOTPRINT. REVIEW ALL WINDOW WR HEI6HT5 PER PLATE HT. AND VERIFY W/ ELEVATIONS AND CORNICE DETAIL5 NOTE; ERRORS AND OMISSIONS WHICH MAY OCCUR IN THE NTRAL DOCUMENT5 SHALL BE BROUGHT TO THE ATTENTION THE NOTES ARCHITECT, IN WRITING, AND WRITTEN IN51RUCTION L I. ALL CASED OPENIN65 GREATER THAN 4811 WIDE BE OBTAINED PRIOR TO PROCEEDING WITH CON5TRUCTI HOLD HEADER TIGHT TO PLATE THE CONTRACTOR SHALL Be HELD RESPONSIBLE FOR AN 2. ALL BI -FOLD DOOR5 R.O.'5 = 1 I /2" WIDER THAN DOOR5 ERRORS, D15GREPANCIE5 OR OMISSIONS FOR WHICH THE CONTRACTOR FAILED TO NOTIFY THE ARCHITECT PRIOR HEADER HT. = 82" AFF TO CONSTRUCTION AND /OR FABRICATION OF THE WORK. 3. ALL BI-PA55 DOOR5 R.O.'5 = SAME AS DOOR HEADER HT = 83" AFF 4. 2x BLOCKING UNDER ALL EXTERIOR SWING DOOR5 5. Ix BLOCKING UNDER ALL EXTERIOR SLIDING DOOR5 6. TOWEL BARS (TB) OVER CABINETS AND TOILETS BLOCK ING TO BE 55" AFF TO GL 7. TOWEL BARS (TB) NOT OVER CABINETS AND TOILETS BLOCKING TO BE 39" AFF TO GL 8. BLOCKING FOR T155UE HOLDERS (TH) TO BE 2411 AFF -- ALL EXTERIOR HEADER5 ARE 2-2x12 NOTE: FIELD CHECK ALL Sheet No. APPROPRIATE AND CURRENT PETAIL5 L FOR TH15 PROJECT PR IOR TO START N OF CON5TRUCTION 5r _ N Field verify all dimensions DO NO T SCALE DRA WINGS!