E R V I S 0 w U K S H E E T JI-lYLAND
FOUNDATION CHECKLIST
FRAME PUNCH _ OUT CHECK LIST
BASEMENT SLAB 1. GARAGE
PROJECT INFORMATION PROJECT INFORMATION GARAGE DOOR OPENING FRAMED TO CORRECT SIZE: i' HT., 8' OR *'WIDE.
GARAGE ATTIC ACCESS FRAMED TO CORRECT SIZE AND LOCATION.
NAILERS AT ALL CORNERS OF GARAGE AND CEILING.
GARAGE STEP FRAMED AND KICK PLATE UNDER DOOR
HOUSE NAME /ELEV. HOUSE NAME / ELEV. BOW STUDS
STRAP ANCHOR NAILED CORRECTLY
SET NUMBER SET NUMBER 2. HOUSE
PLAN / JOB NUMBER PLAN / JOB NUMBER CHECK FOR BOW STUDS
CHECK FOR NAILERS
STANDARD OR REVERSED MARK DOOR SWING DIRECTION AND SIZE
STANDARD OR REVERSED CHECK FOR CASING ROOM (M(N. 2" ON EACH SIDE)
CHECK CENTERLINE OF KITCHEN WINDOW
ANY NON -STD. CHANGES? ANY NON -STD. CHANGES? CHECK BULKHEAD DIMENSIONS (2" LONGER AND 2" WIDER THAN CABINETS)
CHECK WALL SIZES IN RELATION TO CABINET SPACE
FRONT OR SIDE LOAD CHECK VANITY SIZES IN RELATION TO WALL SPACE
FRONT O R SIDE LOAD CHECK VANITY DEPTH TO DOOR OPENING (MIN. 24 1/2 ")
CHECK DOOR OPERATION AND INSTALLATION
STD., ENLARGED, OR FULL BSMT. ALL SIDING OR BRICK FRONT CHECK WINDOW OPERATION AND INSTALLATION
(M SET ") (OPT. 293) COPT 295) (IN SET ") (OPT. 490) CHECK BASEMENT STAIR AND 2nd FLOOR STAIR INSTALLATION
PITCH RAIL WALL INSTALLED 1/2" BELOW STRINGER AND 1 1/2" SHORT
ALL SIDING OR BRICK FRONT HALF -WALL 42" FROM FLOOR AND SAME PITCH AS STAIRS (BOTH STAIRWAYS)
(IN SET,") (OPT. 490) MASONRY HALF -WALL AT STAIRS PAST STRINGER 1 1/2"
FIREPLACE OPT. PRE -FAB — TUB PLATFORM BUILT CORRECTLY 16 1/2" HT., 39" X 51" INSIDE
BSMT. WINDOW OPT. QTY. NO STUDS + 24" O.C. AT CERAMIC AREAS. (16" O.C. MAX.)
NOTE: INSTALL BRICK LEDGE ON MASONRY FIREPLACES LOCATION(S) ON PRINT
(MARK TUB BLOCIGS INSTALLED AT CERAMIC AREAS.
BUILDING PERMIT NUMBER NAILERS FOR FIBERCsLASS TUBS INSTALLED
FRONT PORCH WALL H T. T O B E - - MEASURE VINYL AREAS FOR SQUARE
ABOVE TOP OF FTN. WALL CB PANELS HAVE BLOCKS ON ENDS
FLUSH W/ 9 1/4" let FLR TJ.I.'a 2" ABOVE W/ 11 1/8" let FLR TJ.I: a 6" ABOVE W/ 14"16t FLR TJ.I.'s
LOT ADDRESS CHECK FOR LOAD-BEARING POINTS IN HOUSE AND PROPER LOAD TRANSFER
STRAP ANCHORS SECURED IN HOUSE
MASONRY GRAWL SPACE AND BASEMENT CLEANED OUT
FIREPLACE OPT. PRE -FAB TOWNSHIP STAIRWAY SHIMMED (MAX 1/2" GAP EACH SIDE)
NOTE: INSTALL BRICK LEDGE ON MASONRY FIREPLACES lat AND 2nd FLOORS LINE UP IN STAIR WELL
NO GAPS ABOVE STAIRWAY DRAFTSTOP
BUILDING PERMIT NUMBER STAIRWAY DROP CEILING DONE CORRECTLY (CHECK PRINTS)
HANDRAIL BLOCKS INSTALLED 32" FROM STAIR NOSING
LOT ADDRESS SAFETY BOOTS AND RAILS INSTALLED 3 1/2" FROM STRINGER
CHECKLIST SQUASH BLOCKS INSTALLED PER PLAN AND TJ.1. DETAIL SHEET
FLOOR SHEATHING: NAILED PER SPEC.'s
TOWNSHIP
MARK OUT ALL HAUNCHES NOT USED FALL PROTECTION INSTALLED At STAIR WALL OPENINGS
CHECKLIST MARK IN FRONT PORCH WALLS IF NOT ON PRINTS EYEBOLT AND ANCHOR POINT IN PLACE
WATER SLEEVE LOCATION MARKED ALL DRAFT STOP INSTALLED ON CHASE AND BAND JOISTS
SUMP PUMP LOCATION MARKED SEWER AND WATER SLEEVE
HIGHLIGHT ALL THICKENED SLAB FOOTINGS ALL TYVECK STAPLED IN -PLACE EXTERIOR
SUMP PUMP SLEEVE LOCATION MARKED LOCATIONS MARKED (3' W/ 4" SEWER HIGHLIGHT ALL PAD FOOTING LOCATIONS ALL HOLES PATCHED IN INSULATION BOARD
COUPLER, 5'W/ 1 1/2" SLEEVE) ALL TRIM INSTALLED PER PRINT
MARK OUT ALL HAUNCHES NOT USED HIGHLIGHT ALL BEAM POCKETS BEAM TAKE -OFF SHEET COMPLTE AND TUNED IN
TO FOUNDATION SUPERVISOR 3 1/2" RIPS 1/2 SHEATHING INSTALLED ON CORNERS
MARK M FRONT PORCH WALL HIGHLIGHT ALL PAD FTG. LOCATIONS (TO BE COMPLTED EVEN IF NO BEAMS REQUIRED) ALL WINDOWS TAPED ON TOP ANC GLUED ON FOUR SIDES
IF NOT ON PRINTS
BEAM LAKE -OFF SHEET GOMPL7E AND TURNED ALL DOORS TAPED ABOVE IN - - -, -- -
TO FOUNDATION SUPERVISOR PRINT HUNG ON NAIL IN GARAGE
(TO BE GOMPLTED EVEN IF NO BEAMS REQUIRED) PERIMETER AND PANELS G -CUED `
INTERIOR WALLS GLUED DOWN
DO N REMOVE BLUEPRINTS FROM JOBSITE AND EXTERIOR WALLS NAILED INTO TRUSSES BELOW
_ SET TUBS INTO ROOM AND WIPE -OUT
I. EXCAVATOR PLACE PRINT TUBE INSIDE OF EXCAVATION. ATTIC ACCESS INSTALLED IN HOUSE PER PRINT, 12" SIDES
Q
w ALL WINDOWS INSTALLED PER PRINT, ELEVATION AND STACK
° 2. WALL CONTRACTOR LEAVE ON TOP OF WALL. JOIST HANGERS NAILED FRONT AND SIDES
d
SITE PICKED ,IP AND PUT IN PILE EACH DAY
2X4 AROUND TOP of CHIMNEY, 1 112" PAST CHIMNEY FLAT
3. PLUMBING CONTRACTOR LEAVE ON TOP OF WALL.
ALL GIRDER TRUSSES NAILED PER ENGINEERING
4. CONCRETE CONTRACTOR LEAVE ON TOP OF WALL.