HomeMy WebLinkAbout0916.97.17U,P E R V I S 0 w U K S H E E T JI-lYLAND FOUNDATION CHECKLIST FRAME PUNCH _ OUT CHECK LIST BASEMENT SLAB 1. GARAGE PROJECT INFORMATION PROJECT INFORMATION GARAGE DOOR OPENING FRAMED TO CORRECT SIZE: i' HT., 8' OR *'WIDE. GARAGE ATTIC ACCESS FRAMED TO CORRECT SIZE AND LOCATION. NAILERS AT ALL CORNERS OF GARAGE AND CEILING. GARAGE STEP FRAMED AND KICK PLATE UNDER DOOR HOUSE NAME /ELEV. HOUSE NAME / ELEV. BOW STUDS STRAP ANCHOR NAILED CORRECTLY SET NUMBER SET NUMBER 2. HOUSE PLAN / JOB NUMBER PLAN / JOB NUMBER CHECK FOR BOW STUDS CHECK FOR NAILERS STANDARD OR REVERSED MARK DOOR SWING DIRECTION AND SIZE STANDARD OR REVERSED CHECK FOR CASING ROOM (M(N. 2" ON EACH SIDE) CHECK CENTERLINE OF KITCHEN WINDOW ANY NON -STD. CHANGES? ANY NON -STD. CHANGES? CHECK BULKHEAD DIMENSIONS (2" LONGER AND 2" WIDER THAN CABINETS) CHECK WALL SIZES IN RELATION TO CABINET SPACE FRONT OR SIDE LOAD CHECK VANITY SIZES IN RELATION TO WALL SPACE FRONT O R SIDE LOAD CHECK VANITY DEPTH TO DOOR OPENING (MIN. 24 1/2 ") CHECK DOOR OPERATION AND INSTALLATION STD., ENLARGED, OR FULL BSMT. ALL SIDING OR BRICK FRONT CHECK WINDOW OPERATION AND INSTALLATION (M SET ") (OPT. 293) COPT 295) (IN SET ") (OPT. 490) CHECK BASEMENT STAIR AND 2nd FLOOR STAIR INSTALLATION PITCH RAIL WALL INSTALLED 1/2" BELOW STRINGER AND 1 1/2" SHORT ALL SIDING OR BRICK FRONT HALF -WALL 42" FROM FLOOR AND SAME PITCH AS STAIRS (BOTH STAIRWAYS) (IN SET,") (OPT. 490) MASONRY HALF -WALL AT STAIRS PAST STRINGER 1 1/2" FIREPLACE OPT. PRE -FAB — TUB PLATFORM BUILT CORRECTLY 16 1/2" HT., 39" X 51" INSIDE BSMT. WINDOW OPT. QTY. NO STUDS + 24" O.C. AT CERAMIC AREAS. (16" O.C. MAX.) NOTE: INSTALL BRICK LEDGE ON MASONRY FIREPLACES LOCATION(S) ON PRINT (MARK TUB BLOCIGS INSTALLED AT CERAMIC AREAS. BUILDING PERMIT NUMBER NAILERS FOR FIBERCsLASS TUBS INSTALLED FRONT PORCH WALL H T. T O B E - - MEASURE VINYL AREAS FOR SQUARE ABOVE TOP OF FTN. WALL CB PANELS HAVE BLOCKS ON ENDS FLUSH W/ 9 1/4" let FLR TJ.I.'a 2" ABOVE W/ 11 1/8" let FLR TJ.I: a 6" ABOVE W/ 14"16t FLR TJ.I.'s LOT ADDRESS CHECK FOR LOAD-BEARING POINTS IN HOUSE AND PROPER LOAD TRANSFER STRAP ANCHORS SECURED IN HOUSE MASONRY GRAWL SPACE AND BASEMENT CLEANED OUT FIREPLACE OPT. PRE -FAB TOWNSHIP STAIRWAY SHIMMED (MAX 1/2" GAP EACH SIDE) NOTE: INSTALL BRICK LEDGE ON MASONRY FIREPLACES lat AND 2nd FLOORS LINE UP IN STAIR WELL NO GAPS ABOVE STAIRWAY DRAFTSTOP BUILDING PERMIT NUMBER STAIRWAY DROP CEILING DONE CORRECTLY (CHECK PRINTS) HANDRAIL BLOCKS INSTALLED 32" FROM STAIR NOSING LOT ADDRESS SAFETY BOOTS AND RAILS INSTALLED 3 1/2" FROM STRINGER CHECKLIST SQUASH BLOCKS INSTALLED PER PLAN AND TJ.1. DETAIL SHEET FLOOR SHEATHING: NAILED PER SPEC.'s TOWNSHIP MARK OUT ALL HAUNCHES NOT USED FALL PROTECTION INSTALLED At STAIR WALL OPENINGS CHECKLIST MARK IN FRONT PORCH WALLS IF NOT ON PRINTS EYEBOLT AND ANCHOR POINT IN PLACE WATER SLEEVE LOCATION MARKED ALL DRAFT STOP INSTALLED ON CHASE AND BAND JOISTS SUMP PUMP LOCATION MARKED SEWER AND WATER SLEEVE HIGHLIGHT ALL THICKENED SLAB FOOTINGS ALL TYVECK STAPLED IN -PLACE EXTERIOR SUMP PUMP SLEEVE LOCATION MARKED LOCATIONS MARKED (3' W/ 4" SEWER HIGHLIGHT ALL PAD FOOTING LOCATIONS ALL HOLES PATCHED IN INSULATION BOARD COUPLER, 5'W/ 1 1/2" SLEEVE) ALL TRIM INSTALLED PER PRINT MARK OUT ALL HAUNCHES NOT USED HIGHLIGHT ALL BEAM POCKETS BEAM TAKE -OFF SHEET COMPLTE AND TUNED IN TO FOUNDATION SUPERVISOR 3 1/2" RIPS 1/2 SHEATHING INSTALLED ON CORNERS MARK M FRONT PORCH WALL HIGHLIGHT ALL PAD FTG. LOCATIONS (TO BE COMPLTED EVEN IF NO BEAMS REQUIRED) ALL WINDOWS TAPED ON TOP ANC GLUED ON FOUR SIDES IF NOT ON PRINTS BEAM LAKE -OFF SHEET GOMPL7E AND TURNED ALL DOORS TAPED ABOVE IN - - -, -- - TO FOUNDATION SUPERVISOR PRINT HUNG ON NAIL IN GARAGE (TO BE GOMPLTED EVEN IF NO BEAMS REQUIRED) PERIMETER AND PANELS G -CUED ` INTERIOR WALLS GLUED DOWN DO N REMOVE BLUEPRINTS FROM JOBSITE AND EXTERIOR WALLS NAILED INTO TRUSSES BELOW _ SET TUBS INTO ROOM AND WIPE -OUT I. EXCAVATOR PLACE PRINT TUBE INSIDE OF EXCAVATION. ATTIC ACCESS INSTALLED IN HOUSE PER PRINT, 12" SIDES Q w ALL WINDOWS INSTALLED PER PRINT, ELEVATION AND STACK ° 2. WALL CONTRACTOR LEAVE ON TOP OF WALL. JOIST HANGERS NAILED FRONT AND SIDES d SITE PICKED ,IP AND PUT IN PILE EACH DAY 2X4 AROUND TOP of CHIMNEY, 1 112" PAST CHIMNEY FLAT 3. PLUMBING CONTRACTOR LEAVE ON TOP OF WALL. ALL GIRDER TRUSSES NAILED PER ENGINEERING 4. CONCRETE CONTRACTOR LEAVE ON TOP OF WALL. REVISED 3/x21'9-1:'