Loading...
HomeMy WebLinkAbout0470.97.62nd FLOOR ROUGH FRAMING NOTES: 1. USE (2) -2x4 CRIPPLES UNDER EACH END OF HEADER FOR OPENINGS 6'-0" OR GREATER IN WIDTH 2. REFER TO MECHANICAL PLAN FOR BULKHEAD AND DROP CEILING LOCATIONS. 3. ALL BEAMS TO HAVE MINIMUM (2) -2x4 STUDS UNDER EACH END FOR BEARING SUPPORT 4. ALL WALLS TO BE 2x4 STUDS AT 16" O.C. UNLESS NOTED OTHERWISE 5. ALL WINDOWS TO HAVE DRIP CAP MATERIAL AT TOP 6. STANDARD HEADER HEIGHT AT 6' -10 718" A.F.F. (U.N.O.) 7. FINISH FLOOR REFERENCES ARE TO TOP OF DECKING noles.trm03 WINDOW SCHEDULE 01 DESCRIPTION ROUGH OPENING W X H HEADER HEIGHT REMARKS I CW2452 -2SA 4' -0 1/2 "x 4' -5 1/4' 4'-5 1/4" i DW20 -28 -20/28 7' -0 3/4 "x 5' -5 3/4" 5' -5 3/4' 1 DU2824 2'-10 "x 4' -9 3/4" 4' -9 3/4' 4' -2' 4 DW2828 2'-10"x 5' -5 3/4" 5' -5 3/4" I 2 DW2828 -2 5'-7 I /2 "x 5`5 3/4' 5' -5 3/4" 2x4 DOOR SCHEDULE SYMBOL O LOCATION DESCRIPTION R.O.W. R.O.H. HEADER SIZEI REMARKS -- - - - - -- I 1 /61NT -R i' -8' 6' -10 1/2' 2x4 -- - --- -- 1 2- 2 /OINT 4' -2' 6'-10 112" 2x4 -- - - - - -- I 2-2/41NT 4'-10" 6' -10 1/2" 2x4 -- - - - - -- 1 2-2/61NT 5'-2' 6'-10 1/2' 2x4 -- - - - - -- 2 2 /41NT -L 2'-6' 1 6'-10 112" 2x4 -- - - - - -- 3 2 /41NT -R 2'-6' 1 6' -10 112" 2x4 -- - - - - -- 3 2 /61NT -L 2'-8" 6' -10 112' 1 2x4 -- - - - - -- 1 5 /OCO 5'-2" 6'-10 1/2' 1 2x4 6W - II" SECOND FLOOR FRAME PLAN 60' .70'