FOUNDATION CHECKLIST
BASEMENT
PROJECT INFORMATION
HOUSE NAME / ELEV.
SET NUMBER
PLAN / JOB NUMBER
RIGHT HAND OR LEFT HAND
ANY NON -STD. CHANGES?
FRONT OR SIDE LOAD GARAGE
STD., ENLARGED, OR FULL BSMT.
(IN SET ') (OPT. 293) (OPT. 2%)
ALL SIDING OR BRICK FRONT
(IN SET 0) (OPT. 4W)
BSMT. WINDOW OPT. QTY.
(MARK LOCATION(5) ON PRINT
FRONT PORCH WALL HT. TO BE
ABOVE TOP OF FTN. WALL
2" ABOVE W/ 11 118" let FLR TJ.I.'a 6" ABOVE W/ 14" let FLR T.J.I.'e
MASONRY
FIREPLACE OPT. PRE -FAB
NOTE: INSTALL BRiCX' LEDGE ON MASONRY FIREPLACES
BUILDING PERMIT NUMBER
LOT ADDRESS
TOWNSHIP
CHECKLIST
SUMP PUMP LOCATION MARKED SEWER AND WATER SLEEVE
EJECTOR PIT LOCATION MARKED LOCATIONS MARKED (3' W/ 4' SEWER
COUPLER, 5'W/ 1 1/2 SLEEVE)
MARK OUT ALL HAUNCHES NOT USED HIGHLIGHT ALL BEAM POCKETS
MARK IN FRONT PORCH WALL
IF NOT ON PRINTS HIGHLIGHT ALL PAD FTG. LOCATIONS
PRE -START CHECKLIST TURNED IN MARK ONE OR TWO GARAGE DOORS
ATTACH SELECTION SHEET TO WALL _ 55MT. BATH ROUGH -IN LOCATIONS
CONTRACTOR PRINTS DO NOT INTERFERE WITH FURNACE 05,
ATTACH PLOT PLAN AND STAKE SHEET STANTION POST LOCATIONS
TO EXCAVATOR PRINT. MAKE SURE THEY MATCH
EACH OTHER AND SELECTION SHEET
i.e. STANDARD OR REVERSED
T MARK -UP ALL NON - STANDARD CHANGES, HOUSE
EXTENSIONS, AN[-) GARAGE EXTENSIONS
- -- BEAM TAKE -OFF SNEi=T COMPLETE AND TUF;NE!D IN
10 FOUNDATION SUPERVISOR
(TO BE COMPLTED EVEN IF NO BEAMS REQUIRFr,)
- — ADD 1" Tc; E35MT. STEEL 5EAM5 0% WALK - CUT
BASEMENTS i; 5i[:E IJALL S STEP DCwLJN
BASFI- -ENT WINDOL! LOCATIONS DO NOT I I T ERFERE
WITH FIREPLACES .: -CKS, OR BAY WINDOWS
PROJECT INFORMATION
HOUSE NAME / ELEV.
SET NUMBER
PLAN / JOB NUMBER
RIGHT HAND OR LEFT HAND
ANY NON -STD. CHANGES?
FRONT OR SIDE LOAD GARAGE
ALL SIDING OR BRICK FRONT
(IN SET ") (OPT. 490)
FIREPLACE OPT.
NOTE: INSTALL BRICK LEDGE ON MASONRY FIREPLACES
BUILDING PERMIT NUMBER
LOT ADDRESS
TOWNSHIP
CHECKLIST
MASONRY
PRE -FAB
—_ MARK OUT ALL HAUNCHES NOT USED
MARK IN FRONT PORCH WALLS IF NOT ON PRINTS
WATER SLEEVE LOCATION MARKED
HIGHLIGHT ALL THICKENED SLAB FOOTINGS
HIGHLIGHT ALL PAD FOOTING LOCATIONS
BEAM TAKE -OFF SHEET GOMPLTE AND TUNED IN
TO FOUNDATION SUPERVISOR
(TO BE COMPLTED EVEN IF NO BEAMS REQUIRED)
MARK ONE OR TWO GARAGE DOORS
ATTACH PLOT PLAN AND STAKE 544=_ET
TO EXCAVATOR PRINT. MAKE SURE THE -i' MATCH
EACH OTHER AND SELECTION SHEET
I.e. STANDARD OR REVERSED
ATTACH SELECTION SHEET TO FLOCK
CONTRACTOR PRINTS
MARK -UP ALL NON- STANDARD CH4NGES, HOUSE
EXTENSIONS, AND GARAGE EXTENSIONS
-_ _ -. -- PRE -START CHECKLIST TURNED !N
0
REVISED 10/7/91
FRAME PUNCH -OUT CHECK LIST
1. GARAGE
_ GARAGE DOOR OPENING FRAMED TO CORRECT 51ZE: 1' HT., 8' OR 16' WIDE.
GARAGE ATTIC ACCE55 FRAMED TO CORRECT SIZE AND LOCATION
NAILER5 AT ALL CORNERS OF GARAGE AND CEILING.
GARAGE STEP FRAMED AND KiCK PLATE UNDER DOOR
BOW STUDS
STRAP ANCHOR NAILED CORRECTLY
EQUAL RISER HEIGHT AT GARAGE STEPS (8 1/4" MAX.)
PRINT HUNG ON NAIL IN GARAGE
CHECK FOR LOAD - BEARING POINTS AND PROPER LOAD TRANSFER
2. BASEMENT AND HOUSE
CHECK BASEMENT STAIR AND 2nd FLOOR STAIR INSTALLATION
HALF -WALL 42" FROM FLOOR AND SAME PITCH AS STAIRS 11/2" PAST STRINGER
CB PANELS HAVE BLOCKS ON ENDS
CHECK FOR LOAD - BEARING POINTS AND PROPER LOAD TRANSFER
STRAP ANCHORS SECURED IN HOUSE
5TAIRWAY SHIMMED (MAX. 1/2" GAP EACH SIDE)
HANDRAIL BLOCKS INSTALLED 32" FROM STAIR NOSING AND LOFT NEWELL POSTS
SAFETY BOOTS AND RAILS INSTALLED 3 I/2" FROM STRINGER
BARRICADE BACK DOOR IF STEP 15 GREATER THAN IV'
SQUASH BLOCKS INSTALLED PER PLAN AND TJ.1. DETAIL SHEET
CRAUIL SPACE AND BASEMENT CLEANED OUT
FILL GAPS W/ PLYWD. WHERE T.J.!_'s MEET IN CORNERS AND FIREPLACE CANT.'e
3. HOUSE
CHECK FOR BOW STUDS
CHEuK FOR NAILERS
MARK DOOR SWING DIRECTION AND SIZE
CHE:rK FOR CASING ROOM (MIN. 2" ON EACH SIDE)
CHECK CENTERLINE OF KITCHEN WINDOW
CHECK BULKHEAD DIMENSIONS (2" LONGER AND 2" WIDER THAN CABINETS)
CHECK WALL SIZES IN RELATION TO CABINET SPACE
CHE(;K VANITY 51ZES IN RELATION TO WALL SPACE
CHECK VANITY DEPTH TO DOOR OPENING (MIN. 24 1/2".)
CHECK DOOR OPERATION AND INSTALLATION
CHECK WINDOW OPERATION AND INSTALLATION
PITC -i RAIL WALL INSTALLED 1/2" BELOW STRINGER AND I Il SNORT
TUB -PLATFORM BUILT CORRECTLY 16 1/2" HT., 38" X 51" INSIDE
NAILERS FOR FIBERGLASS TUBS AND CASING AROUND TUBS INSTALLED.
MEAT .IRE VINYL AREAS FOR SQUARE
let AND 2nd FLOORS LINE UP IN STAIR WELL
NO GAPS ABOVE STAIRWAY DRAFTSTOP
STAIRWAY DROP CEILING DONE CORRECTLY (CHECK PRINTS)
FLOUR SHEATHING NAILED PER SPEC.'e
FALL PROTECTION INSTALLED AT STAIR WALL OPENINGS
EYEP30LT AND ANCHOR POINT IN PLACE
ALL DRAFT STOP INSTALLED ON CHASE. AND BAND J01375
PERIMETER AND PANELS GLUED
INTERIOR WALLS GLUED DOWN
INTER;OR AND EXTERIOR WALLS NAILED INTG I- JOISTS 5ELO'J1
SET TUBS INTO ROOM AND WIPE -OUT
ATTIu' ;CCE55 INSTALLED IN HOUSE PER PRINT, 12" SIDES
JOIST MANGERS NAILED FRONT AND SIDES
_ ALL GIRDER TRUSSES NAILED PER ENGINEERING
4. EXTERIOR
ALL 1 "VECK STAPLED IN -PLACE EXTERIOR
ALL +SOLES PATCHED IN INSULATION BOARD
ALL T F',!M 'INSTALLED PER PRINT
3 112". RIPS 1,12 SHEATHING INSTALLED ON CORNERS
AL' W NDOWS TAPED ON TOP AND GLUED ON FOUR SIDES
i
ALL DCtiOR5 TAPED ABOVE
ALL ;,JiNDOWS INSTALLED =ER PRINT, ELEVATION AN)'-.) STA ^.K
°jTE '+EKED OF AND PUT IN PILE: EACH DAY
2X1 -' k0;.iND TOP OF C+41MNEY, 1 1,7" PAST CHIMNEY FLAT
__ -_- AL.. TRUSSES NAILED PER ENG!NEERIW,
_ iX4 EXTENSIONS INSTALLED AT °`:ONT D0OR AND WINDOW 5URRCUNDS
- - -.___ FLAC-- ',N3 'INSTALLED UNDER FR ;SIT DOOf-� AND GARAGE RETIII`IV WALL J.t