Loading...
HomeMy WebLinkAbout1382.97.19SUPERVISOR WORKSHEET I RYLAND FOUNDATION CHECKLIST BASEMENT PROJECT INFORMATION HOUSE NAME / ELEV. SET NUMBER PLAN / JOB NUMBER RIGHT HAND OR LEFT HAND ANY NON -STD. CHANGES? FRONT OR SIDE LOAD GARAGE STD., ENLARGED, OR FULL BSMT. (IN SET ') (OPT. 293) (OPT. 2%) ALL SIDING OR BRICK FRONT (IN SET 0) (OPT. 4W) BSMT. WINDOW OPT. QTY. (MARK LOCATION(5) ON PRINT FRONT PORCH WALL HT. TO BE ABOVE TOP OF FTN. WALL 2" ABOVE W/ 11 118" let FLR TJ.I.'a 6" ABOVE W/ 14" let FLR T.J.I.'e MASONRY FIREPLACE OPT. PRE -FAB NOTE: INSTALL BRiCX' LEDGE ON MASONRY FIREPLACES BUILDING PERMIT NUMBER LOT ADDRESS TOWNSHIP CHECKLIST SUMP PUMP LOCATION MARKED SEWER AND WATER SLEEVE EJECTOR PIT LOCATION MARKED LOCATIONS MARKED (3' W/ 4' SEWER COUPLER, 5'W/ 1 1/2 SLEEVE) MARK OUT ALL HAUNCHES NOT USED HIGHLIGHT ALL BEAM POCKETS MARK IN FRONT PORCH WALL IF NOT ON PRINTS HIGHLIGHT ALL PAD FTG. LOCATIONS PRE -START CHECKLIST TURNED IN MARK ONE OR TWO GARAGE DOORS ATTACH SELECTION SHEET TO WALL _ 55MT. BATH ROUGH -IN LOCATIONS CONTRACTOR PRINTS DO NOT INTERFERE WITH FURNACE 05, ATTACH PLOT PLAN AND STAKE SHEET STANTION POST LOCATIONS TO EXCAVATOR PRINT. MAKE SURE THEY MATCH EACH OTHER AND SELECTION SHEET i.e. STANDARD OR REVERSED T MARK -UP ALL NON - STANDARD CHANGES, HOUSE EXTENSIONS, AN[-) GARAGE EXTENSIONS - -- BEAM TAKE -OFF SNEi=T COMPLETE AND TUF;NE!D IN 10 FOUNDATION SUPERVISOR (TO BE COMPLTED EVEN IF NO BEAMS REQUIRFr,) - — ADD 1" Tc; E35MT. STEEL 5EAM5 0% WALK - CUT BASEMENTS i; 5i[:E IJALL S STEP DCwLJN BASFI- -ENT WINDOL! LOCATIONS DO NOT I I T ERFERE WITH FIREPLACES .: -CKS, OR BAY WINDOWS PROJECT INFORMATION HOUSE NAME / ELEV. SET NUMBER PLAN / JOB NUMBER RIGHT HAND OR LEFT HAND ANY NON -STD. CHANGES? FRONT OR SIDE LOAD GARAGE ALL SIDING OR BRICK FRONT (IN SET ") (OPT. 490) FIREPLACE OPT. NOTE: INSTALL BRICK LEDGE ON MASONRY FIREPLACES BUILDING PERMIT NUMBER LOT ADDRESS TOWNSHIP CHECKLIST MASONRY PRE -FAB —_ MARK OUT ALL HAUNCHES NOT USED MARK IN FRONT PORCH WALLS IF NOT ON PRINTS WATER SLEEVE LOCATION MARKED HIGHLIGHT ALL THICKENED SLAB FOOTINGS HIGHLIGHT ALL PAD FOOTING LOCATIONS BEAM TAKE -OFF SHEET GOMPLTE AND TUNED IN TO FOUNDATION SUPERVISOR (TO BE COMPLTED EVEN IF NO BEAMS REQUIRED) MARK ONE OR TWO GARAGE DOORS ATTACH PLOT PLAN AND STAKE 544=_ET TO EXCAVATOR PRINT. MAKE SURE THE -i' MATCH EACH OTHER AND SELECTION SHEET I.e. STANDARD OR REVERSED ATTACH SELECTION SHEET TO FLOCK CONTRACTOR PRINTS MARK -UP ALL NON- STANDARD CH4NGES, HOUSE EXTENSIONS, AND GARAGE EXTENSIONS -_ _ -. -- PRE -START CHECKLIST TURNED !N 0 REVISED 10/7/91 FRAME PUNCH -OUT CHECK LIST 1. GARAGE _ GARAGE DOOR OPENING FRAMED TO CORRECT 51ZE: 1' HT., 8' OR 16' WIDE. GARAGE ATTIC ACCE55 FRAMED TO CORRECT SIZE AND LOCATION NAILER5 AT ALL CORNERS OF GARAGE AND CEILING. GARAGE STEP FRAMED AND KiCK PLATE UNDER DOOR BOW STUDS STRAP ANCHOR NAILED CORRECTLY EQUAL RISER HEIGHT AT GARAGE STEPS (8 1/4" MAX.) PRINT HUNG ON NAIL IN GARAGE CHECK FOR LOAD - BEARING POINTS AND PROPER LOAD TRANSFER 2. BASEMENT AND HOUSE CHECK BASEMENT STAIR AND 2nd FLOOR STAIR INSTALLATION HALF -WALL 42" FROM FLOOR AND SAME PITCH AS STAIRS 11/2" PAST STRINGER CB PANELS HAVE BLOCKS ON ENDS CHECK FOR LOAD - BEARING POINTS AND PROPER LOAD TRANSFER STRAP ANCHORS SECURED IN HOUSE 5TAIRWAY SHIMMED (MAX. 1/2" GAP EACH SIDE) HANDRAIL BLOCKS INSTALLED 32" FROM STAIR NOSING AND LOFT NEWELL POSTS SAFETY BOOTS AND RAILS INSTALLED 3 I/2" FROM STRINGER BARRICADE BACK DOOR IF STEP 15 GREATER THAN IV' SQUASH BLOCKS INSTALLED PER PLAN AND TJ.1. DETAIL SHEET CRAUIL SPACE AND BASEMENT CLEANED OUT FILL GAPS W/ PLYWD. WHERE T.J.!_'s MEET IN CORNERS AND FIREPLACE CANT.'e 3. HOUSE CHECK FOR BOW STUDS CHEuK FOR NAILERS MARK DOOR SWING DIRECTION AND SIZE CHE:rK FOR CASING ROOM (MIN. 2" ON EACH SIDE) CHECK CENTERLINE OF KITCHEN WINDOW CHECK BULKHEAD DIMENSIONS (2" LONGER AND 2" WIDER THAN CABINETS) CHECK WALL SIZES IN RELATION TO CABINET SPACE CHE(;K VANITY 51ZES IN RELATION TO WALL SPACE CHECK VANITY DEPTH TO DOOR OPENING (MIN. 24 1/2".) CHECK DOOR OPERATION AND INSTALLATION CHECK WINDOW OPERATION AND INSTALLATION PITC -i RAIL WALL INSTALLED 1/2" BELOW STRINGER AND I Il SNORT TUB -PLATFORM BUILT CORRECTLY 16 1/2" HT., 38" X 51" INSIDE NAILERS FOR FIBERGLASS TUBS AND CASING AROUND TUBS INSTALLED. MEAT .IRE VINYL AREAS FOR SQUARE let AND 2nd FLOORS LINE UP IN STAIR WELL NO GAPS ABOVE STAIRWAY DRAFTSTOP STAIRWAY DROP CEILING DONE CORRECTLY (CHECK PRINTS) FLOUR SHEATHING NAILED PER SPEC.'e FALL PROTECTION INSTALLED AT STAIR WALL OPENINGS EYEP30LT AND ANCHOR POINT IN PLACE ALL DRAFT STOP INSTALLED ON CHASE. AND BAND J01375 PERIMETER AND PANELS GLUED INTERIOR WALLS GLUED DOWN INTER;OR AND EXTERIOR WALLS NAILED INTG I- JOISTS 5ELO'J1 SET TUBS INTO ROOM AND WIPE -OUT ATTIu' ;CCE55 INSTALLED IN HOUSE PER PRINT, 12" SIDES JOIST MANGERS NAILED FRONT AND SIDES _ ALL GIRDER TRUSSES NAILED PER ENGINEERING 4. EXTERIOR ALL 1 "VECK STAPLED IN -PLACE EXTERIOR ALL +SOLES PATCHED IN INSULATION BOARD ALL T F',!M 'INSTALLED PER PRINT 3 112". RIPS 1,12 SHEATHING INSTALLED ON CORNERS AL' W NDOWS TAPED ON TOP AND GLUED ON FOUR SIDES i ALL DCtiOR5 TAPED ABOVE ALL ;,JiNDOWS INSTALLED =ER PRINT, ELEVATION AN)'-.) STA ^.K °jTE '+EKED OF AND PUT IN PILE: EACH DAY 2X1 -' k0;.iND TOP OF C+41MNEY, 1 1,7" PAST CHIMNEY FLAT __ -_- AL.. TRUSSES NAILED PER ENG!NEERIW, _ iX4 EXTENSIONS INSTALLED AT °`:ONT D0OR AND WINDOW 5URRCUNDS - - -.___ FLAC-- ',N3 'INSTALLED UNDER FR ;SIT DOOf-� AND GARAGE RETIII`IV WALL J.t